Original source · versioned page text
Driveway Crossover DA Form 1
Section 2 — Further development details
2 2)
Material change of use 0 Yes -— complete division 1 if assessable against a local planning instrument
Reconfiguring a lot C1 Yes — complete division 2
Operational work mM Yes — complete division 3
Building work 0 Yes - complete DA Form 2 ~ Buitding work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
focal planning instrument.
8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if appticable) area (m?)
(if applicable)
Seam Biel =r
C1 No
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a fot.
toa hae) eM atom Co)e= | MeO nl e\- Takei
ting lots making up the premises?
1S a]
rat is the nature of the lot reconfiguratio
CJ Subdivision (complete 10) (1 Dividing land into parts by agreement (complete 11))
(1 Boundary realignment (complete 12)) (1 Creating or changing an easement giving access to a lot
from a constructed road (complete 13))
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
Sema mln mie] eLel Team st-Mci tle] =%e Rs
CJ Yes — provide additional details below
CNo
How many stages will the works include?
What stage(s) will this development application
apply to?
Page 4
DA Form 1 — Development application details
Version 1.4— 15 December 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.