Minor Change Existing Approval - MCU17 0024 03 (As Publihed) · MCU17/0024.03
18. A Construction Management Plan for the development must be submitted to and approved
by Council at least 5 working days prior to the commencement of any Building works or at
least 5 working days prior to the pre-start meeting for Operational Works. The Construction
Management Plan shall include but not be limited to:
a. site working hours;
b. communication and consultation processes with surrounding premises;
c. control and suppression of –
(i) noise
(ii) vibration;
(iii) dust;
(iv) odours and exhausts control; and
(v) site working hours
d. employee and contractor induction and education processes.
19. A Traffic Management Plan for each separate construction phase of the development must
be submitted to and approved by Council at least 5 working days prior to the commencement
of any works or at least 5 working days prior to the pre-start meeting for Operational
Works. The Traffic Management Plan must include but not be limited to:
a. limiting the routes for the heavy vehicles to the major road network and define the route
to the site;
b. indicate provision for on-site and off-site parking and shuttle buses (if required) for the
required workforce;
c. indicate the location of loading and unloading areas;
d. indicate the location of any “holding” areas for heavy vehicles;
e. operating hours.
20. Construction staff must not park within the Council carparks in Belmore Terrace, Duke Street,
Webb Road or any other surrounding street. Parking must either be on site or at a suitable
off-site location serviced via a shuttle bus. Details must be included in the Traffic
Management Plans for the site.
Bicycle/Scooter Provision
21. Four bicycle racks (capable of accommodating 8 bikes) and 4 scooter spaces must be
provided on site at the rear of the building. The works must be undertaken in accordance
with an Operational Works approval and clearly shown on the plans for carparking.
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. Connection of any new works on site and in the carparking area to the existing
stormwater drainage system;
b. The works in Webb Road must be generally in accordance with drawing number
16636-SK01 Revision A prepared by TOD Noosa and include sufficient detail:
i. To quantify the catchment and calculate runoff to the proposed inlet and define
overland flow component bypassing the inlet in a 1% AEP event
ii. To demonstrate improved inlet capture
iii. To demonstrate how the adjacent 1in 4 fill batter is to be stabilised to avoid scour
when flows bypass the proposed inlet
iv. To demonstrate that cars parked in the adjacent carparking spaces will not be
flooded in a 1% AEP event
Page 6 of 10
Document Set ID: 24552745
Version: 6, Version Date: 25/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - MCU17 0024 03 (As Publihed).pdfRelated documentApplication case desk ↗
About this file
- File size
- 171 KB (small file)
- File type
No other editions are linked here.