LANDSCAPE NOTES CONTINUED
20. Podium Soils
Lightweight podium soil mix shall be supplied and installed by the Contractor to planters and podium areas to
locations shown on plans.
The soil mix shall be:
   i. Free from perennial weeds and their roots, bulbs or rhizomes.
   ii. Free from building rubble, including bricks, concrete, plaster, timber, oil or any other matter deleterious to plant
        growth.
   iii. Free from rocks or stones greater than 8mm diameter, but in any case, to have less than 15% stone by dry weight.
   iv. To have all components batch blended evenly throughout and have a pH range of 6.0 - 7.0 (i.e., slightly acid to
        neutral).
   v. To have a light to medium friable loam texture.
   vi. Free from Silt Material.
   vii.Conducive to the establishment and maintenance of healthy, thriving plants.
   vij.Initial fertiliser application - 150gm/m2 of Osmocote Low P - 12-14 months and annual fertiliser application of
        75gm/m2 of the same product.

The podium soil mix to above ground planters shall be Hydrocell 40 Extensive Lightweight Soil / Podium Mix,
compaction of media at 100mm increments with equivalent force to an average persons footprint. Comprising 30%
Washed Sand, 40% Hydrocell, 20% 14mm scoria and 10% Composted Organics by volume. Supplier Fytogreen
Australia Tel - 1300 182 341.

The planter mix to planters shall be Hydrocell 40 Extensive Lightweight Soil / Podium Mix comprising 30% Washed
Sand, 40% Hydrocell, 20% 14mm scoria and 10% Composted Organics by volume. Supplier Fytogreen Australia Tel -
1300 182 341

The Contractor may offer an alternative soil mix based on previous experience. Full details of such mix including
situations of use elsewhere shall be submitted to the Superintendent for consideration. The Superintendent shall
provide written approval or otherwise to the Contractor prior to the Contractor ordering soil mix.




PLANTING SCHEDULES
                                                                                                                              B




                                                                                                                          B



                                                                                                                                                         B




                                                                                                                          B




                                                                                                                    B




                                                                                                                                                         Revision      Date        Amendment    Drawn   Checked
                                                                                                                                  APPROVAL ONLY
    PLANTING SCHEDULES                                                                                                            NOT FOR CONSTRUCTION
                                                                                                                                                             A
                                                                                                                                                             B
                                                                                                                                                                    22.04.2026
                                                                                                                                                                    27.05.2026
                                                                                                                                                                                 For Approval
                                                                                                                                                                                 For Approval
                                                                                                                                                                                                  LS
                                                                                                                                                                                                  LS
                                                                                                                                                                                                          CS
                                                                                                                                                                                                          CS

    CD-002                scale: N/A

    17 BOTTLEBRUSH AVENUE, NOOSA JUNCTION
    JOB NUMBER: 26105                       CLIENT NAME: MAJP CONSULTING

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Landscaping Plan.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.