Council archive · source document
RFI - Landscaping Plan · MCU26/0001
Plans and drawings: the text below has words only, no drawings.
Notes: Notes: Notes: Turf as specified FSL
- Thoroughly water the root ball - Place the rootball on a firmed base to achieve required FSL. - Place the rootball on a firm base. Mulch
immediately after planting. - Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting. - to 100mm depth
Tree guard only required - Number of stakes will vary with pot size. Refer plant schedule. - Cultivate sides of excavated hole 50mm deep. Topsoil
when specified in Materials - Cultivate sides of excavated hole 50mm. - Do not disturb kerb, road pavement or road side drainage works. - to 100mm depth
& Finishes Schedule - Tease out roots on side of rootball when planting. Soil blend or site topsoil
Marker stake: - Ensure top of rootball is not buried; expose and set flush with finished level. Cultivate subgrade - to 300mm depth
Hardwood Stake Size:
12 x 12 x 75mm 140mm = 25 x 25 x 90mm - to 150mm depth
Form an earthen basin Hardwood Stake Size:
200mm = 25 x 25 x 90mm 45ltr = 2 x (38 x 38 x 1800mm)
around the base of the plant. 25ltr = 38 x 38 x 1800mm Existing subgrade Cultivated subgrade
75ltr = 2 x (50 x 50 x 1800mm) - to 150mm depth
Mulch: Pull away from 250 100ltr = 2 x (50 x 50 x 1800mm)
base of plant. Hardwood Stake: 25 x 25 x 200ltr = 2 x (50 x 50 x 2400mm) Notes:
90mm. Place 600mm into
25
Hardwood stake: Place 600mm -Refer Materials & Finishes
the ground. Do not place
through rootball. Secure with into the ground. Do not place 04 TURF PROFILE Schedule for fertiliser
Fertiliser: Do not allow through rootball. Secure with CD-300 1:5@A1, 1:10@A3 application requirements
ties by looping in a figure
contact with roots. ties by looping in a figure eight
eight pattern.
Topsoil blend Mulch - pull away
pattern.
B 06 GARDEN BED PROFILE
Raise plant 50mm above CD-300 1:10@A1, 1:20@A3
from base of plant.
finished surface level.
Water retention additive
Form an earthen basin Mulch: Pull away from
around base of plant. base of plant. Notes:
Form an earthen basin Angle and space pavers as indicated on working drawing.
If not specified space equally as shown on drawings.
01 TUBESTOCK PLANTING Topsoil blend
around base of plant.
Notes:
CD-300 1:10@A1, 1:20@A3 75 x 75 x 50mm concrete haunch to all
Fertiliser: Do not allow corners. Ensure top of haunch is min. - Concrete - N32 to footpath.
contact with roots. 20mm below surface level. - All mesh reinforcing to be HDG
- Compact sand base under path to a density index of (d.i.) of 75% min.
Water retention additive Topsoil blend Plant tile level. Refer to
- Saw Cut control joints
min 300
plan for type.
Water retention additive - Refer to Landscape Plans and Schedule for pavement colour & finishes
typ. 80
30
Fertiliser: Do not allow 1
HDG SL72 fabric.
fertiliser to come in 1 Min.55mm to top and side cover
02 140-300mm PLANTING
100
contact with roots.
50
min. 2% fall Vapour Barrier to be 200vm
55
CD-300 1:10@A1, 1:20@A3 Visqueen DPM or similar approved
width (w)
10 - 20mm Drainage gravel
125
2xw Coarse bedding sand under length of pavers. 55 55
Notes:
- Place the rootball on a firm base. 100mm deep sub base: CBR 45
- Thoroughly water the root ball immediately after planting. compacted to 95% standard compaction.
- Cultivate sides of excavated hole 50mm deep.
- Do not disturb kerb, road pavement or road side drainage works.
- Tease out roots on side of rootball when planting.
03 45-200ltr PLANTING 05 PAVEMENT TYPE 1 Sand Bed - 50mm thick
CD-300 1:10@A1, 1:20@A3 CD-300 1:5@A1, 1:10@A3
- Ensure top of rootball is not buried; expose and set flush with finished level. 800 x 230mm Concrete Pavers Compacted Subgrade:
150mm to 95% Standard
Hardwood Stake Size:
SECTION
45ltr = 2 x (38 x 38 x 1800mm)
75ltr = 2 x (50 x 50 x 1800mm) Set soil level at top
100ltr = 2 x (50 x 50 x 1800mm) of rootball (at flare
200ltr = 2 x (50 x 50 x 2400mm) of trunk)
2.8mm Reinforcing: Cut every 2nd
mesh rod under sawn joint.
20
50 x 50 x 2400mm HW Timber Pull away mulch
stake - Place 600mm into the from base of plant
ground. Do not place through
rootball. Secure with hessian ties by Form mulch berm
looping in a figure eight pattern. to the perimeter of CONTROL JOINT (located every 3m)
the rootball
Notes: F.S.L.
(X)
Raise plant 20-30mm above - All timber to be CCA pressure treated to
top of kerb. Distance to local Flexible Joint and Parchem Dowel Form Sleeve or
AS1604, Hazard 5, rough sawn pine.
authority requirments Timber edge Filler Board similar approved with 16Ø insert
- All timber edges to be arissed to comply
Do not excavate with council standards. to allow for lateral movement.
within 50mm of - All timber ends to have one coat of Stakes HDG SL72 Mesh
edge restraint or 100
Cuprinol or equal prior to installation. 55mm top cover.
pavement. - Stakes to be 400mm into ground at max. 90mm∅ capped slotted pipe
Top of Kerb Existing/compacted
1200mm centres, or as required to obtain 75mm below top of planter
FSL /subgrade/subase
smooth curves. Top of stake to finish connected to drainage system
River stone to per Hydraulic Engineer
20mm below top of timber edge. Where
70
50 top of pipe
Mulch
300
timber edges meet at corners provide
2 double stakes. - refer to plans for organic or 350 300 350
Topsoil blend 1 1 - All fixings to be hot dipped galv. inorganic locations
- Leading edge is to be free of burrs and EXPANSION JOINT (located every 12m)
1 Podium soil
splinters. - refer to Specification
Bio-degradable
varies
Water retention additive geo-fabric UrbanScape 20mm Green Roll, where
soil depth is less than 200mm. Nom.10mm thick Flexible
Geotextile fabric Joint and Filler Board
100mm drainage gravel in TIMBER EDGE STAKES (X) = Height above 30mm Atlantis drainage cell HDG SL72 Mesh
heavy or poor draining soils. 38 50 finished surface level FIXINGS 55mm top cover.
Connect drainage or similar approved
50mm Bugle Headed
gravel to back of kerb, FLUSH
Batten Screws. Topping slab - If required.
Incorporate slow release organic subsoil drainage where
100
applicable 20mm 75mm Bugle Headed Depth varies to achieve falls
fertilizer and water retention
70
Batten Screws. to drain.
additives to backfill per 100mm
Manufacturer's recommendations 100mm Bugle Headed 350
150mm Waterproofing and protection
Batten screws.
100x38mm - to Architect's Specification.
Adjacent wall & footing
Podium / basement slab
50x50mm ISOLATION JOINT
- refer Engineer's detail.
07 STREET TREE PLANTING 08 EDGE TYPE 1 09 PODIUM PLANTER 10 PAVEMENT TYPE 02
CD-300 1:10@A1, 1:20@A3 CD-300 1:5@A1, 1:10@A3 CD-300 1:10@A1, 1:20@A3 CD-300 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site Timber garden edge Pedestrian Concrete Path to SCC Standard
Revision Date Amendment Drawn Checked
B APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
22.04.2026
27.05.2026
For Approval
For Approval
LS
LS
CS
CS
CD-300 scale as noted
17 BOTTLEBRUSH AVENUE, NOOSA JUNCTION
JOB NUMBER: 26105 CLIENT NAME: MAJP CONSULTING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Landscaping Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.