4. A rigid handrail shall be fitted on one side of the walkway.
5. No posts or vertical supports of the proposed jetty are to extend vertically from the
structure unless they provide support for the handrail.
6. No boatlifting devices are to be attached or moored at the jetty structure for the purpose
of elevating a vessel above the water without Council approval.
7. The jetty shall be constructed in a manner to render the underside area vermin proof.
8. There shall be no electrical reticulation system carrying electricity in excess of 24
volts beyond the revetment wall.
9. Lighting associated with the use shall be designed, installed, operated, and
maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects
of Outdoor Lighting.
10. The jetty is to be used for private purposes only with no commercial operations are to
be undertaken.
11. Boat repair activities will not be permitted on site.
12. Wastewater and sullage shall only be disposed of at approved pumpout facilities.
13. The mooring facility shall not be utilised for live-aboard purposes.
14. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection
Act (EPA) 1994 and the Environmental Protection (Water) Policy 1997.
15. The approval or conditions do not constitute a ruling on structural safety and the
applicant must make their own arrangements to ensure adequacy of design and work.
Also any approval granted does not warrant that such plans and specifications have
been checked in detail, nor does it absolve the owner of the land from complying with
all the conditions of this approval and/or relevant Council By-Laws and Policies and/or
relevant statutes and/or statutory regulations in the execution and/or performance of
said works. The Council does not accept any responsibility for the accuracy of such
plans and specifications as approved.
16. Certification by a Registered Professional Engineer of Queensland shall be submitted
to Council prior to the return of any bond monies held by Council. The certification
shall state that the jetty has been constructed in accordance with best practice
methods, is in accordance with Coastal Protection and Management Act 1995, is
structurally sound and will have no detrimental affect on the existing revetment walls.
17. A final inspection and approval of the structure by Council’s Inspector is also required
prior to the return of any bond monies held by Council. Please contact Council’s
Operational Works Assessment Branch to arrange the inspection.
18. The jetty shall be licensed with the Council upon completion of the structural work and
shall be licensed annually thereafter.
19. The Development Permit for Operational Works lapses if the works have not been
completed by 21 July 2011, unless an application to extend the currency is approved
by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Page 2 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - 010.2009.00000871.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 448 KB (small file)
- File type
No other editions are linked here.