e Containers ‘Order specified type, number and colours of containers from suppliers in advance to ensure availability. Ensure drainage holes are provided to base of all containers, above water reservoir where applicable. Provide growing medium to containers as follows: Type A, B & C — 100mm tayer of Hydrocell Flake in base with High Podium Potting Mix (40% Hydrocell; 50% washed sand; 10% organic) to remainder. Type D - 300-400mm layer rock (reuse existing podium rock) in base covered with layer of Geofabric, then 100mm Hydrocell Flake and High Podium Potting Mix to remainder. Type E — 100mm layer of Hydroceil Flake in base with Organic Potting Mix (70% composted fine bark based product with soil conditioner, 30% Hydrocell) to remainder. Incorporate slow retease fertiliser suitable for containers as instructed on packaging. Soil level to finish 100mm betow top of container. Provide 75mm minimum depth of 25-30mm Cypress or Hardwood chip mulch as selected. Ensure containers are kept moist at all times until end of the Defects Liability Period. Fairshore Apartments Maintenance Contractors to continue watering regime and reapply fertiliser twice yearly in late Winter and early Summer to ensure continued plant health. Hard Landscaping Specifications Rock Walt Refer to Detail ... Wall to be constructed from hand selected150-400mm grade Envirostone rock. Footing to be 250mmD x 500mmW, with 1 layer 4 bar F11 trench mesh. Build wall in random rubble property bonded with smooth faces exposed and outer face vertical. Bed & point in mortar keeping minimal variation in joint thickness. Top of wall to finish a minimum width of 300mm and to’‘heights above level of path as shown on detail. Clean off mortar droppings as they occur. On completion clean down all rockwork and adjoining surfaces where necessary. . Remove all debris, surplus materials, etc from the site and leave in a clean and tidy state. Outdoor Shower Refer to Detail ... Decking to be 86 x 25 Queensland Beech, durability class 1 or 2, with 5mm gaps fixed to joists with stainless steel screws. Frames to be constructed from 75 x50 Ironbark joists at 500mm maximum centres. Fixed walkway sections to be supported on stainless steel fish plates, 50 x 6 x 600mm long, set into mass concrete footings at 1m maximum centres along both sides. Joists to clear finished levels 100mm. Shower decking to be constructed in 3 sections over concrete base as per detail to allow clearing of sand trap by lifting removable middle section. 90 mm PVC stormwater pipe to connect into existing shower drain line. Bush Rocks Bush rocks to range from 400 to 600mm diameter and have a weathered appearance. Boulders shall be positioned as per drawings and shall be placed to assume a natural relationship with each other and the surrounding garden area by burying about a third below ground. Use boulders to advantage to stabilise slopes and separate different mulch types. Garden Edging . Garden edging between garden beds and turfed areas to be continuous extruded natural concrete, 100mmW x 100mm, with tooled joints at 1500mm maximum centres. Between boundary and boardwalk extemal to property use CCA treated hardwood sleepers on edge between garden beds and turfed areas to match existing.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1227 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.