Council archive · source document
09/1227 - Operational Works - Landscaping [As Published] · 142009.1227
AO) | tS
NB. Demolish exishng fod
wall » taking raximun Fog .
Care, to avoid damage
fo roots or branches” #45
of oxi Sheg Pardarws . Garden :
Construct new rote wall to B 5 yj Toded
Grew naghs. Use eve EL Paty ‘Aron!
qrades achleve, ne 6: ,
changes ww height. Fandanus™ .
PandanS é j 4.60 \
¢.B : le DG Le
+A
Falm ; Is an Z,
4.60 a
Pardarvs
Le) [00- BOO mw rade, Envirosbne.
lacd reandarm l with, mortar
Backfile be fore Joints. Flat Faces to exposed
plarhag: x sides e too with flush
NA finish. Clean mortar fron
exposed faces AS Nock
: Drainage grovel do “Ss fpreceeds.
base of wal{ wheren Ra
drainage conduit ofS)
runs Thre to
front face.
ZSO bx BSOOW Concrete
Feotng, 1 layer 4 bar
: F!) chy eshy
Rock WALL SECTION 11/0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1227 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.