Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

20517 App Q.pdf [As Published] · 132007.1259

of 91

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

DRIVEWAYS AND CARPARKING CODE
Performance Criteria and Acceptable Solutions

4mm

Roomex company

 

 

 

 

 

PROBABLE SOLUTIONS .
SPECIFIC OUTCOMES aoe esc es) SOLUTIONS’ COUNCIL USE ONLY
03 $3.4
In commercial zoned areas, the number of Design of multi-tenanted developments in NIA The development site is not located within commercial zoned area.
driveways across pedestrian footpaths is commercial zoned areas include shared driveways
minimised. and parking areas; and
$3.2
Driveways are located so they abut existing NIA There are no existing driveways abutting the subject site.
driveways of adjoining development where
practicable and reciprocal easements are created
to reduce the sealed driveway width.
04 $4.1
Vehicular access does not adversely impact on the | Footpath and kerb crossings are located clear of v Footpath and kerb crossings are located clear of existing
capacity, operations and maintenance of the existing stormwater inlet structures, water and
existing infrastructure; and sewerage infrastructure fittings, any other exiting
utility infrastructure, existing landscaping and
vegetation.
05 S51
Vehicular access does not adversely impact on the | No solution provided v Vehicular access does not impact on existing landscaping or native
integrity of existing landscaping or native
vegetation.
06 $6.7
Driveway run-off is filtered prior to leaving the For— v All driveway runoff will be treated prior to leaving the site, as

premises.

 

(a) Ancillary dwelling unit, Multiple housing
Types 1 or 2 if less than 5 carparking spaces,
Visitor accommodation Type 1 and Home
based business—the driveway is formed to
drain to fandscaped areas; and

(b} for other uses—grease and oil arrestors or
stormwater quality improvement devices are
incorporated into the design to treat run-off
prior to run-off exiting from the premises.

 

detailed in the Stormwater Management Plan, as prepared by
Brown Consulting.

 

 

 

 

1 Solution: + ¥ = Acceptable Solution
AIS = Alternative Solution

N/A = Not applicable to this proposal

20517 -Essence of Peregian

Commenced 3” February 2006 - Updated October 2006

Appendix Q
20517_drivewayscarparkingcode_FINAL_fw.doc.

Page 2

Used in these records

About this file

File size
6.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App Q.pdf [As Published].pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.