20517 App Q.pdf [As Published] · 132007.1259
BUILDING REMOVAL, RELOCATION OR DEMOLITION CODE
Performance Criteria and Acceptable Solutions
SPECIFIC OUTCOMES
PROBABLE SOLUTIONS
{IF CODE ASSESSABLE)
SOLUTIONS’
COMMENTS
COUNCIL USE ONLY
of
Opportunities for re-use of buildings are maximised.
S11
Buildings are relocated to another site and adapted
to meet the needs of users.
The existing buildings on the site are of made of slab on ground
with brick materials and therefore are unable to relocated or
reused.
02 S21
Demolition, removal, relocation or associated works | Infrastructure including, reticulated water, v The existing services located within the site will be protected and
does not result in— sewerage, stormwater, and electricity are protected relocated safely to suit the proposed development. This will be
(a) ‘live’ or ‘active’ infrastructure that may from damage and made safe to the standard further detailed in the operational and building works phase of the
present a risk to people using the site or | required by the regulatory authority; and development approvals process.
surrounding areas; or
(b) damage to infrastructure or other works. | $2.2
Infrastructure is disconnected, capped or sealed v Any infrastructure to be disconnected, capped or sealed will be
Advisory note: including— undertaken by appropriate technicians using correct and approved
An approval will be required from Council's electricity meters are removed and electrical wires methods. This will be further detailed in the operational and building
Plumbing Section for decommissioning plumbing disconnected; and works phase of the development approvals process.
apparatus including- telephone lines are disconnected; and
(c) sanitary drains or reticulated water supply; high speed data cables and television provider
and boxes are disconnected and removed; and
(d) septic tanks, holding tanks or on-site :
treatment systems. $2.3
A temporary crossing is provided to protect road v Appropriate temporary crossings will be provided to ensure road
reserve infrastructure including kerb and channel; feserve infrastructure is protected. This will be further detailed in
and the operational and building works phase of approvals.
$2.4
Any damage to footpaths, street plantings, kerb and v All footpaths, street plantings, kerb and channel or road ways will
channel or roadways at the removal site, the be repaired or replaced to at least pre-existing conditions.
telocation site or between the sites is repaired or .
reinstated to at least pre-existing conditions.
4 Solution: ¥ = Acceptable Solution Appendix Q
AIS = Alternative Solution
N/A = Not applicable to this proposal
20517 - Essence of Peregian
20517_building Removal demolition code_FiNAL_mrc.doc
Commenced 3" February 2006 - Updated October 2006
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App Q.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.