Council archive · source document
20517 App Q.pdf [As Published] · 132007.1259
WASTE MANAGEMENT CODE Performance Criteria and Acceptable Solutions faint O AO om Oat Mi ait PROBABLE SOLUTIONS (IF CODE ASSESSABLE) Sle] RUL ae) COMMENTS 4 ypmm \ COUNCIL USE ONLY Waste separation 01 $1.1 v During construction all waste generated will be disposed of in Development that generates several classes of | Construction, operational and demolition works are accordance with PSP 11 and adequate area will be provided for waste is designed so waste is collected, stored and | planned and managed in accordance PSP1130; storage and collection of all classes of waste material, as required. disposed of in a safe and ecologically sustainable | and manner29. | $1.2 Adequate area is provided for on-site for the v During operation all waste generated will be disposed of in collection and separate storage of recyclable, non- accordance with PSP 11 and adequate area will be provided for recyclable, vegetative and hazardous materials in storage and collection of all classes of waste material, as required, their specific waste streams during construction, as per Drawing A-05 by JMA architects. operational and demolition works; and 02 $2.1 Waste storage areas provide for adequate | Waste storage areas allow for the separate storage v Sufficient area and signage will be provided for the separation and separation of all recyclable and non-recyclable | of different waste materials for reuse or recycling storage of different waste materials for reuse or recycling. materials. by— . (a) _ providing sufficient area to store all recyclable material and recycling containers required, and (b) sign posting the types of waste stored. Design and location of waste storage areas 03 $3.4 v The storage area has been designed such that accessibility by a Waste storage areas are located so that they are | Waste storage areas are designed and maintained 12.5m rigid vehicle is possible, with a maximum of three (3) convenient and safe to use and provide for | in accordance with PSP 9; and movements. convenient and safe collection by service vehicles; and $3.2 Waste storage areas are designed and located so v The storage area enables traffic flow to be maintained whilst they— garbage is being collected. The loading area is clear of key site (c) are easily accessed and convenient to use; (d) have unobstructed access for the collection of the waste by service vehicles; (e} provide for sufficient space for safe entry and exit and servicing by Council's contractor pedestrian linkages, loading bays and car parking bays. 4 Solution: | ~ = Acceptable Solution AIS = Alternative Solution N/A = Not applicable to this proposal 20517 _ Essence of Peregian Appendix Q 20517_wastemanagementcode_FINAL_mrc.doc Commenced 3° February 2006 - Updated October 2006 Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App Q.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.