DRAWING SIZE - At
MANAGEMENT PLAN
~ Ensure the inflow into the pit is protected with
‘Qn approved leaf ond sit guord.
~ The pit MUST be wrapped in geofobric cloth as
specified,
= The pit should be bockflushed on a regular basis
(3 months) to remove ony sits or similiar
materiols. . Surface
ston a Should only be used for the disposal of Bund Capped Concrete encased
water.
ormeecte 908 backflush point
Flow
As per plan
Slotted Agg pipe
150 min clearance
{o base. 20mm clean aggregate
fully encased in
geofabric.
LEGEND
4{No.) 685x450x408 Atlantis Matrix Drainage
Cells wrapped in geofabric, refer to detail.
CW Garden Wall Footing, refer 16115~St for details
— — SLT — ~— indicates position of approved silt retension
fence.
—X _
FALL Indicates direction of fol! to surface levels.
Refer 16115-OW2 for details
EPP<DX) (ut) Indicates 3000(Lt) under ground holding tanks.
Indicates proposed finished spot surface levels to ohd.
(FOX GBPCT) Indicates FOX GBPCT grease trap.
(i) indicates 3000Lt Water Tank for re-use, refer
schematic,
FILLING NOTES:
~The site is to be scroped clear of alt organic material ond debris.
~ Any fill is to be clean granular moterial (i.e. sond to a clayey sand
in accordance with AS1726) be free of any organic material and have
a clay content of less than 12% (Plasticity Index Jess than 25%, Linear
shrinkage of 15%). The proposed material 's to be inspected by SCG
Consulting Engineers prior to its removal to ensure its compatability.
— The fill is to be placed and compacted in accordance with
AS3798-1996 to a level sufficient to achieve a Level 1 certification
with a minimum relative field density of 95% Copies of compaction
test results shall be presented to SCG Consutling Engineers for
approval.
~ Filling and compacting adjacent exisiting structures is to be in
strict accordance with the associated details and specitcations.
~ Areas where existing structures or trees ore removed shall be
backfilled with the approved fill material compacted in accordance with
AS2870-1996 to achieve ¢ minimum relative field density of 95%
~ Any loose or soft material uncovered in the site preparation shall
be removed and replaced with the opproved fill material compacted in
accordance with AS2870-1996 to achieve a minimum relative field
density of 95%
~ Site droinage and silt protection measures must be installed prior
to construction commencing.
Slotted horizontal
‘agg laterals
pipes equally spoced.
As per plan
TYPICAL SECTION ~ A - A
DETALS
DRIVEWAY CROSS OVER DETAILS
TO BE IN ACCORDANCE WTH
NOOSA SHIRE COUNCIL'S STD
DRAWINGS 9005 & 9019,
APPROVED N.S.C
KERB ADAPTOR
EXISTING KERB AND CHANNELL
TO BE CUT AND REMOVED
AND NEW DRIVE WAY TO BE
INSTALLED TO N.S.C STANDARDS.
20-40mm_ AGGREGATE
HARD STAND OVERLAY
FOR DRIVE WAYS DURING
CONSTRUCTION.
EXISTING DRIVE WAY TO BE
SMASHED AND REMOVED AND
KERB AND CHANNEL TO BE
REINSTATED T6 N.S.C APPROVAL.
EXISTING FOOTPATH TO BE
CUT AND REMOVED. NEW CONC.
FOOT PATH 70 BE REINSTATED
TO SUIT NEW DRIVE WAY. ALL
GRADES 70 NS.C APPROVAL.
APPROVED NSC
KERB ADAPTOR
50
m
”
viva
20—40mm AGGREGATE
HARD STAND DVERLAY
FOR DRIVE WAYS DURING
CONSTRUCTION.
EXISTING KERB AND CHANNELL
TO BE CUT AND REMOVED
AND NEW DRIVE WAY TO BE
INSTALLED 10 N.S.C STANDARDS.
PROIR TO CONSTRUCTION ENGINEERS
IS TO REVIEW CONTOUR SERVERY
(TO BE PROVIDED) ON BOTH ALOMENTS
IN TO CONFIRM THE DETAILS
CONTAINED HERE IN.
2.5n2.5x1.0m(D)
STORMWATER SOAKAGE PIT
TO DETAIL. UNDER
DRIVEWAY
1500 uPVC > =
{CHARGED LINE) | |
;
Kerb
2.5x2.5x1.0m(D)
STORMWATER SOAKAGE
PITs TO DETAIL
Sow cut ond
breakout
bock of kerb
STORMWATER ASSESMENT
AR. = 100yrs tc = Smins
Q (Pre development} = 93!/s
Q (Post development) = 100L/s
Storage Required = 1.95m3
Solution:
Provide Atlantis Matrix Drainage Cells on
each unit outflow to match the total
volume required. Cells will also allow
infiltration to surrounding soils to
re~charge the water table
BUILDER TO MAINTAIN STABIUTY
Ye ——
Refer Charge rt
Outlet Detail for
branching to tank .
eL—
Existing timber
retaining wall
retained.
FFL 99.58 Refer Charged SW 1 £
Outlet Detail for 8
UNIT 2 branching to tank | af
eS
8s
2
es
a 2
25
Refer Charged SW
Outlet Detail for
branching to tank
Hy , Existing timber
FOR POOL ] retaining wall
ao . ant | OETALS retained
Refer Charged SW
Outlet Detail for
branching to tank |
FOR GUIDANCE. ALLOW FOR SHEET
PILING OR SIMILAR.
THE CONTRACTOR IS TO INSTALL APPROVED SET RETENTION FENCES
PRIOR TO COMMENCING ANY EARTHWORKS. THE FENCE IS 10 BE
CONSTRUCTED ALONG THE LOWEST BOUNDARY AND RETURNED UP SDE
BOUNDARIES TO ENSURE FULL STORMWATER ENTRAPMENT, SURFACE
RUNOFF FROM MTHIN THE ALLOTMENT MUST DRAIN TOWARDS THE
FENCE AND SHALL NOT ENTER NIEGHBOURING ALLOTMENTS THROUGH
THE USE OF SURFACE BUNDING OR SCOUR PROTECTED DRAINS. THE
FENCE MUST REMAIN JN PLACE UNTA SUCH TIME THAT FINISHED
LANDSCAPING AND DRAINAGE MEASURES ARE INSTALLED
900(W) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES AND
BURIED 300 INTO STABLE
GROUND.
1200(L) 50 Sq. HDWD SPIKES,
1800 ctrs DRIVE 600 INTO
GROUND.
ENSURE BRANCH TO TANK Me ents
FLOW 'S ABOVE THE 2 7 tee. L
KERB LEVEL (DISCHARGE
POINT) IN OREALLA Cr.
WATER TANK TO BE SEALED TO Z p— — — OUTER Levee —_
RESIST HYDRAUUC PRESSURE — s
FROM ROOF DRAINAGE WHEN PROPOSED ONE WAY
TANK FULL | l DWELLING 5 FLAP. VALVE
INSPECTION OPENING TO / KERB
f as
SURFACE LEVEL FOR BACK
FLUSHING OF CHARGE.
APPROVED KERB
ADAPTER
RAINAGE a 90 DIAM OVERFLOW FROM
ATLANTIS 9 WATER TANK TO ATLANTIS
SITE PLAN SOAKAGE PITS
n
(Scaie 1:200) -
Ground /
This footing I
without piers |
is founded | The builder contractor
060707_contex1_132555_001 tif | above critical | shell confirm all relevant
This footing is depth fine and! Jevels prior to
founded below is unstoble. | commencing works.
critical line and is .
stable. [tine of
t proposed
sit eiers supporting str I Excavation or
z{5 SLE2 Mesh Atlantis MATRIX. droinage ler Supporting strip | similiar.
sé 1000 middle cells as specified, rapped footings or post pad !
in geofabric footings founded into |
selected material and below Horizontal 30 Deqtees
STORMWATER STORMWATER critical line are considered _~
OUTFLOW INFLOW stable.
Compacted
BARRIER, SEM-POUNTABLE, MOUNTABLE sand bed
KERB & CHANNEL OR INVERT CROSSING.
CROSSOVER DETAIL ATLANTIS
(Seate 1:20)
NOTE:
| | CRITICAL DEPTH LIN THIS DETAIL ALSO APPLIES 10
WZ EXISTING FOUNDATIONS ON
NEIGHBOURING PROPERTIES, SHEET
PILING MUST BE INSTALLED WHERE
EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION
CRITICAL DEPTH LINE
Provide slotted pipe
through MATRIX cells
NA\ AKER PIT
Me be tae bee
NOTES:
1. Existing footpaths to be saw cut prior to removal
2. Crossings ore not designed for commercial vehicles :
3. Concrete driveway to be 125mm thk. excluding any -—=-
finished treatments, eg. stamping 4
4. Concrete surface tolerance +5.0mm over 3.0m {
5. Concrete N25 in accordance with AS 1379 and AS 1.
3600
6. Reinforcement fabric to AS 1304, placed central slob
depth.
7. Expansion joints to be 10mm wide wet tooled with
every 2nd mesh wire cut aiong joint.
8. One access point permitted for each allotment.
9. For curved driveways, maximum grades apply to inside
edge of curve
10. All services to be located and protected as required
prior to work commencing
MAINTENANCE PROGRAMME FOR FOX TRAP
HOUSEKEEPING
* Large items of floating debris (such as plastic bags, drink cans
etc.) are observed on the inlet grate of the unit they should be
collected and disposed of in a suitable manner. The Fox BPT600
does not capture these items they simply prevent them from
entering the stormwater discharge through the unit.
* Regularly inspect the unit for a build up of captured pollutants
within the silt basket. This should be done on o weekly basis or
more often if lerge quantities of silts are being retrieved.
* To empty the silt bosket the slide bolt on the grate should be
slid beck using a screwdriver or similar and the grate lifted ond
moved forward to enable access to be gained to the bosket.
Please note that the grate is heavy and proper care should be
token when removing it.
* Remove the silt basket and dispose of captured pollutants in a
suitable manner such as emptying it in a garbage bin or similar.
* As soon as the basket has been emptied it must be replaced
and the grote returned to its’ locked position,
For sqfety reasons the unit should never be left unattended when
the grate ond basket are removed. For maximum environmental
protegtion and to reduce maintenance costs the silt basket should
always be in place within the unit.
Regular servicing of the Chomber.
* Fox Environmental Systems recommend that initially the units are
cleanad on o 3 monthly bosis. This service should consist of a
minimum of the following activities.
* Carefully capture any floating hydrocarbons in the chamber.
Captured hydrocorbons must be disposed of in a manner prescribed
“in the Environmental Protection Act.
“ * Pump water from within the chamber and filter through a
minimum 20 micron filter before allowing discharging into the
stormwater system.
* Remove alf silt and sediment build up from within the chamber
and dispose of it in a suitable manner such as emptying it in a
garbage bin or similar.
* Following each service quantities of pollutonts that are removed
should be recorded to enable proper assessment of the serving
frequencies required to be ascertained,
Fox Environmental Systems Pty Ltd offers a full service for the
maintenance of the BPT6Q0 units in SE Queensland, Contact our
Service Manager on (07) 5492 5722 for information and costing
Prepared November 2003
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated drawings are
Copyright ond ore not to be used of reproduced without the written permission of
SCG Consulting Engineers.
Revised FFL’s and storm water to suite
Spot Levels & Finished floor jevels addded
Storm woter retension added,
Storm Woter & Holding Tanks
DESCRIPTION faree,_ |
AMENDMENTS
| memes
s=¥*” FOR CONSTRUCTION.
DEBUILD TA
CONSULTING ENGINEERS
SC structural - civil - geotechnical S
ABN 40 098 481 899
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
Title:
OPERATIONAL WORKS PLAN.
Project
OT 161 Orealla Cres,
Sunshine Beach.
Moy 06 1:100
ow Ne. 16115-OW-1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
DRAWING SIZE - A2
99,589
100.147
{100.449
100.837
EXIST S.L.
DESIGN S.L.
0.0 | 99.589
2700 [99.824
4202 | 99.764
\
in 25 Max
Refer Driveway
Crossover Detail
below
RP BOUNDARY
1 in 8 Max,
RL 97.50
VY
13.165
Grated Drain Slab Level
17.689 | 10016
House
FFL 99.58 ASSUMED
Min. Garage/Carport
DISTANCE
DRIVEWAY CENTRE LINE PROFILE ~ LOT 1
(1:100)
99.85
100.321
100.568
100.986
102.01
GFF
|
0,0 | 99.85
2700 100.083
4202 |100.023
Refer Driveway
Crossover Detail
below
RP BOUNDARY
Tin 8 Max,
RL 97.50
v
10.270 | 99.41
Housq | Assumed
DISTANCE! DESIGN S.L. | Exist S.L.
FFL 99.20 ASSUMED
Min. Garage/Carport
Slab Level
DRIVEWAY CENTRE LINE PROFILE ~ LOT 2
(1:100)
Revision Description Date
A. Garage Floor Levels revised. 25.06.07.
+
Matt 14/06/2006 11:37 AM 16115-OW1.dwg
SU: CONSTRUCTION
DEBUILD T/A
CONSULTING ENGINEERS Ss
SCG Structural - civil - geotechnical }
ABN 40 098 481 899
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634
Title: | Driveway cross over details
Project Lot 161 Orealla Cres
Sunrise Beach
Date: May 2006 Drg No. 16115-OW-2)
Rev. - 30.01.05
Used in these records
07/0387 - Approved Plans (09/07/07) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 436 KB (small file)
- File type
No other editions are linked here.