07/0387 - Approved Plans (09/07/07) [As Published] · 142007.387

of 2

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
DRAWING SIZE - At

MANAGEMENT PLAN

~ Ensure the inflow into the pit is protected with
‘Qn approved leaf ond sit guord.

~ The pit MUST be wrapped in geofobric cloth as
specified,

= The pit should be bockflushed on a regular basis
(3 months) to remove ony sits or similiar

    

materiols. . Surface
ston a Should only be used for the disposal of Bund Capped Concrete encased
water.
ormeecte 908 backflush point

Flow

  

As per plan

Slotted Agg pipe
150 min clearance

{o base. 20mm clean aggregate
fully encased in
geofabric.

LEGEND
4{No.) 685x450x408 Atlantis Matrix Drainage
Cells wrapped in geofabric, refer to detail.
CW Garden Wall Footing, refer 16115~St for details
— — SLT — ~— indicates position of approved silt retension
fence.
—X _
FALL Indicates direction of fol! to surface levels.
Refer 16115-OW2 for details
EPP<DX) (ut) Indicates 3000(Lt) under ground holding tanks.
Indicates proposed finished spot surface levels to ohd.

(FOX GBPCT) Indicates FOX GBPCT grease trap.

(i) indicates 3000Lt Water Tank for re-use, refer
schematic,

FILLING NOTES:

~The site is to be scroped clear of alt organic material ond debris.

~ Any fill is to be clean granular moterial (i.e. sond to a clayey sand
in accordance with AS1726) be free of any organic material and have
a clay content of less than 12% (Plasticity Index Jess than 25%, Linear
shrinkage of 15%). The proposed material 's to be inspected by SCG
Consulting Engineers prior to its removal to ensure its compatability.
— The fill is to be placed and compacted in accordance with
AS3798-1996 to a level sufficient to achieve a Level 1 certification
with a minimum relative field density of 95% Copies of compaction
test results shall be presented to SCG Consutling Engineers for
approval.

~ Filling and compacting adjacent exisiting structures is to be in
strict accordance with the associated details and specitcations.

~ Areas where existing structures or trees ore removed shall be
backfilled with the approved fill material compacted in accordance with
AS2870-1996 to achieve ¢ minimum relative field density of 95%

~ Any loose or soft material uncovered in the site preparation shall
be removed and replaced with the opproved fill material compacted in
accordance with AS2870-1996 to achieve a minimum relative field
density of 95%

~ Site droinage and silt protection measures must be installed prior
to construction commencing.

 

Slotted horizontal
‘agg laterals
pipes equally spoced.

   

As per plan

TYPICAL SECTION ~ A - A
DETALS

DRIVEWAY CROSS OVER DETAILS
TO BE IN ACCORDANCE WTH

NOOSA SHIRE COUNCIL'S STD
DRAWINGS 9005 & 9019,

 

APPROVED N.S.C
KERB ADAPTOR

EXISTING KERB AND CHANNELL
TO BE CUT AND REMOVED
AND NEW DRIVE WAY TO BE

INSTALLED TO N.S.C STANDARDS.

20-40mm_ AGGREGATE
HARD STAND OVERLAY
FOR DRIVE WAYS DURING
CONSTRUCTION.

EXISTING DRIVE WAY TO BE
SMASHED AND REMOVED AND
KERB AND CHANNEL TO BE

REINSTATED T6 N.S.C APPROVAL.

EXISTING FOOTPATH TO BE
CUT AND REMOVED. NEW CONC.
FOOT PATH 70 BE REINSTATED
TO SUIT NEW DRIVE WAY. ALL

GRADES 70 NS.C APPROVAL.

APPROVED NSC
KERB ADAPTOR

50
m
”

viva

20—40mm AGGREGATE
HARD STAND DVERLAY
FOR DRIVE WAYS DURING
CONSTRUCTION.

EXISTING KERB AND CHANNELL
TO BE CUT AND REMOVED
AND NEW DRIVE WAY TO BE

INSTALLED 10 N.S.C STANDARDS.

PROIR TO CONSTRUCTION ENGINEERS
IS TO REVIEW CONTOUR SERVERY

(TO BE PROVIDED) ON BOTH ALOMENTS
IN TO CONFIRM THE DETAILS
CONTAINED HERE IN.

 

2.5n2.5x1.0m(D)
STORMWATER SOAKAGE PIT
TO DETAIL. UNDER
DRIVEWAY

   

1500 uPVC > =
{CHARGED LINE) | |
;

 

 

Kerb

2.5x2.5x1.0m(D)
STORMWATER SOAKAGE
PITs TO DETAIL

  

Sow cut ond
breakout
bock of kerb

   
    
  
 
 
 

STORMWATER ASSESMENT

AR. = 100yrs tc = Smins

Q (Pre development} = 93!/s

Q (Post development) = 100L/s
Storage Required = 1.95m3

Solution:

Provide Atlantis Matrix Drainage Cells on
each unit outflow to match the total
volume required. Cells will also allow
infiltration to surrounding soils to
re~charge the water table

BUILDER TO MAINTAIN STABIUTY

 

 

   

  
      
 
 
   
 
 
 
  
  
  
 

Ye ——
Refer Charge rt
Outlet Detail for
branching to tank .
eL—

 

Existing timber

   

 

  
  

   
    

   

 

 

 

  
 
  
   
 

retaining wall
retained.

FFL 99.58 Refer Charged SW 1 £
Outlet Detail for 8
UNIT 2 branching to tank | af
eS
8s
2
es
a 2
25

   

Refer Charged SW
Outlet Detail for
branching to tank

  

Hy , Existing timber
FOR POOL ] retaining wall

ao . ant | OETALS retained

    
   
 
  
 
   

 

 

   

Refer Charged SW
Outlet Detail for
branching to tank |

   
 
 

 

  

 

 

 

 

 

 

 

 

 

FOR GUIDANCE. ALLOW FOR SHEET
PILING OR SIMILAR.

 

THE CONTRACTOR IS TO INSTALL APPROVED SET RETENTION FENCES
PRIOR TO COMMENCING ANY EARTHWORKS. THE FENCE IS 10 BE
CONSTRUCTED ALONG THE LOWEST BOUNDARY AND RETURNED UP SDE
BOUNDARIES TO ENSURE FULL STORMWATER ENTRAPMENT, SURFACE
RUNOFF FROM MTHIN THE ALLOTMENT MUST DRAIN TOWARDS THE
FENCE AND SHALL NOT ENTER NIEGHBOURING ALLOTMENTS THROUGH
THE USE OF SURFACE BUNDING OR SCOUR PROTECTED DRAINS. THE
FENCE MUST REMAIN JN PLACE UNTA SUCH TIME THAT FINISHED
LANDSCAPING AND DRAINAGE MEASURES ARE INSTALLED

   
   
  
 

900(W) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES AND
BURIED 300 INTO STABLE
GROUND.

1200(L) 50 Sq. HDWD SPIKES,
1800 ctrs DRIVE 600 INTO
GROUND.

 

 
 
  
 
  

ENSURE BRANCH TO TANK Me ents
FLOW 'S ABOVE THE 2 7 tee. L

KERB LEVEL (DISCHARGE
POINT) IN OREALLA Cr.

WATER TANK TO BE SEALED TO Z p— — — OUTER Levee —_
RESIST HYDRAUUC PRESSURE — s
FROM ROOF DRAINAGE WHEN PROPOSED ONE WAY

TANK FULL | l DWELLING 5 FLAP. VALVE
INSPECTION OPENING TO / KERB
f as

      
  
 
 

SURFACE LEVEL FOR BACK
FLUSHING OF CHARGE.

 

APPROVED KERB
ADAPTER

RAINAGE a 90 DIAM OVERFLOW FROM

 

 

 
  
 
   
    
  
  
   

 

 

ATLANTIS 9 WATER TANK TO ATLANTIS
SITE PLAN SOAKAGE PITS
n
(Scaie 1:200) -
Ground /
This footing I
without piers |
is founded | The builder contractor
060707_contex1_132555_001 tif | above critical | shell confirm all relevant
This footing is depth fine and! Jevels prior to
founded below is unstoble. | commencing works.
critical line and is .
stable. [tine of
t proposed
sit eiers supporting str I Excavation or
z{5 SLE2 Mesh Atlantis MATRIX. droinage ler Supporting strip | similiar.
sé 1000 middle cells as specified, rapped footings or post pad !
in geofabric footings founded into |
selected material and below Horizontal 30 Deqtees
STORMWATER STORMWATER critical line are considered _~
OUTFLOW INFLOW stable.

 

Compacted
BARRIER, SEM-POUNTABLE, MOUNTABLE sand bed

KERB & CHANNEL OR INVERT CROSSING.

CROSSOVER DETAIL ATLANTIS

(Seate 1:20)

  

NOTE:

| | CRITICAL DEPTH LIN THIS DETAIL ALSO APPLIES 10
WZ EXISTING FOUNDATIONS ON

NEIGHBOURING PROPERTIES, SHEET
PILING MUST BE INSTALLED WHERE
EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION
CRITICAL DEPTH LINE

Provide slotted pipe
through MATRIX cells

 

NA\ AKER PIT

 

  

Me be tae bee

NOTES:

1. Existing footpaths to be saw cut prior to removal

2. Crossings ore not designed for commercial vehicles :
3. Concrete driveway to be 125mm thk. excluding any -—=-
finished treatments, eg. stamping 4
4. Concrete surface tolerance +5.0mm over 3.0m {
5. Concrete N25 in accordance with AS 1379 and AS 1.
3600

6. Reinforcement fabric to AS 1304, placed central slob
depth.

7. Expansion joints to be 10mm wide wet tooled with
every 2nd mesh wire cut aiong joint.

8. One access point permitted for each allotment.

9. For curved driveways, maximum grades apply to inside
edge of curve

10. All services to be located and protected as required
prior to work commencing

MAINTENANCE PROGRAMME FOR FOX TRAP

HOUSEKEEPING

* Large items of floating debris (such as plastic bags, drink cans
etc.) are observed on the inlet grate of the unit they should be
collected and disposed of in a suitable manner. The Fox BPT600
does not capture these items they simply prevent them from
entering the stormwater discharge through the unit.

* Regularly inspect the unit for a build up of captured pollutants
within the silt basket. This should be done on o weekly basis or
more often if lerge quantities of silts are being retrieved.

* To empty the silt bosket the slide bolt on the grate should be
slid beck using a screwdriver or similar and the grate lifted ond
moved forward to enable access to be gained to the bosket.
Please note that the grate is heavy and proper care should be
token when removing it.

* Remove the silt basket and dispose of captured pollutants in a
suitable manner such as emptying it in a garbage bin or similar.
* As soon as the basket has been emptied it must be replaced
and the grote returned to its’ locked position,

For sqfety reasons the unit should never be left unattended when
the grate ond basket are removed. For maximum environmental
protegtion and to reduce maintenance costs the silt basket should
always be in place within the unit.

Regular servicing of the Chomber.
* Fox Environmental Systems recommend that initially the units are
cleanad on o 3 monthly bosis. This service should consist of a
minimum of the following activities.
* Carefully capture any floating hydrocarbons in the chamber.
Captured hydrocorbons must be disposed of in a manner prescribed
“in the Environmental Protection Act.
“ * Pump water from within the chamber and filter through a
minimum 20 micron filter before allowing discharging into the
stormwater system.
* Remove alf silt and sediment build up from within the chamber
and dispose of it in a suitable manner such as emptying it in a
garbage bin or similar.
* Following each service quantities of pollutonts that are removed
should be recorded to enable proper assessment of the serving
frequencies required to be ascertained,
Fox Environmental Systems Pty Ltd offers a full service for the
maintenance of the BPT6Q0 units in SE Queensland, Contact our
Service Manager on (07) 5492 5722 for information and costing

Prepared November 2003

DO NOT SCALE FROM THIS DRAWING

The design and associated details contained on this and associated drawings are
Copyright ond ore not to be used of reproduced without the written permission of

SCG Consulting Engineers.

 

 

 

 

 

 

 

 

Revised FFL’s and storm water to suite
Spot Levels & Finished floor jevels addded
Storm woter retension added,

Storm Woter & Holding Tanks

DESCRIPTION faree,_ |

 

 

 

  

AMENDMENTS

| memes
s=¥*” FOR CONSTRUCTION.

DEBUILD TA

CONSULTING ENGINEERS
SC structural - civil - geotechnical S

ABN 40 098 481 899

     

 

 
 

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title:

OPERATIONAL WORKS PLAN.

   
 

     
 
 
 

 

 
 

Project

OT 161 Orealla Cres,
Sunshine Beach.

 
   
 
 

 

Moy 06 1:100

ow Ne. 16115-OW-1
Full text of the other 1 page

Page 2

DRAWING SIZE - A2

99,589

 

100.147
{100.449

100.837

  

 

EXIST S.L.

 

 

   

DESIGN S.L.

 

0.0 | 99.589

 

 

2700 [99.824
4202 | 99.764

\

in 25 Max
Refer Driveway
Crossover Detail
below

 

 

RP BOUNDARY

 

1 in 8 Max,

RL 97.50
VY

13.165

 
     
   

Grated Drain Slab Level

 

  
  
 

17.689 | 10016

House

    
 

FFL 99.58 ASSUMED
Min. Garage/Carport

DISTANCE

 

 

 

 

DRIVEWAY CENTRE LINE PROFILE ~ LOT 1

 

(1:100)

 

99.85

100.321
100.568

100.986

102.01

  

GFF

 

 

|

  

 

0,0 | 99.85

 

 

2700 100.083
4202 |100.023

 

Refer Driveway
Crossover Detail
below

 

 

RP BOUNDARY

 

Tin 8 Max,

RL 97.50
v

10.270 | 99.41

 

 

 

 

   
 

Housq | Assumed
DISTANCE! DESIGN S.L. | Exist S.L.

 
 
  

    

FFL 99.20 ASSUMED
Min. Garage/Carport
Slab Level

          
 

 

 

 

DRIVEWAY CENTRE LINE PROFILE ~ LOT 2

(1:100)

Revision Description Date
A. Garage Floor Levels revised. 25.06.07.

+

 

 

 

 

Matt 14/06/2006 11:37 AM 16115-OW1.dwg

SU: CONSTRUCTION

DEBUILD T/A

CONSULTING ENGINEERS Ss
SCG Structural - civil - geotechnical }

ABN 40 098 481 899

       

 

  
   

   

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

    

 

 

   

Title: | Driveway cross over details

   

 

Project Lot 161 Orealla Cres
Sunrise Beach

Date: May 2006 Drg No. 16115-OW-2)

       

 

 

Rev. - 30.01.05

     

Used in these records

About this file

File size
436 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Approved Plans (09_07_07) [As Published].pdf · 436 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.