2021-08-30 Special Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Special Meeting
Monday, 30 August 2021
commencing at 1.00pm
Council Chambers, 9 Pelican Street, Tewantin
Crs Clare Stewart (Chair), Karen Finzel, Joe Jurisevic, Amelia Lorentson,
Brian Stockwell, Tom Wegener, Frank Wilkie
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 14 sections
Section 2
SPECIAL MEETING AGENDA 30 AUGUST 2021
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
REPORTS 3
1 T000027 – HINTERLAND BRIDGES REPLACEMENT – TENDER AWARD 3
MEETING CLOSURE -
Page 2 of 15
Section 3
SPECIAL MEETING AGENDA 30 AUGUST 2021
REPORTS
1 T000027 – HINTERLAND BRIDGES REPLACEMENT – TENDER AWARD
Author Project Coordinator, Dennis Luinstra
Infrastructure Services Department
Index ECM/ Subject / Contracting / Tenders
ECM / Projects (T1) / Wahpunga Lane Bridge – CAP. WORK 500961
ECM/Projects (T1) / Tablelands B Bridge Rehabilitation – CAP.WORK
500724
Attachments 1. Tender Evaluation Summary
2. Design Drawings
EXECUTIVE SUMMARY
Two hinterland bridges, Tablelands Road Bridge B Cooran and Wahpunga Lane Bridge Kin Kin were
packaged together as two separable portions in one tender, with the intent to provide a more
substantial and attractive package of works for tenderers.
During the design phase and prior to tender release, scope increases were identified as part of the
Tablelands Road Bridge B replacement project. These include resident access and disruption,
environmental and native title, site constraints and limited access. In addition, the Wahpunga Lane
Bridge also identified a scope increase to address a scour remediation.
These scope increases for both bridges, combined with the current market saturation and recent
steel market price increases, has resulted in tender prices higher than budget. Additional funding
has been obtained from the Federal Bridge Renewal Program to partially cover these scope
increases on a 50% co-funding-from-Council basis.
The tender evaluation panel consider the combined SP1 and SP2 submission by SGQ Pty Ltd (SGQ)
most favourable based on their tender, demonstrating compliance with the tender requirements,
suitable experience, capability and resourcing.
RECOMMENDATION
That Council note the report by the Project Coordinator to the Special Meeting dated 30 August 2021
and:
A. Award separable portions 1 & 2 of tender T000027 - Hinterland Bridges Replacement to SGQ
Pty Ltd for a total value of $3,218,241 (excl. GST); and
B. Approve the total combined project budget of $4,097,864 (excl. GST).
REPORT
The proposed contract is for the replacement of the following timber bridges situated in the Noosa
hinterland:
Separable Portion 1 (SP1): Tablelands Road Bridge B situated on Tablelands Road, Cooran.
Separable Portion 2 (SP2): Wahpunga Lane Bridge situated on Wahpunga Lane, Kin Kin.
Page 3 of 15
Section 4
SPECIAL MEETING AGENDA 30 AUGUST 2021
1. Project Scope
The Tablelands Road Bridge B in Cooran (SP1) and Wahpunga Lane Bridge in Kin Kin (SP2) are
packaged together in one tender in two ‘construction only’ separable portions. The reasoning for this
was to provide contractors a more substantial construction package to quote on.
Both bridges are timber, single-lane bridges and are to be replaced with new wider concrete, single-
lane bridges with a 100 year life-span and unlimited load limit. Both replacement projects
are jointly funded by the Federal Government and Council.
a. SP1 – Tablelands Road Bridge B
The Tablelands Road Bridge B is situated on a relatively narrow, steep and winding gravel
road bordering Woondum National Park and provides the only access to:
eight (8) properties (approximately 6 are occupied); and
the James McKane Memorial Lookout.
The gravel approaches leading into the bridge will be sealed to increase road safety. The
replacement bridge will be constructed within a similar alignment.
b. SP2 – Wahpunga Lane Bridge
The new Wahpunga Lane Bridge will have a slightly different alignment to cater for additional
road safety and an identified scour issue on the northeast side of the bridge will be resolved
by using steel sheet piling and extended guard rails.
2. Tender Process
Due to the value of the work being greater than $200,000, the work has been tendered in accordance
with the Local Government Act 2009 and Council’s Procurement Policy. The invitation to tender
T000027 was released via VendorPanel on Monday 8 March 2021, and also advertised in Noosa
Today on Friday 12 March 2021. The tender closed on Wednesday 7 April 2021, with four
submissions received.
3. Tender Assessment
The tender evaluation panel undertook an assessment of the following conforming tender
submissions, listed in alphabetical order:
Ark Construction Group Pty Ltd SP1 + SP2
Davbridge Properties Pty Ltd T/A Davbridge Constructions SP1 + SP2
Hall Contracting Pty Ltd SP1 + SP2
SGQ Pty Ltd SP1 + SP2
Davbridge also submitted an alternative tender which the panel considered worthy of further
evaluation. Consequently, all 5 tenders progressed to a full weighted evaluation using the following
criteria and weightings:
Criteria Weightings
Capability, Experience & Resourcing 15%
Financial Capability 15%
Methodology 40%
Contribution to Local Economy 5%
Price 25%
The tender evaluation panel assessed tenders for the combined SP1 and SP2 option and considered
the submission by SGQ Pty Ltd (SGQ) most favourable based on their tender demonstrating the
following:
Page 4 of 15
Section 5
SPECIAL MEETING AGENDA 30 AUGUST 2021
Full compliance with the tender requirements.
Very good level of experience, capability, and resourcing to carry out the works.
Detailed methodology and programme which aligns to contract specifications.
Understanding of the complexities of the projects, particularly regarding resident’s access
behind the Tablelands Road Bridge B.
Certified Environmental Management systems.
Certified Workplace Health and Safety systems.
Prequalified contractor with DTMR in roadworks Level R4, bridgeworks Level B3.
Scored highest for non-price criteria and combined price and non-price criteria.
Attachment 1 presents the evaluation outcome of the submissions against the above criteria.
The evaluation panel also evaluated SP1 and SP2 separately. The panel considered there was no
overall advantage to Council in awarding separate contracts for these parts, for the following
reasons:
SGQ scored highest on non-price criteria on SP1 and SP2 individually and SP1 and SP2
combined, meaning lowest risk to Council.
A single contractor for both separable portions minimises staff resources and administrative
requirements in managing the contracts.
4. SP1 – Tablelands Road Bridge B – access during construction
Substantial work has been completed by the project team in the preparation of the tender
specifications to replace this bridge in a similar alignment without a side-track using a staged quick
in-out construction method. This mitigates significant environmental impact, prevents potential native
title issues as well as reducing future maintenance costs, and prevents additional WH&S / road
safety issues during construction.
However, this approach is expected to cause greater disruption for residents living beyond the bridge
accessing their property via vehicle during the construction period compared to building a bridge
adjacent to the current one.
Key mitigation measures will be in place to make sure residents can reach their properties during
construction, including:
The appointment of an experienced external Community Liaison Officer who will work closely
with the Project Coordinator and SGQ’s community liaison resource to proactively engage
impacted residents and deliver effective stakeholder engagement.
Active participation by SGQ in stakeholder meetings including with emergency services.
A temporary ‘scaffold-type’ pedestrian bridge will be available during construction to provide
residents safe access across the creek by foot during full bridge closure.
Before actual construction starts, SGQ will prepare a risk mitigation plan to minimise
construction delays, as well as having back-up plan available during critical stages.
The contractor will provide a taxi shuttle (situated north and south of the bridge) to assist
affected residents to reach their parked cars south of the existing bridge when the road bridge
is closed to traffic.
James McKane Lookout will be closed to vehicles throughout the construction period to
minimise road traffic.
Construction will be completed in three (anticipated) stages.
Noosa Trail access will be provided via a temporary pedestrian bridge.
Three stages of construction
Stage 1
- Piling and abutment works are performed and excavations covered ready for
traffic outside of working hours.
- 4 weeks of road closure is expected (weather permitting) on working days from 8am-
4pm. Pedestrians will still have access via the temporary pedestrian bridge.
Page 5 of 15
Section 6
SPECIAL MEETING AGENDA 30 AUGUST 2021
Stage 2
- Full road closure for an estimated 72hr period. Pedestrian traffic will continue to provide
access during this period via the temporary pedestrian bridge.
- SGQ will demolish existing bridge, expose pre-built abutments, and install deck units
and guardrails.
Stage 3
- 3 weeks expected (weather permitting) to complete final works, which will
include asphalt, approach works and signage.
- Road closure is expected on working days between 8am-4pm. Pedestrians will still have
access.
The abovementioned construction and communication approaches were requirements within the
tender specifications, which contractor SGQ will comply with.
5. SP2 – Wahpunga Lane Bridge – access during construction
Weather permitting, Wahpunga Lane Bridge will have a relatively short construction duration of 12
weeks, due to the prescribed construction method using mostly prefabricated bolt-on components,
combined with a bored piling solution. During the temporary road closure, a detour will be available
along Sister Creek Road and Gympie Kin Kin Road. During construction, part of the Noosa Trail
along the bridge location will be temporarily closed off.
6. Program
a. SP1 - Tablelands Road Bridge
Anticipated construction start date: early October 2021
Anticipated construction end date: mid-December 2021
b. SP2 - Wahpunga Lane Bridge
Anticipated construction start date: early January 2022
Anticipated construction end date: early April 2022
SGQ starts pre-ordering materials with long lead times from mid-September 2021.
Previous Council Consideration
Nil.
Finance
The current budget allocated to the 2 bridges is insufficient to cater for the tender award for both
bridge projects. Key reasons are:
Unforeseen scope increase include resident access and disruption, site constraints and limited
access to reach Tablelands Road Bridge B.
Scour issue near Wahpunga Lane Bridge has been incorporated into the scope.
A saturated market has resulted higher tender pricing than anticipated and higher than cost
estimates based on previous project cost.
Recent further increases in steel market pricing (post tender submission by suppliers)
The below tables summarise the updated project cost estimates. The total cost of the 2 bridges
replacements is now estimated at $4.1 million.
Page 6 of 15
Section 7
SPECIAL MEETING AGENDA 30 AUGUST 2021
Tablelands Road Bridge B replacement (SP1)
Item Cost (excl. GST)
Costs Year to Date (August 2021) $224,000
Tendered Contract Value $974,897
Consultants, superintendent and staff costs $60,500
Qleave $7,400
Subtotal $1,266,797
Contingency - 10% of contract value $97,490
Total project cost (SP1) $1,364,287
Wahpunga Lane Bridge replacement (SP2)
Item Cost (excl. GST)
Costs Year to Date (August 2021) $185,000
Tendered Contract Value $2,243,343
The contract value includes additional construction cost to mitigate scour issue of
$336,377
Consultants, superintendent and staff costs $65,500
Qleave $15,400
Subtotal $2,509,243
Contingency - 10% of contract value $224,334
Total project cost (SP2) $2,733,577
In June 2021 Council applied for additional funding from the Federal Bridges Renewal Program to
co-fund the additional cost. A further amount of $771,748 was approved with 50% co-funding from
Council. Following the additional funding request further cost increases were identified due to steel
market pricing increases, which were unable to be included in the request.
Project funding and shortfall overview
Funding source Funding amount (excl. GST)
Tablelands Road Bridge Wahpunga Lane Bridge
Total approved project funding $954,576 $1,527,322
Additional approved grant funding $203,944 $567,804
Additional Council budget required* $205,767 $638,451
Total estimated project cost $1,364,287 $2,733,577
With the additional grant funding secured in August 2021, the additional cash impact to Council will
be $844,218. The additional budget required for both projects (including additional grant revenue)
will need to be considered at Budget Review 2 (BR2).
Risks & Opportunities
Finance Risks Mitigation
Council request for scope This is to be mitigated through the Capital Works Project Control Group and
increases. Capital Works Executive meetings and limitation of client requested scope
variations.
Scope changes once Council acceptance of scope as awarded with intention of not increasing
construction commences scope.
and project becomes
publicly visible.
Page 7 of 15
Section 8
SPECIAL MEETING AGENDA 30 AUGUST 2021
Finance Risks Mitigation
Geotechnical conditions A detailed Geotechnical investigation report has been completed and the
give rise for contractor report provided as part of the tender documentation. Any required variations in
claiming variation costs. depth will be worked out by variation rates that have already been locked in
with the contractor as part of the contract specifications. A budget contingency
allows for this risk.
Subgrade material found Tender specifications specify clearly how and until what extent the existing
to be unsuitable for reuse subgrade material needs to be processed to reuse these materials. In case a
purposes within the certain amount is not found suitable, locked in rates are in place as part of the
projects. tender evaluation clarification process. A budget contingency allows for this
risk.
Clashes with public utility Prior tender phase, Council staff had extensive collaboration with Telstra to
provider Telstra give rise lock in the scope and timeframes. The contractor is aware of the requirements.
for contractor claiming The contractor will coordinate activities around these relocations.
variation costs.
Contingency amount This risk is mitigated through Council's highly experienced project team and
being insufficient. the appointment of an experienced contractor and contract supervision by an
experienced Superintendent. Any delay risks forthcoming of the current
pandemic is not included in the contingency amount. If contingency amount is
insufficient to cover the cost, this is to be mitigated by the budget approval
process.
Site access constraints Extensive research has been performed by the project team together with
give rise for contractor external consultants to make sure the bridges can be replaced using the
claiming variation cost. available access roads for SP1 as well as for SP2. Access constraints are well
embedded into the contract. A low residual risk is identified for SP2, captured
in the projects risk register and mitigation is budgeted into SP2’s project cost
estimate.
Program Risks Mitigation
There is the potential that Expected wet weather days are included in the tenderer's timeline.
the project is delayed due
to wet weather.
Resource risk. The contractor has nominated a capable team to undertake construction.
Construction takes longer The contractor is well resourced and has the available resources to deliver this
than allowed for. project successfully in conjunction with current works on hand. The use of
mainly precast materials such as concrete abutments, piers and deck units
reduce the risk of construction delays.
Lead time of materials Many associated risks are mitigated by ordering the materials as soon as
pushing the program out. possible after tender award. Especially the sheet piles required for Wahpunga
Lane bridge could have lead time issues, mainly due to the pandemic and
higher demand. The contractor is aware, manages this risk and works closely
together with Council's project team to minimise residual risk. As the sheet
piles are a key item in the construction, other options will be explored (e.g.,
alternative size of sheet pile with the same capacity and durability).
Safety Risks Mitigation
Site safety. The contractor has extensive experience with similar works and would be
appointed as the Principal Contractor responsible for all Workplace Health and
Safety of the site. Prior to construction commencing, workplace health and
safety and final traffic management plans will be required to be submitted to
Council for review. Regular audits on contractor compliance with these
approved plans will be undertaken by Council and WH&S teams throughout
construction.
Page 8 of 15
Section 9
SPECIAL MEETING AGENDA 30 AUGUST 2021
Safety Risks Mitigation
High-risk work using The contractor is accredited to AS 4801 (Occupational Health & Safety
machinery and hoisting Management Systems) and the contractor has demonstrated their capability
involved. through the tender process. The contractor is experienced having successfully
completed several similar type bridge projects within the past years, moreover,
was principal contractor within the Sunrise Beach, Orealla Crescent Bridge
replacement project.
Environmental Harm Mitigation
Risks
Works impact on the The contractor is responsible for the development and implementation of
environment. strategies to minimise impacts such as noise, dust, vibration, sediment and
erosion. Approved plans will be in place to manage species such as Tusked
Frogs. Necessary tree removal and trimming requirements are brought to a
minimum in the design phase and are well specified in the contract
specifications. The superintendent and Council staff will closely monitor the
construction phase to ensure all impacts are minimised.
Scope and Quality Mitigation
Risks
Risk of not meeting To be managed through reviews performed by experienced Superintendent
project objectives. and Council staff, supported by a specialist consultant.
Public Disruption Risks Mitigation
Traffic disruption due to See the 'access during construction' section in this report. Maximum road
total road closure at the closure durations and timing windows are well specified in the contract and are
site location. endorsed by an external legal advisor upfront tender release. The current traffic
use of both roads at bridge locations is minimal.
Communication issues. For SP1 – Tablelands Road Bridge B, Council has engaged an external
experienced communication / community engagement consultant who will
closely work with Council’s Communications and Infrastructure departments,
as well with the contractor to inform affected residents and businesses.
For SP2 – Wahpunga Lane Bridge, the internal experienced Infrastructure
Communications and Consultation Officer is appointed to the project.
Noise from plants and This will be minimised by working during normal working hours where possible.
equipment may be a
cause of disruption to
residents.
Vibration during piling and At Tablelands Road Bridge B, the specified piling method of micro piling
demolition. (boring) due to the soil conditions minimises vibration.
For the Wahpunga Lane Bridge, due to soil conditions, a bored pile solution
with steel liners has been specified which uses an auger drill and is less
intrusive compared to the usual pile driving. Sheet piles will be used to mitigate
the existing scour issue along the eastern bridge approach. Common vibration
techniques will be used to install the steel sheet piles during a relatively short
duration of around one week expected, pending soil conditions.
Disaster occurs during For Tablelands Road Bridge B, the experienced contractor uses detailed
construction e.g. bushfire weather forecasting to plan ahead and will liaise with emergency services
and properties are not upfront, especially to plan the 72hr full road closure duration (Phase 2).
accessible. On-site availability of steel road plates mitigates access constraints for
emergency services by providing an ad-hoc access option to all properties
behind the bridge outside the 72hr full road closure duration.
For Wahpunga Lane Bridge, before the contractor starts deconstructing the
existing bridge, detours will be in place. Emergency services, affected
residents and road users will be informed regards detours well upfront for them
to plan ahead.
Page 9 of 15
Section 10
SPECIAL MEETING AGENDA 30 AUGUST 2021
Public Disruption Risks Mitigation
Inability to attend to As soon as possible after the tender award, a meeting will be held with the
medical condition of a contractor, project team and emergency services regards risk and limited
local resident, situated access during construction windows. Contact will be sought with affected
behind the Tablelands residents to discuss situation and access constraints.
Road Bridge B. Temporary relocation of any high risk residents during the 72 during full road
closure (except pedestrian traffic) could be an additional risk mitigation if the
residents agree.
The set methodology and construction phasing in the contract specifications
minimise road closure durations compared to common bridge construction
methodology. Moreover, during any road closure, the contractor has small taxi
buses available to transport residents from their property north of the bridge to
the temporary pedestrian bridge, and to bring them to their parked cars south
of the bridge which could transport medical staff and equipment if required.
Consultation
External Consultation - Community & Stakeholder
Telstra
Direct affected community residing north of the Tablelands Road Bridge B.
A comprehensive communication plan has been drafted and initial activities have been
undertaken as part of the project delivery.
A community consultation meeting was held with residents near Tablelands Road Bridge B in
late 2020. Residents were receptive to the temporary disruption to replace the existing bridge, with
a request they are kept well informed. Residents south of Tablelands Road Bridge B have offered
impacted residents north of the bridge to park their cars at their property if needed during
construction.
Internal Consultation
Departments/Sections Consulted:
Chief Executive Officer Community Services X Corporate Services
Executive Support Director X Director
Community Development X Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws X Procurement
Waste & Environmental Health Property
Revenue Services
Executive Services Environment & Sustainable Development X Infrastructure Services
Director Director X Director
Community Engagement Building & Plumbing Services X Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 10 of 15
Section 11
SPECIAL MEETING AGENDA 30 AUGUST 2021
Page 11 of 15
Attachment 1, Tender Evaluation Summary
NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
a
NAME OF TENDERER PRICE
(Conforming Tenders Only) (excl of GST)
1
2
3
2
5
1 2 3 4 5
= a a Rezuitart score Resultart zcere
rciriwencenmne | oe | ws | wm | ow | ew | [om | w | om | ome | oe |
amc || fee | [ee | [ee | |e | ew
foment we fo fom | [me poe fe | | oe |
fomoomaemy | = | © |= | © | | [ow | os [om | os | om |
stem a ee
PART 8 - Price element Danpridge Construcsions~) » avbridge Constructions | ““* Construction Group S6Q Pty Ltd Hall Contracting Pty LTd
= = bridge Cons: tions Pty itd Pty al acting Pty
Total Fees (Pc) 25% $779,782 $967,783 $974,897 $1,004,844
Average Fees (Pav) S..ccccemeesenenesee $898,315
ran Pe
rei Pn Se a ee ee ee ee ee
Weighted Price Score (Pw)
Evaluation Panel Chair & Assesment Panel Member t
Assesment Pane! Member 2 Delivery Coordinator, Infrastructure Services
Assesment Pane! Member 3 Contracts and Project Superintendent, Infrastructure Services
Assesment Pane! Member 4 Environment Officer, Environment and Sustainable Development
Assesment Pane! Member S Workplace Health and Safety Advisor, Executive Services
Assesment Pane! Member 6 External Consultant - Calibre Group
Page 11 of 15Section 12
SPECIAL MEETING AGENDA 30 AUGUST 2021
Page 12 of 15
SPECIAL MEETING AGENDA 30 AUGUST 2021
NOOSA SHIRE COUNCIL —_ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
Gomeractttos 00027
|_| NAME OF TENDERER PRICE
‘Conforming Tenders Only} (excl of GST)
7
2 SEPARABLE PORTION 2
3 fscoryis 0 288 33]
4
Le
1 2 3 4a 5
femieeentemee [ee [er [em |e [ee |e [ee | maw |e | om
hesscwmny ssw pee fe [ew [epee |e paw [el oo
fmemocotory | am | ses | ts [reas | xem | ms | sso | os | asao | oom |
ea
TotTecmicasscore | Sm] Sos] stats | sass | sas | wo
——
‘otel Fees (Pc) 25% $1,842,615 $1,980,420 $2,243,343 $2,322,088
Average Fees (PAV) $cc ccceseesene $2,097,117
rice Score Pew et
Es Pp || ll
AssessmentPonel =| Pesitomive
Page 12 of 15Section 13
SPECIAL MEETING AGENDA 30 AUGUST 2021
Page 13 of 15
NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
INAME OF TENDERER PRICE
(Conforming Tenders Only) (excl of GST)
1
3 JArk Construction Group Pty Ltd SP1+2 2,896,203
4
5
1 2 3 4 5
‘ al Davbridge Constructions | Ark Construction Group Hall Contracting Pty Ltd
PART A- Non price elements Alternative $P1+2 - inc. a Pty itd SP1+2 SGO Pty Ltd SP1+2 —
- . A -f LL
discouat
a weighting
fru eewessewwe | oe | os | om | ws | om | @ | am | me | om [ome | ne
fone | mf = fom | = fom | = [om | fe | = | me |
eS
foanmvoiaicoww | = | © | | © | 2» | ws | om | os | om | os | ox |
Tecnica ee ee ee
Normalised Technical Score (Tn)
a ee ee
Davbridge Constructions -
- . Davbridge Constructions | Ark Construction Group Hall Contracting Pty Ltd
discount
‘otal Fees (Pc) 25% $2,605,882 $2,622,397 $2,896,203 $3,218,241 $3,326,932
PrABE FEES (PAV) Sevesceseemenesenrensee $2,934,131
“sco ps em
sesso ewe
ighted Price Score (Pus)
Total Score of price and non price elements
ent
Assesment Panel Member 2 Delivery Coordinator, Infrastructure Services
Assesment Panel Member 3 Contracts and Project Superintendent, Infrastructure Services
| Assesment Panct Member? | External Consultant RoadPro Consulting |
Page 13 of 15Section 14
SPECIAL MEETING AGENDA 30 AUGUST 2021
Page 14 of 15
SPECIAL MEETING AGENDA 30 AUGUST 2021
Attachment 2, design drawings
Tablelands Road Bridge design (SP1)
EXISTING TREE RETAINED. FINAL uv
DETERWINATION-TO BE PERFORMED ON ,
{ SITE BY APRINCIPAL-APPOINTED ARBORIST a
a < = a a
~ F 3; & 3 3 “
7 a @ EXISTING TREES TO é 3% 3 ye
“sy EXISTING SERVICES Yos BE REMVED 3 dm PRECAST”
*S TO. BE RELOCATED t t REREVING SLAB _¢
~ BY TELSTRA ba 13600 PAN v “Ze
SS Ss BAP, |. seRvices BRACKET ATTACHED TO DECK 4 ara ae — “| a"
Sy ~~ | Oe Peain UNIT ON DOWNSTREAM SIDE ONLY Se era oj | ae “so —
: ele - ir 4 Litre rh a
Fan A “NS | Fe ee na Pe | oO" yo -*
) am praca} “>=~-—— Ppiobesceesg |i eo] Tt gone
RELIEVING PrEMA Pere aaa ele ee eee wee
~ Ue teeaieed & ne Aaeaiard \ -—
~~ ~ >~ Batis z | lez Hea Lai -—
SN Se peceasy El | > Ra ees ~*S
~~ | Al Bite : p emer oil [ \g oa
past ; Seite =
. > ae ~lh EA A a iy bares bE 4\~ _\ re
SS 2 a pataee i eee ee — a
SL | oars ea og a
“— — J a ST ye | — ee
= T Mare Pac ~ ADA Yet 7 —
ss Cea ie ¥ ‘ Me areal | 4 e —_—_—
Br Pree EXSTING Uh yw —
~ ree rec moot Bae ear] | z
Le Bade
+ SEMA Cae 800 DEEP PSC EXISTING ab Leyes a
TLS AND ret DECK UNITS BRIDGE PIER SARGALIS AND
HEADSTOCKS HEADSTOCKS
EXTENT OF DUMPED ROCK EXTENT OF DUMPED ROCK
SHOWN INDICATIVE ONLY SHOWN INDICATIVE ONLY
GENERAL ARRANGEMENT PLAN
SCALE: 1:75
— £ ABUTMENTA venan sop ener £ ABUTMENTS TO COORAN—=
‘en PRECAST EXISTING BRIDGE |
RELIEVING SLAB | wean Steet PRECAST | aoa suas FINISHED SURFACE LEVEL
EXISTING BRIDGE BARRIER 7 i __
a | FS
7 SURFACE ee a a CO __
nrg ee tL pastas
PRECAST ABUTMENT iT] SSS SSS SSS SSS a PRECAST ABUTWENT SUT AE
AND WINGWALLS | oN 650 DEEP || s P| AND WINGWALLS
lh S PSC DECK tt “ fe
erent sisse0 ; | { > UMTS 11 as | EXISTING ROCK
t— | DY euso Lo \ f | \ LEVEL Ht312.3¢0
ely {
_—______—-t i -L j ®
£146 MICROPILES: ? | \ / NLL oh j 14
1 existing ROCK PROTECTION TO BE MADE GOOD AND —\ ! w OME MICROPEES
| RESHAPED TO SUIT EMBANKMENT PROFILE DUNP ' | »
ADDITIONAL ROCK AS REQUIRED REFER TO DRAWING
DATUM HEKGHT 310.000m S241 AND SUPPLEMENTARY SPECIFICATION 202
Page 14 of 15Section 15
SPECIAL MEETING AGENDA 30 AUGUST 2021
Page 15 of 15
SPECIAL MEETING AGENDA 30 AUGUST 2021
Wahpunga Lane Bridge design (SP2)
¢ ABUTMENT A < PIER! 5 <PER2 ¢ ABUTVENT SB
| | | |
NY | EXISTING BRIDGE f
[ 7000 12000 reco
ee CLA 7 BEEN fy
!
pe gag eg eS
=— TO como __ ill fi ------------1~ A Ot Il} TO CEDAR POCKET —-
Wl | | i]t |
1 | 1 ht Pooscrossra 1 || | ¥
MFUNGA LINE iM pak oy 3S ROAD CONTROL LINE
| | 25% CROSS FALL rt | i
! | | | | | i 300 THK RELIEVING SLAB
__ infest oe AT BOTH ABUTMENTS
———_ Se pet ee 7 f7-__1-__1-- tour 1-7. | 8 TE ee
7 oa 7 = ! | } :
| SERVICES BRACKET TO BARRIER POST | 8
fourmenr pnov-cnom I | ON DOWNSTREAW SIDE ONLY I }
wevrmcere 7 | | 7
DRAWING S120 TO S182 I I I {
| | | ABUTMENT PROTECTION |
GENERAL ARRANGEMENT PLAN
2000 yr ARI FLOOD LEVEL 100 y: ARI FLOOD LEVEL
ABUTMENTA PIER 1 | <PER2 ABUTMENT 8
=—TOCOMO LSB Om FLSE70n DESTIN GROUND LEVEL TO CEDAR POCKET —e
7000 = 12000 7eco
SPT | eN2 1 SPAN
{-—_ HES = SSS SS SS =e
i-------- + = Comat PRECAST PIER HEADSTOCK Hy dé. ISSA
Spo Oo oop | |
| ekes EARTHIVORKS PROFLE be
5 1 1 1 33 6 2103 1749 132 12 0 aaa
5 1 1 1 33 7 2420 1714 2 44 77 |
5 1 1 1 33 8 2503 1730 88 40 93 PRECAST
5 1 1 1 33 9 2590 1730 100 40 89 ABUTMENT
4 1 1 1 34 0 967 1758 1650 37 -1
5 1 1 1 34 1 967 1769 2 13 31 |
5 1 1 1 34 2 1111 1758 63 37 57 BEAM
5 1 1 1 34 3 2007 1773 12 7 34 -
5 1 1 1 34 4 2420 1769 2 13 0 !
5 1 1 1 34 5 2511 1769 106 14 95 HEADSTOCK
4 1 1 1 35 0 1332 1781 652 44 -1
5 1 1 1 35 1 1355 1781 4 44 0 |
5 1 1 1 35 2 1949 1793 35 28 44 a
4 1 1 1 36 0 967 1790 1707 77 -1
5 1 1 1 36 1 967 1791 2 44 93 |
5 1 1 1 36 2 1161 1845 123 15 11 seecrounc.
5 1 1 1 36 3 1335 1821 83 44 0 LJ
5 1 1 1 36 4 1452 1823 495 44 29 ___NMCATIVENATURAL
5 1 1 1 36 5 1710 1817 64 54 86 WATER
5 1 1 1 36 6 1773 1823 174 44 35 LeveL”
5 1 1 1 36 7 2007 1790 24 72 59 J
5 1 1 1 36 8 2420 1791 2 44 93 |
5 1 1 1 36 9 2511 1840 36 15 26 2s
5 1 1 1 36 10 2560 1810 27 53 64 oR
5 1 1 1 36 11 2590 1810 28 53 36 CE
5 1 1 1 36 12 2617 1810 57 53 36 FILES
4 1 1 1 37 0 1151 1864 1530 28 -1
5 1 1 1 37 1 1151 1865 66 27 95 REFER
5 1 1 1 37 2 1224 1865 83 27 64 DRAWING
5 1 1 1 37 3 1360 1877 21 9 86 >
5 1 1 1 37 4 1422 1865 64 14 30 Te
5 1 1 1 37 5 1792 1865 68 23 25 _—"
5 1 1 1 37 6 2032 1877 20 9 14 L
5 1 1 1 37 7 2501 1860 50 27 72 WITH
5 1 1 1 37 8 2559 1860 53 27 92 STEEL
5 1 1 1 37 9 2614 1860 67 27 89 UNERS
4 1 1 1 38 0 1067 1873 988 114 -1
5 1 1 1 38 1 1067 1878 27 90 0 ]
5 1 1 1 38 2 1161 1883 41 36 64 $180
5 1 1 1 38 3 1202 1883 24 36 64 TO
5 1 1 1 38 4 1234 1883 37 36 67 $182
5 1 1 1 38 5 1338 1877 44 81 0 7
5 1 1 1 38 6 1522 1886 25 5 9 WT
5 1 1 1 38 7 1546 1878 49 43 9 tee
5 1 1 1 38 8 1697 1895 54 22 24 eee
5 1 1 1 38 9 1972 1873 83 114 66 li
4 1 1 1 39 0 1316 1923 960 86 -1
5 1 1 1 39 1 1316 1923 66 86 43 rh
5 1 1 1 39 2 2106 1948 170 39 18 ort
4 1 1 1 40 0 1120 1980 937 61 -1
5 1 1 1 40 1 1120 1980 46 39 73 2.900
5 1 1 1 40 2 1165 1980 33 39 44 DIA
5 1 1 1 40 3 1201 1980 30 39 44 CIP
5 1 1 1 40 4 1233 1980 60 39 68 PLES.
5 1 1 1 40 5 1985 1980 47 61 9 ||
5 1 1 1 40 6 2036 1980 21 61 84 |
4 1 1 1 41 0 1123 2019 170 14 -1
5 1 1 1 41 1 1116 2015 51 26 64 WITH
5 1 1 1 41 2 1173 2015 55 26 94 STEEL
5 1 1 1 41 3 1227 2015 68 26 95 LINERS
4 1 1 1 42 0 1007 1987 1047 108 -1
5 1 1 1 42 1 1007 2029 74 40 39 RL2Em
5 1 1 1 42 2 1335 1987 45 108 0 !
5 1 1 1 42 3 2005 2040 49 27 72 an
4 1 1 1 43 0 967 2069 510 24 -1
5 1 1 1 43 1 967 2069 2 16 75 |
5 1 1 1 43 2 1422 2079 27 14 21 20
5 1 1 1 43 3 1450 2065 26 38 46 Om
4 1 1 1 44 0 967 2068 1579 111 -1
5 1 1 1 44 1 967 2093 2 69 84 |
5 1 1 1 44 2 1356 2134 2 16 81 |
5 1 1 1 44 3 2005 2068 46 111 49 |
5 1 1 1 44 4 2446 2135 100 17 26 son
4 1 1 1 45 0 967 2154 1455 65 -1
5 1 1 1 45 1 967 2168 2 51 95 |
5 1 1 1 45 2 1356 2158 2 61 95 |
5 1 1 1 45 3 2061 2154 31 33 57 Ri
5 1 1 1 45 4 2099 2154 45 33 0 s8.0m
5 1 1 1 45 5 2420 2168 2 51 95 |
4 1 1 1 46 0 2981 2285 289 44 -1
5 1 1 1 46 1 2981 2285 105 44 96 Page
5 1 1 1 46 2 3104 2286 46 34 96 15
5 1 1 1 46 3 3166 2285 42 35 96 of
5 1 1 1 46 4 3224 2286 46 34 96 15