08/0274 - Operational Works - Transport Type 5 - Jetty [As Published] · 142008.274
Checklist - Applications Involving Land
Development & Land Use Sections
x
’ NV
IDAS APPLICATION.
This checklist should be used for any !DAS application. Please check each of the following items before accepting an
applica.on at the counter.
4. APPLICATION FORMS
41 Form 1 FartA
4.1.1. Ensure that the form is fully completed. “
4.1.2. Inthe case of an MCU or Op Works below the high-water mark, owners consent is required.
4.1.2.1 If there are multiple owne:s, the consent of cach owner is required.
1.1.2.2 Ifthe owner of the land is 2 company, either ACN No. or Company Seal required.
4.2 Form Part B-O Supporting Information
4.1.2. Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
4.1.2.1 Ensure tat each of Forms B-O which are attached are fuliy completed. L7]
2. REFERRAL INFORMATION .
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. CA
3. ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1. Ensure that Part G is completed if EPA referral is required. {
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded cn the application.
‘4, ' FORM-2- REQUEST TO CHANGE APPROVAL -
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. PLANS .
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationat
Works) accompanies the application. In eddition ensure tnzt each set is compiete.
£.2 Ensure that 4 of the copies of the Plan of Development is in an A3 or A4 format and is -
unbound.
6. SUPPORTING INFORMATION
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
7. FEE? “ee me os
ie}
rd]
us
oo:
7.4. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid. <
7.2. Ensure that the fee which has been paid is recorded on ihe application form. |
Receiving Officer ..4 S ; :
Hav...g completed this form and acce ted the on, please deli. ; both to the f ‘owing IDAS A_ ‘ication Recei 1g
trays:-
« Ifthe application is for a Material Change of Use exclusively -ACP1's desk in the Land Use Section.
« ifthe application is for an Materi | Change of Use & Reconfigurstion - AOP1's desk in the Land Use Section.
« — (fthe application is for Operations! Works (for purking, access, sewerage or crainage) exclus..ely - AOD2 in ihe
Land Development Section.
* (nall other circumstances - AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP} g:\ant\forms\applicauion checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
Bec RO ee ence sele (nee
Part A
Common details
Identiti cation of the premises the subject of the application
1. Can any part of the premises be identified by a street address or fot on plan n description?
LJ No - Answer Qi(a)
{] Yes - Complete Table 8 and answer Q1{b) and Q1(c}
Table B
@ Lot on plan description
number fog. RP, SP) number
a7 Masthead Quay Noosaville 4566 603 RP 883862 Noosa Council
1(b). Can the address be further described by shop/tenancy number or storey/level?
x
(1 Yes - Complete Table C
1(c). 1s any part of the premises strategic port land under the Transport Infrastructure Act 1994?
—] No
(1 Yes - Complete Table D
2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on a site within a large rural toy?
[X] No
@ [] Yes - Complete Table E
3. Are the premises within or adjacent to a water body or watercourse?
LJ No
Yes - Complete Table F and answer Q3(a)
Table F
Name of water body or watercourse
1 Noosa Waters Canal
3(a). _ {1s any part of the development proposed in tidal waters (ie. below high water mark)?
—K] No
(1 Yes
Page 3
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 4. Whatis the total area of land that makes up the premises (ie. the area covered by the application)? Area of land above high water mark/outside watercourse Area in a water body or watercourse 800.00 (jm? []hectares (Tick applicable unit) (im? [hectares (Tick applicable unit) Existing use of the premises " , 5. Are the premises currently used for any purpose? (J No Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. location and nature of existing uses, buildings, structures and services 6. Are there any existing easements on the premises (eg. for vehicular access, electricity, overland flow)? EX] No LJ Yes - Complete Table H and ensure the tocation and dimensions of each easement are included in plans, submitted with the application [Proposal detaiis eae re OF 7. Are new uses proposed on the, premises? ([] No [KX] Yes - Provide details in Table | Table | Each proposed new use 1 New timber jetty 8. Are new buildings or structures proposed to be erected on the premises? mn) &X] Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the application (Applicant details ~ ~ ~ . ~ om ] 9. Whois the applicant for the application? Company/organisation name (it applicable) Jetter Pty Ltd ATF Jetter Property Trust C/- Noosa Jetty Builders Individual! contact person details Postal address [PO Box 299 Noosaville, QLD 4566 | Contact telephone number lo7 §474 3480 | Mobile phone number [0408 137 526 | Facsimile number lor 5474 3480 e-mail address [email protected] ] wer’ s consent and re resource entitlement 10. Does the application involve a State-owned | resource prescribed by schedule 10 of the integrated Planning Requlation 1998 (P Reg) o any other regulation? [Xx] No oO Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement
Page 4
Ke « Mandatory attachments and and ! supporting | information 7 INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007 11. Does the application invotve land other than State-owned land (i.e. privately owned land) and require owner's consent? [J No 4) Yes - Complete Table K and submit, with the application, written documentation of all owner's consent Table K Date written consent was obtained 1 Jetter Pty Ltd ATF Jetter Property Trust | 27 Masthead Quay, Noosaville QLD 4566 05/02/2008 Owner name/s Street address or lot on plan description 12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and supporting information accompanying this application, not identified in those other form parts? len eae y fom t oeners once Cadone of | (eg. Conerl haha lone SetTat Date Method of delivery to resource allocation/entitlement, plans, drawings, reports) Report) assessment manager 1 Part E 05-Feb-2008 | over the counter 2 Checklist 05-Feb-2008 | over the counter 3 Owners Consent 05-Feb-2008 | over the counter 4 Plans 08/ Feb 2008 over the counter ae 13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for the application can be given? No CI Yes 13(a). Indicate the reason PLSL is not applicable Portable Tong’ Service Leave (PLSL) levy for building an and construction work [1 The application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave) Act 1997, section 3AA (e.g. the application is only for a change of use or for the following types of work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); OF & Allcosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or (1) The work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner- builder permit number stated). The receipted form must be sighted by the assessment manager before a development permit can be given OFFICE USE ONLY Date Received Reference Numbers [ o fy J 2n ~ | L_ " ~— FOR COMPLETION BYASSESSMENT MANAGER | Is a QLeave Notification and Payment Form required for this application? LJ No Lo] Yes - Complete Table M
Page 5
PILE-IT Pty Ltd Ri LEASE
Trading as ETURN
Noosa Jetty Builders
LETTER ABN: 55099036736
No: 0001 BSA: 1111115
DATE:5/02/2008
FROM: Noosa Jetty Builders
PO Box 299 Phone: (07) 5474 3480
Noosaville Fax: (07) 5474 3480
QLD, 4566 Mobile: 0408 137 526
To Whom It May Concern,
I John Jetter Director of Jetter Pty Ltd ATF Jetter Property Trust, give Pile-It Pty Ltd
t/a Noosa Jetty Builders permission to submit an application for prescribed title works
on my behalf.
Address: 27 Masthead Quay,
Noosaville. QLD Post Code:4567
Phone: 5473 0885 Mobile: g@4/ 7526 £99
Email: [email protected]
Yours Sincerely, RLS
Lh
fear [uf RECEIVED \o
43 FEB 2008
HOOSA SHIRE COURCIL
FRONT COUNTER
Crm”
Page 6
Building &/or operational works assessable against a planning scheme Nature of the works 1. Is the application seeking approval of building work assessable against the local government planning scheme? KK) No LI Yes 2. |s the application seeking approval of operational work assessable against a planning scheme? @ (No Yes 2(a)_ Is the application seeking approval for more that one type of operational work? EX] No- Complete Table B (1 Yes - Complete a new Table 8 for each type of operational work Table B (i) Whatis the nature of the operational work? (CJ Roadworks (LJ Stormwater [| Water infrastructure (-] Sewerage infrastructure (7 Landscaping (7) Clearing vegetation under the planning scheme (-] Earthworks (7 Drainage Works [X] Other - Specify below New timber jetty (ii) Is the application for operational work involving the creation of new lots? —X] No @ (2 Yes - Specify number below (iii) What type of approval is being sought? (L) Preliminary approval [X] Development Permit (iv) Is there a current Preliminary Approval for this operational work on the premises? 1] No (1 Yes - Complete Table Ba) (v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development? EJ No (7 Yes - Complete Table B(b) ‘Mandatory information 3. Confirm that the following mandatory information accompanies this application Confirmation of lodgement Method of lodgement IPians showino the nature and location of the oranosed works finchutina the extent of any ext and Fil: S21 Confirmed over the counter
Page 7
INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 September 2007 OFFICE USE ONLY Date Received Reference Numbers
Page 8
INTEGRATED PLANNING ACT 1997 Advice for completing Part E Part E, Version 3.0, 3 September 2007 Generat advice » — Part A must also be completed for all IDAS development applications. ¢ All questions must be answered unless, following a response, there is a statement to go directly to a particular question. Q1&2 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur. Proposal ID Click here to submit your DA
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IDAS
Assessment Checklist
DAS Development Apptication Form 1 is the approved form for all development applications under the Integrated Planning Act
1997. Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all applications. The
relevance of other Parts of Form 1 depends on the nature of the apptication.
Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1 and all other relevant sections of the IDAS Assessment Checklist must be completed for all development applications
except those for building work requiring assessment against the Building Act 1975 only. For more advice refer to Part B of the
IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
If unsure, phone or visit your local government or log on to the IPA website for help.
Does the application seek approval to materially change use of the premises? Oyes |g No
ifyes - complete Section 2 of this checklist
Does the application seek approval to reconfigure a lot?
ifyes - complete Section 3 of this checklist and Part F of DAS Application Form 1 Yes |KINo
Assessment is by the local government
Does the application seek approval to carry out operational work?
ifyes - complete Section 4 of this checklist & Yes |LINo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? [Yes |2No
if yes - complete Section § of this checklist
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme?
eme Ba Yes |CINo
{f yes - complete Part E of IDAS Application Form 1
Assessment is by the local government
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1 (Yes |KINo
Assessment is by a building certifier
1 WU ie “| Section 1 must be completed for all applications that require completion of the DAS Assessment Checklist.
WERTAGE
14 ls any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?
x )
LI Yes
IPA, sch dule & prt t table 5 tem 2
IP Regulation, schechie 2. tabie 2, dem 18
IPA, section t 3.5 (Definitions for terms used in development)
REMOVING QUARRY MATERIAL; WILD RIVER AREA i
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
—X] No
0 Yes
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
JPA sehedte A pat? labh + sem 7
PReyulatan y rue? bbe c tem")
Deane Secue dbs £anrecs ty. corea)
Water Act 2000 section 9660
Wild Rreets Act 2008 sechen 43A
"ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[I] No
CL) Yes
IPA schedule &. part 1 tab. 2 tem 1
IPA schedide 6, pad Tiaba a tems Zand 4
IP Regulation, schedule 2, table 2, dems T und 23
Environmental Protection Act 1994, section 73AA (wild river area)
Wid Rivers Act 2005, section 43A
[WITHIN THE LIMITS OF A PORT eee
14 \s any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
XX] No
OO Yes
JP Regulation, schedule 2, table 2, tems 15 and 16
DECLARED FISH HABITAT AREA a : 4]
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
—X} No
[11 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation schedute 2 table 2. Hem 26
‘COMMUNITY INFRASTRUCTURE °
1.6 Is any part of the premises designated for community infrastructure?
No
{] Yes
IP Regulatinn, schedule 2, table 3 item 7
WASTE WATER MANAGEMENT Ce - - a : ~
17 Does the proposal involve the establishment or expansion n of a waste water disposal system?
XJ No
L] Yes
IP Regulation. schedule 2, tatle 3, tem $
IS ue : ae Mog Section 4 must be completed when the applicaton seeks approval to carry out operational work.
PLANNING SCHEME
41 Is any of the proposed operational work assessable under a planning scheme?
[1] No- Goto Question 4.2 below
kK) Yes - Complete Part E of DAS Application Fo Form 7 and Questions 4.1.7 - 4.1.8 below
‘STATE: CONTROLLED ) ROAD
- |
4.1.1 Is any part of the premises within 100m of a State-controlled toad, or part of a future State-controlled road?
[x] No
(I Yes
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 If no, is the proposed operational work listed in integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold? J No L] Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. Ip Regutation schetute 2 iatls 2 em 3 IP Reguwation. schedine é k : tem Ib} ‘ACID SULFATE SGILS 4.1.2 Is any of the operational work proposed in a local government area listed? in State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils? No (J Yes Saurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers, Redcliffa, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday IP Reguiation, schedule 2, table 3, item 4 State Planning Poly 2/02 Planning and Managing Development mvolving Acid Sulfate Soils, section 3.6 "EASEMENTS ‘AND SUBSTATIONS 4.1.3 Is any of the proposed operational work for filling or excavation? XX No LJ Yes IP Regulation, schedule 2, table 3 item 10(a) JP Rogutation, schedule 2, table 3. tem 10(b) 4.1.4 ts any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act? 1 No (1 Yes IP Regulation, schedule 2, table 4, tem 17 Pustic IC PASSENGER ER TRANSPORT ne wg — 4 4.1.5 Is any of the proposed operational work ‘isted i in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the specified threshold? KK) No (11 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency. IP Regulation, schede 2, table 3, item 14 FRAILWAY SAFETY AND EFFICENCY | os 4 16 Is any of the proposed | operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the specified threshold? —) No (1 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency. HP Regulation schedite 7, lable 3, em 1s JKOALA CONSERVATION ed 4.1.7 Is any part of the premises in a a koala conservation area or koala sustainability area? [I No C) Yes IP Regulation scheduie 2, lable 3, tem 19
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
no) RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industria! {
development for the purposes of the Wi'd Rivers Act 2005, currently no declarations for any of the wid river areas apply the Witd Rivers
‘code fo that type of development.
‘ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
"AREA
‘ - a _ -
4.2 Is any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?
XX No
(1 Yes
IPA, scheduie & part 1, table 4, tem 2
JP Regulation schedule J. part 2 table 5, tem 1{c}
Wild Rivers code (Note: the code does not currently cet! sn apphaebe provisions for residential, industaal of commercial devclopmunt inside a designated urban
area)
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER A AREA
43 Is any of the , proposed operational work for the clearing of native vegetation to which the Vegetation n Management / Act 19 1999
applies?
1 No
(] Yes
IPA, scheduie 8, part 1 table 4, tems TAG
IP Regulation, schedule 2, table: 2, stem 5 (vegetation clearing)
IP Regulation schedote 2. table 2, tem 34 (koala conservation)
IP Regulation, schedule 1, part 3, table 4, dem (vegetation cleangiwild ver ate a)
Vegetation Management Act 1999, section 22A (vegetation clearing/wild river area)
Wild Rivets Art 2005 sections 31+ and 43A
[TaKins oF ORINTERFERING WITH WATER; WILD RIVERAREA = oO 4]
44 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a
watercourse, lake or spring (other than under the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a
watercourse?
i] No
[1 Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency
IPA, shudute 8 part 1, table 4. lems 3fa)
P Regulation schecuie 2 labie 2, tem 8
1? Regulation. schedule 1. patt 3. fable 4 tems 3 and 3A
Water Act 2000 section Q66A4 (wild river are.)
Wed Rivers Act 2005 section 434
45 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?
No
oO Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 3{b)
IP Regulation, scheduic 2 table 2, tem 8
JP Regulston schetiie 1 part 3 tebie 4. dem 5
Wed Rivers code (Note the cude does not currently contain appiicable provisions for faking or interfering ath artesian water)
46 Is any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?
—X] No
([]_ Yes - Answer (a) and (b) below
IPA, schedule 8. part 1, table 4. tem 3{c)i)
IP Regulation schedule 2. table 2. item 8
IP Regulation scheduie 1. part 3, table 4. tem 3
Water Act 2900, section 966A {wld nver iwea)
Wild Rivers Act 2005. section 43A
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
47 |s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
IK] No
{] Yes
IPA schedure 8 putt T table 4 dem set yay
IP Regviatior: ~hi du’ 2 table 7 tem
IP Regulaina: obs 7 putt? bere 4 tem 3
Water At Q0UL hon Sap (aad nye arratNet.. te cuted Yd Rover dec trident hes laeryg
Wild River cece (Note. the code does net currently contain. appl able provisions for sub artesian aater)
BT sober tah Lal 9 aye yey
48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
DJ No
(1 Yes - Answer both (a) and (b) below
IPA, schedule 8, part 1, table 4, items 3{c)(s) and 3{a}
IP Requianion, schedu'e 2, table 2, tem 9
IP Requiation, schedule 1, part 3, table 4, tem 3A
Water Act 2000. section 966B (wild river area)
49 Is the proposed operational work for the following? :
« For the constriction of a referable dam as defined under the Water Act 2000 {) No OO Yes
@ ¢ To increase the storage capacity of a referable dam by more than 10% {& No CO Yes
if yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 4
IP Regulation, schedule 2, table 2, item 10
TIDAL WORK; WILD RIVER AREA
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No
[1 Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, tem 5
IP Regulation, schedule 2, table 2, tems 12, 14 and 17
IP Regulation, schedule 1, part 3, table 4, tems 4A and 5
Coastal Proteckon and Management Act 1995 section 104A (wild river area}
‘COASTAL MAN TAL MANAGEMENT T DISTRICT; ; WILD RI RIVER ‘AREA — en 7
414 Is any of the operational work proposed to be carried out st within a coastal management district?
@ — No
oO Yes
IPA. schedule 8 pert} tabie 4 em 5
IP Reguiation, schedule 2, tabie 2 items 12 and 14
IP Regulation, schedule 1, part 3. table 4, tems 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section T04A (ard mvet ated)
Wild Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; ‘WILD RIVER AREA —~ — eee 7
4.12 Is any of the proposed operational work for constructing or raising waterway barter works under the Fisheries Act 19947
J No
(1 Yes
IPA. schedue & port) table d. deme
IPA, schedule 8 part 2, tabie 4, tem 2
iP Regulation. schedule 2, table 2 tem 28
IP Reguiation, schedule 1, part 3, table 4 ten: &
Fisheries Act 1994. section 76D (wud river atta)
Wild Rivers Act 2005, section 43A
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 DECLARED FISH HABITAT AREA; WILD RIVER AREA 4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the Fisheries Act 1994? a) (1 Yes PA steter spat ttabed onm 7 IPA schedu'e b, part 2. ahie 4 item 3 IP Reyu'ation sw hedule 2 fable 2 tem 75 IP Regu ation +chedule part § lane 4 tom 7 Wid Rivers Act 2005 sectuns 43A Eishones Act sec hon F8DC yaad pvet atedi 444 Is any of the proposed operational work removing, destroying or + damaging marine plants under the Fisheries Act 1994? > No 1 Yes IPA schedu'e 8. part 1 table 4 tem & IPA. schedute 8, part 2. table 4. lem 4 IP Reguiation, schedule 2, table 2, tem 29 IP Reqguiation, schedule 1, part 3, tabie 4, tem 8 Fisheries Act 1994, section 76DA (wid river area) Wild Rivers Act 2005, section 43A WILD RIVER AREA - fe ee nee en Sty 4.15 Is any ofthe operational w work ok proposed to be carried out in a wild river area declared under the Wild River Act ct 2005? —X} No (1 Yes IPA, schedute 8, past 1 tabie 4. tem 10 IP Regulation, schedule 2, table 2, tem 37 Witla Rivers Act 2005, sections 42, 43A ‘STATE- CONTROLLED ROAD 4.16 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controled road? [—K} No OO Yes IP Regulation, schedule 2, table 2, em 3 Disclaimer: While the Department of Local Government, Planning, Sport and Recreation (DLGPSR) believes that this information contained on this form and provided as part of this process will be of assistance to you, itis provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DLGPSR expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your Teliance on this process and the information contained on this form Proposal ID Click here to submit your DA
Page 15
b-Ec/80
Sea pap
tt
LNOAV1
0080) woow | ome {a ONINVYS
L/ NMOHS SY 2X oo)
00% SYSHLO AS | | i
B3OVYOLS LVOS = - -- =
oooe saevrnaaa NOLHSY 6 NVild ALIS oaaoven 36 01 rc GasOdOud 8 8 ‘8 ' 8
aiva naywa ALLS? ONLI ——*t_ t 3 ~ ~ :
| a an
ywurur spowae Ul wwS | g
TLLLOOWS £0 X84 LELLBPYS 10 Udi = HON ALNNOO Aur '
902 199 Od | emery wowed ZW V@A3M HSIeivd Jasod0ud mt B 8 3
AR] OL, 91 OG Z9BE8EdY 4 Ste > $370d GMH Se x x!
esseuilug ubjeod WN | poeoans £09 107 GSLWSUL NIN 002 © XG, Fa
ZLB EST O10 NOW NT wowanioeaa tap} ‘$31ld - . —
i o
uspJON UYyOor fF |
W/L GL Ald SNIWEVY ao
SYalVM VSOON ON3 HOVa SM3HOS 133.8 te ; §
AVNOD AVSHLSVAW SS3INIVLS OML HLM
LZ°ON SYaudvad O1 daxi4 ,
GMH ¥14 SZL x 8
€09 LO] ‘ONIXOZO A +—
ALL3Sr GaSOd0¥ud '
Yaar t
79062 L190 z z
OZBLCL BOWO SEEN cweoon '
OOVEYLYS LO Bid = OBZ 0 Od z z 3 * x ¥
982 960 680 99 NEV a a
OzLs24 On eouwor ; zoe ; oluavs JUXaLOZO
GALVIOOSSY ONY DNIHOLId
SYsqing £09 107 3NOLS 4O YW31O 38 O1 ST id
ALLS VSOON 1
gv ONIOVeLL
au I-3id g
| ANONNOG ALEdOdd /
ZL <= a a
| ey) ‘TIVUAAO 0051 | | neva amen
09) =o —
i]
@ NOILVAS13 ”
é - L NOILWAA13
b ene 5
g AVND GV3HLSYW
— ae /
Pp 209, rn 3009 ONMid - 6S1Z Sv HLIM
JONVGYOOOV Ni G3TTWiSNI 38 TIVHS S31id Tv a
4 ‘9 GQUVZVH O1 GSLVaeL GN
GOOMOUVH GaAA0NddY 38 TIVHS S31ld Ty
/ ONIHOD Ud BNOLS ‘Sad
\ , , , ~~ GHV 90 Ta MALLY AINNININ
GH 0°: “Ta GHv OF Ta
#0aG : = +— ORV OT TS OHV OT Td 4936
(nnrunend 3018 3NO 01 | | TIVM 40 dOL TIVM 40 dOL
GHV 00°2 Td 13A37 00013 G3GHOOSY WANIXVA
Page 16
SECTION’ A)
” QT
JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec
3% HwOo
1775 xNot4 TYPE 17
st. STEEL
SCREWS @ 460 CRS
PILES:
@ 200 H6 MARINE HWD POLES
NOTE THAT ALL POLES TO COMPLY
WITH AS 2159 - PILING CODE
180 x 75 HWD
2M16SS
18) x76 HWO ————
DETAIL ( 3 \
NOTES:
4. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.
2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS.”
3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.
| IN An 010 263 877
Structural | Civil Design Engineers
J. JETTER
PROPOSED JETTY
LOT 603
No.27
MASTHEAD QUAY
NOOSA WATERS
RABRINK PTY LTD T/A
John Norden
& Associates
Suite 16 Tewentin Plazes"
& Poinciana Avenue | PO Box 206
Tewartin Q 4086
=
Ph: 07 54407137 Fax 07 54407172
Emalt. [email protected]
Page 17
cs ‘LAND USE SECTION FEES
wow BLO | 7
RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme’‘Documentation —~ . 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES:
: Material Change of Use - Code/Impact ;
Consistent 524
Inconsistent §21
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit . , 521
: Extension of a Currency Period : 521
Operational Works - Landscaping . ‘§21
e@ Bldg Work assessable against the Planning Scheme §21
PRE LODGEMENT REVIEW
Half Hour © 522
One Hour §22
ADVERTISING
‘ Purchase Advertised Applications 523
JETTIES
Jetty Application Fee [3.92 524
Jetty Bond sco _ §1
(Category 4)
BONDS :
Performance Bond . . . 51
: (Category 9)
SIGNS .
Registration Fee . : oo 222
g... FEE . / : .
Search of Land Use Section file 112
Liquor Licensing Request 113 .
TOTAL $ | SOO
NAME: He MW Seeter..
ADDRESS: 23 Nhastheac? Qrai,
NOES Views ysee ~)
FILE NO: orf 2974 DATE: _ (8/2/08
RECEIPTNO: | 37 Boe: Signature of TP Officer: (7) {rcs
AUTHORITY NO: Vf
I] 2e08/ 274/
Used in these records
08/0274 - Operational Works - Transport Type 5 - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 793 KB (small file)
- File type
No other editions are linked here.