Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

08/0274 - Operational Works - Transport Type 5 - Jetty [As Published] · 142008.274

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

JPA sehedte A pat? labh + sem 7
PReyulatan y rue? bbe c tem")
Deane Secue dbs £anrecs ty. corea)

Water Act 2000 section 9660
Wild Rreets Act 2008 sechen 43A

"ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

[I] No
CL) Yes

IPA schedule &. part 1 tab. 2 tem 1

IPA schedide 6, pad Tiaba a tems Zand 4

IP Regulation, schedule 2, table 2, dems T und 23

Environmental Protection Act 1994, section 73AA (wild river area)
Wid Rivers Act 2005, section 43A

 

[WITHIN THE LIMITS OF A PORT eee
14 \s any part of the premises within the limits of a port under the Transport infrastructure Act 1994?

XX] No

OO Yes

JP Regulation, schedule 2, table 2, tems 15 and 16

DECLARED FISH HABITAT AREA a : 4]

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

—X} No

[11 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation schedute 2 table 2. Hem 26

‘COMMUNITY INFRASTRUCTURE °

 

1.6 Is any part of the premises designated for community infrastructure?

No
{] Yes

IP Regulatinn, schedule 2, table 3 item 7

WASTE WATER MANAGEMENT Ce - - a : ~
17 Does the proposal involve the establishment or expansion n of a waste water disposal system?

XJ No

L] Yes

IP Regulation. schedule 2, tatle 3, tem $

 

 

 

 

IS ue : ae Mog Section 4 must be completed when the applicaton seeks approval to carry out operational work.

  

PLANNING SCHEME

 

 

41 Is any of the proposed operational work assessable under a planning scheme?
[1] No- Goto Question 4.2 below
kK) Yes - Complete Part E of DAS Application Fo Form 7 and Questions 4.1.7 - 4.1.8 below

‘STATE: CONTROLLED ) ROAD

- |

4.1.1 Is any part of the premises within 100m of a State-controlled toad, or part of a future State-controlled road?

[x] No
(I Yes

Used in these records

About this file

File size
793 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0274 - Operational Works - Transport Type 5 - Jetty [As Published].pdf · 793 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.