Skip to the record
Noosa’s premier civic archive.

Council archive · source document

08/0274 - Operational Works - Transport Type 5 - Jetty [As Published] · 142008.274

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
47 |s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

IK] No
{] Yes

IPA schedure 8 putt T table 4 dem set yay

IP Regviatior: ~hi du’ 2 table 7 tem

IP Regulaina: obs 7 putt? bere 4 tem 3

Water At Q0UL hon Sap (aad nye arratNet.. te cuted Yd Rover dec trident hes laeryg
Wild River cece (Note. the code does net currently contain. appl able provisions for sub artesian aater)

 

BT sober tah Lal 9 aye yey

     

48 Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?

DJ No

(1 Yes - Answer both (a) and (b) below

IPA, schedule 8, part 1, table 4, items 3{c)(s) and 3{a}
IP Requianion, schedu'e 2, table 2, tem 9

IP Requiation, schedule 1, part 3, table 4, tem 3A
Water Act 2000. section 966B (wild river area)

49 Is the proposed operational work for the following? :
« For the constriction of a referable dam as defined under the Water Act 2000 {) No OO Yes
@ ¢ To increase the storage capacity of a referable dam by more than 10% {& No CO Yes

if yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 4
IP Regulation, schedule 2, table 2, item 10

 

TIDAL WORK; WILD RIVER AREA

4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No

[1 Yes - Answer (a) and (b) below

IPA, schedule 8, part 1, table 4, tem 5

IP Regulation, schedule 2, table 2, tems 12, 14 and 17

IP Regulation, schedule 1, part 3, table 4, tems 4A and 5

Coastal Proteckon and Management Act 1995 section 104A (wild river area}

‘COASTAL MAN TAL MANAGEMENT T DISTRICT; ; WILD RI RIVER ‘AREA — en 7

414 Is any of the operational work proposed to be carried out st within a coastal management district?

@ — No
oO Yes

IPA. schedule 8 pert} tabie 4 em 5

IP Reguiation, schedule 2, tabie 2 items 12 and 14

IP Regulation, schedule 1, part 3. table 4, tems 4A and 5

Coastal Protection and Management Act 1995 Act 1995, section T04A (ard mvet ated)
Wild Rivers Act 2005, section 43A

 

 

WATERWAY BARRIER WORKS; ‘WILD RIVER AREA —~ — eee 7

 

4.12 Is any of the proposed operational work for constructing or raising waterway barter works under the Fisheries Act 19947

J No

(1 Yes

IPA. schedue & port) table d. deme

IPA, schedule 8 part 2, tabie 4, tem 2

iP Regulation. schedule 2, table 2 tem 28

IP Reguiation, schedule 1, part 3, table 4 ten: &

Fisheries Act 1994. section 76D (wud river atta)
Wild Rivers Act 2005, section 43A

   

Used in these records

About this file

File size
793 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0274 - Operational Works - Transport Type 5 - Jetty [As Published].pdf · 793 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.