Council archive · source document
08/0274 - Operational Works - Transport Type 5 - Jetty [As Published] · 142008.274
Building &/or operational works assessable against a planning scheme Nature of the works 1. Is the application seeking approval of building work assessable against the local government planning scheme? KK) No LI Yes 2. |s the application seeking approval of operational work assessable against a planning scheme? @ (No Yes 2(a)_ Is the application seeking approval for more that one type of operational work? EX] No- Complete Table B (1 Yes - Complete a new Table 8 for each type of operational work Table B (i) Whatis the nature of the operational work? (CJ Roadworks (LJ Stormwater [| Water infrastructure (-] Sewerage infrastructure (7 Landscaping (7) Clearing vegetation under the planning scheme (-] Earthworks (7 Drainage Works [X] Other - Specify below New timber jetty (ii) Is the application for operational work involving the creation of new lots? —X] No @ (2 Yes - Specify number below (iii) What type of approval is being sought? (L) Preliminary approval [X] Development Permit (iv) Is there a current Preliminary Approval for this operational work on the premises? 1] No (1 Yes - Complete Table Ba) (v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development? EJ No (7 Yes - Complete Table B(b) ‘Mandatory information 3. Confirm that the following mandatory information accompanies this application Confirmation of lodgement Method of lodgement IPians showino the nature and location of the oranosed works finchutina the extent of any ext and Fil: S21 Confirmed over the counter
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0274 - Operational Works - Transport Type 5 - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 793 KB (small file)
- File type
No other editions are linked here.