Original source · versioned page text
Amended DA Form 1
Intended use of parts created Residential Commercial Industrial Other, please specify:
Number of parts created
Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)
Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
[1] Road work
(J Drainage work
(J Landscaping
Other — please specify:
CJ Stormwater (2 Water infrastructure
CL] Earthworks C Sewage infrastructure
LJ Signage : C1 Clearing vegetation
C1 Yes — specify number of new lots:
LINo
$
PART 4 — ASSESSMENT MANAGER DETAILS
(1 Yes — a copy of the decision notice is attached to this development application
L] The local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached
[I No
PART 5 — REFERRAL DETAILS
ee ee eee
Page 5
DA Form 1 — Development application details
Version 1.2— 7 February 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.