Original source · versioned page text
4HRP3983.L01.004 - Final Application
Attached to the e-mail Ent & Dining Bus Type 2 - Recreation, Amusement &Fitness - MCU17/0555.
Driveways and Carparking Code
Table 14.49 Driveways
Specific Outcome Probable Solution Response
14.112 General
O1 Vehicular access does not adversely S1.1 Vehicular access is located and designed in Complies
impact on safety, capacity and accordance withAS/NZS2890.1:2004; No changes to existing access arrangements and driveways
operations of the existing or planned AND are proposed.
road network, the proposed driveway,
cycleways or pedestrian pathway S1.2 Only one footpath crossing is provided26;
systems. AND
S1.3 Driveways, have a maximum grade in accordance
with Council’s standard requirements.
O2 Driveways and crossovers— S2.1 Design of the driveway across the footpath is in Complies
a) are suitable and safe for their accordance with Council’s Standard Drawing No changes to existing access arrangements and driveways
intended use; and requirements as appropriate for the particular type of are proposed.
development as annotated on the drawings; AND
b) match Council infrastructure.
S2.2 Driveways are designed and constructed in
accordance with Council Standard Drawing
requirements , as appropriate for the particular type of
development as annotated on the drawings; AND
S2.3 The change in grades in the driveways and ramps is
in accordance with Council’s Standard Drawing
requirements
O3 In commercial zoned areas, the S3.1 Design of multi-tenanted developments in commercial Complies
number of driveways across zoned areas include shared driveways and parking No changes to existing access arrangements and driveways
pedestrian footpaths is minimised. areas; are proposed.
AND
S3.2 Driveways are located so they abut existing driveways
of adjoining development where practicable and
reciprocal easements are created to reduce the
sealed driveway width.
O4 Vehicular access does not adversely S4.1 Footpath and kerb crossings are located clear of Complies
impact on the capacity, operations and existing stormwater inlet structures, water and No changes to existing access arrangements and driveways
maintenance of the existing sewerage infrastructure fittings, any other exiting are proposed.
infrastructure; utility infrastructure, existing landscaping and
vegetation.
November 2017 Cardno A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.