Council archive · source document
08/0169 - MCU - Dwelling House To Be Assessed Against the Superseded Planning Scheme [As Published] · 132008.169
INTEGRATED PLANNING ACT 197 Part A, Version 3.0, 3 September 2007 Advice for completing Part A General advice Act 1975 only. © — Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’. The assessment manger may refuse to receive an application that is not properly made. « — Completion of Part A of Form 1 is required for all development applications, Other mandatory requirements, applicable to certain types of applications, are stated in other Parts of Form 1. « The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building « — For further information about completing this form go to IDAS Guide 1 (Making and IDAS application) ai The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common. Lot on plan details can be obtained from title documents or through the local government. The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA) only. Instead complete Q1(a). StrategicPortLand is within a local government area but a local government's planning scheme does nat apply on Strategic Port Land. StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. Q2 Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided. Q3 A single development application may involve land both within and outside waters. A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to which high spring tide ordinarily flows and reflows (unless a regulation has declared a limit for the watercourse). Generally, a watercourse is in the jurisdiction of the Department of Natural Resources and Water. “Tidal water’ is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the tidal area for a local goverment, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work). Qg The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the Form 4 Application Form (including this Part and any other relevant Part) is correct. If the applicant is a company or organisation, a contact person must be nominated. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application. Q10 Section 3.2,1(5) of the (PA requires evidence of resource entitlement be given for applications involving a prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence.. Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark. In the case of applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the request for resource entitlement. In the case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 - MCU - Dwelling House To Be Assessed Against the Superseded Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.