Council archive · source document
Attachment 9 - Previous Vegetation Clearing approval · MCU18/0015
Attached to the e-mail Response to Information Request (Bushfire Report, Arborist Report, Previous Vegetation Clearing Approval & Registered Plan for Adjoining Viridian Covenant Area ) MCU18/0015 & RAL18/0001.
NRW ~ Decision Notice 2007/008064 . Findings relevant to the decision In consideration of the evidence, the following findings were made that lead to the application. of conditions to the approval.- Assessment against Part P of the Regional Vegetation Management Code: Southeast Queensland Bioregion, 20 November 2006. PR P.3: Watercourses Findings = The Application is proposing to clear assessable vegetation within 10 metres ofan order 1 stream due to the location of a proposed road. The application ——_---_-_~-dees not neet-the acceptable selution (AS), « The application has proposed to protect bank stability against bank erosion, maintain water quality aad aquatic habitat through measures as outlined on plan ‘Soil erosion, contro! plan and details’ 07B217-sk1.P1. dated Aug 2007. = To ensure compliance with the performance requirement (PR), appropriate conditions have been applied to the permit. PR P.4: Connectivity Findings " The Application is proposing to clear less thatr 2ha of assessable vegetation, but will reduce the width of remnant vegetation to Less than 100 metres and will occur where the width of remnant vegetation is less than 100 metres, The application does not meet the AS. = Despite the clearing of assessable vegetation proposed in this application, a vegetated corridor of approximately 36 - 50 metres (18 - 30 metres within the property) is proposed to be retained to enable connection between vegetated areas on adjoining properties. This corridor includes vegetation ont the adjoining undeveloped road reserve ie Edgar I Bennet Avenue, This Toad This corridor has been required t to be retained a as ‘part of the Ministerial decision notice. = The application proposes that despite the clearing, a corridor of remnant Scape and Will Tetiain as remnant vegetation through the implementation of an Environment Management Plan, Ecological Restoration Plan, Fauna Management Plan and Fire Management Plan. Adherence to these plans has been conditioned into the existing development approval dated 6 March 2006. ~ * To ensure compliance with the performance requirement (PR), appropriate conditions have been applied to the permit. PR P.5: Soil erosion Findings Page 9 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 9 - Previous Vegetation Clearing approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.