Council archive · source document
132007.1010.2 Request to extend the existing approval
SCRC CORRESPONDENCE
Mr Michael Cantori
u 1 r II
B0365525
Development Compliance Officer
Sunshine Coast Regional Council
Locked bag 72
Sunshine Coast Mail Centre Qld 4560
atepnen mou
Principal
20 Duke Street
-;2 C)OT 1 (0 10 (-z Sunshine Beach QLD 456
F- 9 nq (k 3(1 Postal address
PO Box 262
Noosa Heads OLD 4567
Telephone 07 5447 5633
Facsimile 07 5447 5833
[email protected]
www iuunr.a,com.au
Dear Sir 9th May 2011
Proposed Duplex 18 Kingfisher Drive Peregian beach
D/A 2007/1010
Further to your letter 15 April 2011...We have been instructed by our client to lodge the attached
"Request to extend the existing approval "together with cheque for $660.00...The request to extend
the existing approval is due to the current economic downturn of the property market, which is
evident across the sunshine coast and south Eastern Queensland...
We would further request that this development approval be extended for a further 4 year period
Yours Faithfully
,nt Count
i9 er
MA r 2077
chydd,
S.T.Kidd
Principal 1A/60X: ela n Ass irc
^x 1a^^
Ec s : Pla terial CAay Kidd + Co Designers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Sunshine Coast Request to Change Existing Approval and/or
(;oLlncll
Extension to Relevant Period
NOTES: Wlj(ch entity issued the approval?
ALL questions MUST be completed unless the form indicates Sunshine Coast Regional Council
otherwise. Other entity - please specify:
This form must be submitted to Council accompanied by the
Is the approval for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on the form. No
If Council was the Assessment Manager for the existing approval, Yes - complete below
and the approval was issued by the Court, then:-
Insert the name of each local government area in which the
(a) a request to change the development approval and/or mobile and temporary ERA is proposed to
conditions is made to the Court; and
operate/operating.
(b) a request to extend the relevant period for the approval is
made to Council.
All terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. 3. Nature of request
Please tick ALL applicable categories
C Details of the person making the request
To change the development approval
Full name - individual or company To change the development conditions
j/f- ro extend the relevant period before lapsing
i^Z rril.t17
Contact name -for company Please attach documentation outlining the details of
and the reasons and justification for the requested
change or extension.
Postal address
4. Location of the premises
)x 9$ 5
Street address
Postcode Unit no. Street no. Street nam
Contact phone number Fax number - if applicable
Suburb
lti5 Postcode
1 !C. CSC
e,3 I at-_
Mobile number - if applicable
Lot and plan description
Lot no. Plan type & plan no.
E-mail address - if applicable
loci a c
2. Details of the existing approval
Type of approval - please tick ALL applicable categories
Develo p ment P e rmit
Preliminary Approval 5. Concurrence Agencies
Compliance Permit Was there one or more concurrence agencies involved in
Material Change of Use the original approval?
Reconfiguring a Lot 71 No
Operational Works Yes - provide details below
Building Works Note - Under s372 of the Sustainable Planning Act 2009 the person
Plumbing or Drainage Works making the request is required to give a copy of this request to all
concurrence agencies.
Compliance Certificate
Environmentally Relevant Activity (ERA) Concurrence Agency Date copy given
Application number Date issued
PD-DA-FM401/1-30/04/2010 Page 1 of 2
Page 3
6. Pre-request response notice 8. Does the request involve a State resource
prescribed under the Sustainable Planning
Has a pre-request response notice been given by a relevant
Regulation 2009, Schedule 14?
enoty (e.g. a concurrence agency) for this request?
No No
Yes Yes - complete Table C below
If yes, please attach a copy of the notice.
Table C - State owned resource
Nature of State owned resource
Owner's consent
Is t)ae owner's consent required for this request?
No Nature of evidence required
Yes - complete either Table A or Table B below Evidence of allocation of /entitlement to, the resource
Note - If more than one owner of the land all owners' details are Evidence the chief executive has agreed to the request
required.
Attach a copy of the evidence required above.
Table A - owner's consent provided on form
Owner's name/s e h { L^ NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires
I/We, the above-mentioned owner/s of the land, consent to that if an application for the development approval were made at
the making of this request. the time of making this request and evidence under section 264(1) of
Signature/s the Sustainable Planning Act 2009 would be required to support the
application, this request must be accompanied by the written
Date agreement of the chief executive from whom evidence would be
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a
development involves a State resource, a regulation may require the
Table B - owner's consent attached application to be supported by certain evidence prescribed under
Owner's name/s regulation. Schedule 14 of the Sustainable Planning Regulation 2009
prescribes the State resources for which evidence is required to be
given, and the evidence required, to support the application.
The owner's written consent is attached.
9. Applicant's declaration
NOTES: For question 7
Under section 371 of the Sustainable Planning Act 2009, if the
person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's
consent.
However, owner's consent is not required if the approval:
By knaling this request, I declare that all information in this
• relates to land the was acquisition land to which section
263(2)(d) of the Sustainable Planning Act 2009 applied when requ t is true and correct.
the application for the approval was made; or
• is for building work or operational work for the supply of
community infrastructure on land designated for the
community infrastructure; or
• the consent of the owner would not be required under section
263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner's consent is not required if the Assessment Manager is
satisfied that:
• the number of owners of the land make it impractical to obtain
owners' consent, and the requested change does not materially
affect the owners' land; or
• having regard to the nature of the proposed change, the owner
has unreasonably withheld consent and the requested change
does not materially affect the owner's land.
PD-DA-FM401/1-30/04/2010 Page 2 of 2
Used in these records
132007.1010.2 Request to extend the existing approvalRelated documentApplication case desk ↗
About this file
- File size
- 639 KB (small file)
- File type
No other editions are linked here.