Original source · versioned page text
34 Elm St - Traffic Assessment - Rev C
Attached to the e-mail MCU18/0158 - 34 Elm St - revised traffic assessment report.
34 Elm St, Cooroy changing shopping habits this later 2018 survey at Eli Waters is considered to be a more accurate representation than the earlier 2007 surveys. Despite this site being larger than the proposed development on Opal St, 360 Civil Consulting consider the Eli Waters site an acceptable comparison site for determining the percentage of commercial vehicles that are likely to access the development The total daily vehicle count for the 7 day count at the Eli Waters Shopping centre was 7,325 vpd (vehicles per day). The RTA guide to Traffic Generating Developments estimates that a shopping centre with a GLFA of 6,074m2 is anticipated to generate 121vpd per 100m2 of GLFA. This would equate to an anticipated traffic generation of 7,350 vpd. The difference between the measured traffic count and the anticipated traffic count is less than 1% and hence it has been assumed that this site is typical of the expected vehicles. The percentage of Class 3 or Class 4 – 13 vehicles to the Eli Waters Shopping centre is 1% of all vehicles. Based on the RTA Guide to Traffic Generating Developments, the estimated total number of vehicles to be generated by the development based on 658m2 of GLFA is 796 vpd. From comparisons with Eli Waters Shopping centre, it is expected that 1% of these vehicles will be commercial vehicles. Hence, it is expected that 8 vehicle movements per day will occur by a commercial vehicle. Four of these movements will be entering the site via Opal St and 4 movements will be exiting the site via Diamond Lane. As previously discussed, Cooroy Motel generated approximately 36 vpd to Diamond Lane, the proposed development will generate 4 vpd to Diamond Lane. As such, the proposed development will decrease the amount of traffic to the Diamond Lane / Elm St intersection by approximately 32 vehicle movements per day. This reduction in vehicle movements at the Diamond Lane / Elm St intersection, alongside the removal of the Cooroy Motel’s non-complaint access to Diamond Lane, will improve the safety and functionality of the Diamond Lane / Elm St intersection. 3.3 Diamond Lane Exit It is proposed that the Diamond Lane access will be an exit left only for commercial vehicles. This will minimise any adverse impact that commercial vehicles will have on any Diamond Lane properties that are east of the development. To ensure that the access is exit only, a boom gate is proposed to be located at the exit. This boom gate will have a control button in each of the shops and will be used by shop staff to allow commercial vehicles to exit. To ensure that the commercial vehicles exit to the left, it is proposed that a build out is constructed at the north eastern boundary directing traffic left towards Elm St. The exact set out details of this proposed build out will be completed as part of the Operational Works Application. 3.4 Impacts on Diamond Lane As detailed previously, Diamond Lane is approximately 210m in length and typically has a pavement width of approximately 3.5m. The lane allows two-way traffic however has insufficient room for vehicles to pass and does not contain formalised passing bays. 360 Civil Consulting - Traffic Assessment Page 10 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.