Skip to the record
Every meeting, every word.

Original source · versioned page text

Operational Plan 2019-2020

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
         THEME 4: LONG TERM PLANNING FOR NOOSA SHIRE

                “Noosa Shire is well managed and sustainable”



No.   Project                                                          Responsibility

1     Finalise Climate Change Adaptation Plan and initiate             Director Environment &
      implementation of actions                                        Sustainable Development

2     Implementation of Noosa Transport Strategy priority actions as   Director Infrastructure
      determined by Council                                            Services

3     Investigate options for the future use of the former Tewantin    Director Corporate
      TAFE site                                                        Services

4     Establish a Placemaking Team and commence pilot project          Director Environment &
                                                                       Sustainable Development

5     Finalise adoption of the new Noosa Planning Scheme               Director Environment &
                                                                       Sustainable Development

6     Finalise cycleways and pathways studies to identify missing      Director Infrastructure
      links                                                            Services

7     Continue implementation of Council’s Revenue Diversification      Director Corporate
      Project                                                          Services

8     Finalise the Noosa Spit Shoreline Erosion Management             Director Infrastructure
      Plan (SEMP) and develop an action plan to prioritise any         Services
      recommendations arising from the SEMP




                                                                       Noosa Council | Operational Plan | Page 10
Log in to download the original file

Operational Plan 2019-2020(PDF, 864KB).pdf · 884 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.