Operational Plan 2019-2020
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn THEME 2: THE NOOSA COMMUNITY
“Our community is connected, safe and happy and
able to meet their potential”
No. Project Responsibility
1 Continue implementation of Council’s Social Strategy including Director Community
the Cultural Plan, Sport and Active Recreation Plan and Health Services
and Wellbeing Plan
2 Undertake pre-feasibility study for a Regional Art Gallery Director Community
Services
3 Complete a major refurbishment of the Noosa Aquatic Centre Community Facilities
Manager
4 Commence construction of the new Peregian Beach Director Community
Community House Services
5 Complete Stage 1 of the Noosa North Shore Campground Director Corporate
redevelopment Services
6 Review options for mobile/ outreach library services Libraries & Galleries
Manager
7 Adoption of Master Plans for the Noosa District Sports Complex Community Development
and the Cooroy Sports Complex Manager
8 Complete replacement of the Noosa Botanic Gardens Shade Director Infrastructure
House Services
Noosa Council | Operational Plan | Page 8