Council archive · source document
Delegated Report - Code - Planning MCU19 0055 · MCU19/0055
Author Development Planner, Glen Conforti Development Assessment APPLICATION DETAILS Application No. MCU19/0055 Applicant Andrew Ross Pannifex Proposal Material Change of Use - Multiple Housing - Type 2 Duplex Properly Made Date 17 May 2019 Information Request Date 14 June 2019 Information Response Date 4 July 2019 Decision Due Date 8 August 2019 Report Completed Date 15 August 2019 Number of Submissions Not Applicable PROPERTY DETAILS Property Address 27 Hill St Sunshine Beach Qld 4567 RP Description Lot 93 RP 94566 Land Area 506m² Existing Use of Land Dwelling House STATUTORY DETAILS SEQRP Designation Urban Footprint Locality Eastern Beaches Zone Semi-Attached Housing Overlays N/A Assessment Type Code PROPOSAL The application seeks approval for a Material Change of Use - Multiple Housing - Type 2 Duplex and operational Works for driveway, road work, landscaping, stormwater and earthworks. The proposal seeks approval for a duplex consisting of 2 x 2 bedroom 2 storey units. The access is proposed from both Pacific Avenue and Hill Street. Figures 1,2,3, and 4 provide the floor plans, elevations and 3D perspective. Figure 1 - Ground floor Figure 2 - Upper floor Figure 3 - Pacific Avenue street elevation Figure 4 - 3D perspective site details Site Description The site is located on the corner of Hill Street is generally level with a slight slope to the Hill Street frontage. Two Moreton bay figs are located in the road reserve, one near the western boundary and the other on the corner. Surrounding Land Uses The development surrounding the subject lot consists of a mix of detached housing and multiple dwellings. The older housing stock is gradually being replaced with multiple dwellings. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017 The Noosa Plan. The following codes from the Noosa Plan are applicable to this development: Eastern Beaches Locality Code Residential Uses Code Landscaping Code Engineering Works Codes The subject site is located in the Eastern Beaches Locality and is zoned Semi-Attached Housing. The proposed use is defined as a consistent use within the zone and is required to follow a code assessment application process. The application has been found to generally comply with all applicable statutory instruments. The pertinent issues arising out of the assessment are discussed below: Criteria Planning Scheme Proposal Complies Site Area - 506m² Population density 4.8 persons max 4.8 persons Gross floor area Plot ratio 228 m² max .045:1 max. 228 m² 0.45:1 Site cover 40% max (203m²) 40% (203m²) Landscaped open space Soft landscaping 192 m² min (4.8 x 40²) 115 min 60% of total 212 m² 133m² Building height storeys metres 2 storeys max 8 metres 2 storeys 7.9 metres Boundary setbacks Pacific Ave - Frontage Hill St - Frontage N.W. side S.W. side 6 metres min 6 metres min 1.5 / 2 metres min 1.5 / 2 metres min 6 - 6.1 metres 6.3 – 6.97 metres 2.1 / 2.1metres 1.5 / 2.4 metres Length of wall 15 metres max 11.8 metres Carparking 2 covered min 1 uncovered min 2 covered 1 uncovered The proposal is well articulated, has addressed privacy between the proposed adjoining and neighbouring premises and meets the relevant provisions of the code. However, it should be noted the proposal does not provide landscaping between the carparking/turning areas of Unit A inside the fence. In this instance it is considered acceptable given the small lot size, the extensive frontage (46m approx.) being a corner lot and landscape open space is provided nearby for the users of the premises. draft planning scheme The draft Planning Scheme seeks different provisions to the current Planning Scheme, in that there is no maximum population density, plot ratio is proposed reduced to 0.4:1 rather than 0.45:1 and vehicles are not required to exit in a forward gear onto a local road. Pacific Ave and Hill St, are collector roads which means the proposal is required to exit in a forward gear. The proposal exceeds the plot ratio proposed under the draft Planning Scheme. cONSULTATION Referral Agencies The applicant was referred to the following Referral Agencies: Department of Infrastructure, Local Government and Planning (SARA) The Department is a referral agency for contaminated land (unexploded ordnance) The Department has responded advising that they have no concerns and have provided condition requiring the land to be cleared and remediated of Unexploded Ordnances. Other Referrals The application was forwarded to the following internal Council officers: Engineering Officer conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No MCU19/0055 for a Material Change of Use - Multiple Housing Type 2 - Duplex situated at 27 Hill St Sunshine Beach Qld 4567 and described as Lot 93 RP 94566, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: MCU19/0055 Street address: 27 Hill St Sunshine Beach Qld 4567 Real property description: Lot 93 RP 94566 Planning Scheme: The Noosa Plan (8 June 2018) Decision details Council decided to issue the following type of approval: Development Permit for Material Change of Use for Multiple Housing Type 2 - Duplex CURRENCY PERIOD of approval The currency period for this development approval is stated in Condition 3 of the Assessment Manager Conditions. assessment manager conditions DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE - MCU19/0055 PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date Sheet Number 02 5 Perspectives, prepared by ICON Building Design 30/06/2019 Sheet Number 03 5 Site Plan, prepared by ICON Building Design 30/06/2019 Sheet Number 04 5 Ground Floor, prepared by ICON Building Design 30/06/2019 Sheet Number 05 5 First Floor, prepared by ICON Building Design 30/06/2019 Sheet Number 06 5 Elevations, prepared by ICON Building Design 30/06/2019 Sheet Number 07 5 Elevations, prepared by ICON Building Design 30/06/2019 Sheet 2 Planting Plan, prepared by Studio 8 Concept & Design 25.06.2019 Currency Period The Currency Period for this development approval lapses if the use has not happened by 16 July 2025, unless an application to extend the currency period is approved by Council. Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to arranging of the pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. Building Appearance All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvres, glass panelling or the like, except where required to satisfy any privacy condition of this Decision Notice. Fencing and Walls Any street fencing must be set back as indicated on the approved Ground Floor Plan.IN this regard no fence is to exceed 2m above the NGL. The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Protection of Privacy To ensure privacy is protected between adjoining properties, any windows/openings must not have direct views into the habitable room windows or private open space areas of the adjoining property. Fixed external screens, a minimum sill height of 1.5m and/or translucent glazing can be used to ensure privacy. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. All clauses and by-laws of the proposed Community Management Statement must accord with the requirements of this Decision Notice. ENGINEERING Site Access and Driveways Sealed access driveway/s for entry and exit must be provided to all parking and manoeuvring areas of the development. The works must be undertaken generally in accordance with the approved plans and in compliance with the Operational Works conditions of this permit. Car Parking A minimum of 3 car parking spaces must be provided on the site. The carparking must be provided generally in accordance with the approved plans and in compliance with the Operational Works conditions of this permit. Public Pathway A 2.0m wide pathway must be provided along the property frontages of the site to Hill Street and Pacific Avenue in accordance with the Operational Works conditions of this permit. This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk infrastructure identified by Council’s LGIP to service the development. A 2.1m wide pram ramp must be provided to Pacific Avenue in accordance with Councils Standard Drawings. This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk infrastructure identified by Council’s LGIP to service the development. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken generally in accordance with the Operational Works conditions of this permit. Electricity and Telecommunication Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements Where applicable, all works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All fill, associated retaining walls and foundations must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. LANDSCAPING The development site must be landscaped. The works must be undertaken in accordance with the approved Planting Plan, Councils PSP3 Landscaping Plants and Guidelines and must include: the retention of both existing Ficus macrophyllia located in the road reserve. The lower branches of these 2 species may be pruned and a garden provided around the base of the trees. The under storey plantings may be removed. should the existing callistemon located to the northern side of the Unit B driveway be required to be removed, it must be replaced by 1 x 45 litre native tree species nominated at the pre-start meeting. ENVIRONMENTAL HEALTH Waste Storage The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy 9, Waste Management, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. Noise Written certification is required from a suitably qualified person confirming that sound pressure levels from all mechanical plant and equipment comply with the following: Air-conditioning and Refrigeration 7am to 10pm: Maximum level allowable = background + 5dB(A) 10pm to 7am: Maximum level allowable = background + 3dB(A) Pumps 7am to 7pm: Maximum level allowable = background + 5dB(A) 7pm to 10pm: Maximum level allowable = background + 3dB(A) 10pm to 7am: No audible noise. The certification must be submitted to Council, which certifies that operational noise from any fixed plant and equipment complies with the requirements of this Decision Notice. DEVELOPMENT PERMIT FOR OPERATIONAL WORKS – OPW19/0115 Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 1-02 Job No: 12727 C Crossover & Driveway, prepared by Structures Engineering Design C. Hoger RPEQ (15346) 04/07/2019 1-04 Job No: 12727 C Crossover & Driveway, prepared by Structures Engineering Design C. Hoger RPEQ (15346) 04/07/2019 Sheet 1 – S8-0951LD-B Landscape Plan, prepared by Studio 8 Concept & Design 25.06.2019 Sheet 2 Planting Plan, prepared by Studio 8 Concept & Design 25.06.2019 Sheet 3 Design Elements, prepared by Studio 8 Concept & Design 25.06.2019 Sheet 4 Scope of Works, prepared by Studio 8 Concept & Design 25.06.2019 PRIOR TO COMMENCEMENT OF WORKS Engineering All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting and prior to any works commencing. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a prestart meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the prestart meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased Proposed fencing to the site during the construction phase of the development Adequate parking arrangements for construction workers No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures Works programme identifying key components of the works and their respective durations Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice The relevant conditions of the higher order Material Change of Use approval to which this approval relates All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Any existing kerb & channel and/or concrete footpath sections requiring removal due to the new works must be saw-cut and removed to allow for a smooth and neat finish with the new works. The redundant pathway and pram ramp must be removed. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Pathway and Pram Ramp All pathways must be 2.0m wide minimum constructed generally in accordance with the approved plans, conditions of the MCU approval and the following requirements: All footpath/cycleway must comply with IPWEA standard drawing R-065. All paths must have a slip resistant surface. Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists. The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard. Be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility. The required pram ramp must be constructed in accordance with Noosa Council’s standard drawing SD: 9006 with a minimum width of 2.1m. The proposed pathway must terminate in a manner that ensures smooth transition to existing surfaces for public safety and must be extended beyond the frontage of the site to smoothly match the width and levels of adjoining pathways. Site Access and Driveways Driveway crossovers must be constructed in accordance with Council’s Standard Drawings RS-049 and RS-050 Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. The driveway must be constructed so as not to concentrate stormwater runoff or ponding onto neighbouring properties and/or grassed verge. Underground service conduits for water supply, electricity and any other services shall be provided as part of the access driveway. Where there is an existing or proposed pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path. Have a minimum clearance of 500mm from any Unitywater/Telstra asset, unless a written approval is obtained from Unitywater/ Telstra and submitted to Council. Be located a minimum of 1m clear of any existing power poles and streetlights, unless a written approval is obtained from Energex and submitted to Council. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to the commencement of the use. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows or the creation of additional ponding). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Environment Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). Prior to the commencement of the use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to advisory notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Landscaping The development site must be landscaped. The works must be undertaken in accordance with the approved Landscaping Plans, Councils PSP3 Landscaping Plants and Guidelines and must include: the retention of both existing Ficus macrophyllia located in the road reserve. The lower branches of these 2 trees may be pruned and a garden provided around the base of the trees. The under storey plantings may be removed. should the existing callistemon located to the northern side of the Unit B driveway be required to be removed, it must be replaced by 1 x 45 litre native tree species nominated at the pre-start meeting. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. New street tree plantings must: Meet NATSPEC Guidelines: Specifying Trees requirements for quality. Be pruned in accordance with AS 4373, Pruning of Amenity Trees. Be of the approved plan species. Be pest and disease free. Grassed areas must be: Rolled, top dressed and joined smoothly with adjoining surfaces. Of species sustainable for local and design conditions and do not require irrigation. Free of disease, pest, weeds, rock and debris. Landscaping must be located in a position that will not adversely affect Council infrastructure or access to municipal infrastructure. FOLLOWING CONSTRUCTION / PRIOR TO COMMENCEMENT OF THE USE Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. A final inspection and approval of the proposed works and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection. As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information must include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and; Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: Certification that all works have been undertaken and completed in accordance with the requirements of this Permit. As Constructed details in accordance with Council’s Planning Scheme Policy. Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: A Council inspection reveals works do not comply with approval requirements. Submitted certification wrongly states works comply with approval requirements. referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Contaminated land (Unexploded Ordnance) The agency provided its response on 12 June 2019 (Reference No. 1905-11463 SRA). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection. Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. Sustainability In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes ENVIRONMENTAL HEALTH Building Works Noise from residential building works shall comply with the following: Limited to between 6:30am to 6:30pm Monday to Saturday. All reasonable measures are taken to minimise noise emissions Not permitted on Sunday or public holidays. Measurement of Noise Measurement of sound pressure levels (adjusted for tonality and impulse) must be in accordance with either: Australian Standard AS1055.1 “Acoustics–Description and measurement of environmental noise – General procedures”, or The relevant “Noise Measurement Manual” as provided by the Department of Environment and Heritage Protection. A qualified person is considered to be either: a Registered Professional Engineer of Queensland, or; an environmental consultant with a minimum of 3 years current experience in the field of acoustics. Acoustic Advice & Design It is highly recommended that the developer seek the advice and design input of a qualified acoustic consultant at the plan development stage to ensure the development does not cause a noise nuisance under the Environmental Protection Act 1994. Attention should be given to the following (but not limited to): building design and construction design, selection and installation of fixed plant and equipment he location of air conditioning and heating units, refrigeration plant, pumps, mechanical exhausts and plant rooms etc the use of acoustic enclosures/screens around noisy plant and equipment. operating times. Environmental Protection The development should be undertaken in a manner that causes no unlawful environmental nuisance under the Environmental Protection Act 1994 by the creation of excessive noise, lighting, waste, atmospheric pollutants (including dust or odours) or other releases to the environment. In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint, cement, concrete, builder’s waste or other prescribed contaminants should not to be released to or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. ENGINEERING General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relation to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: best Practice Erosion and Sediment Control, International Erosion Control Association (2008). property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Building Works All Building Work submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 18 of 18 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.png (image text)] Darel ‘208 180) Garage roeing [Entry i lr tt Outdoor Entertainment ‘Sass Gabes Une ete we Or Lana 2 srs i ‘ieee OBIE | PROPOSED GROUND FLOOR PLAN [Attachment: image2.png (image text)] af. 3| Bea al scsi ene 2s se fom aneam 5 1205 shutor wy 1206 ser PROPOSED FIRST FLOOR PLAN [Attachment: image3.png (image text)] aT NORTH ELEVATION [Attachment: image4.png (image text)] lla a <_—— erty
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU19 0055Related documentApplication case desk ↗
About this file
- File size
- 854 KB (small file)
- File type
- DOCX
No other editions are linked here.