Original source · versioned page text
Code Assessment
construction, minimising cut to standard single or double
or fill and avoiding benching storey construction to minimise
of the site. building bulk and benching of the
sites.
Editor's note- refer to Figure
6.9.1A and Figure 6.9.1B
AO23.3 The distance between the Complies with AO23.3
ground level and the lowest part
of the floor of the building does
not exceed 3 metres.
PO24 Filling and excavation for AO24 Filling and excavation for Can comply with AO24
operational works do not directly, operational works is designed and To be addressed at the OPW
indirectly or cumulatively cause constructed to ensure overland stage.
adverse impacts external to the flow and/or flooding is not
development site by: worsened, impeded, or otherwise
1. causing ponding of water on diverted to adversely affect other
the site or nearby land; properties or downstream
environments.
2. increasing flooding, which
adversely affects the safety
or use of any land upstream
or downstream; or
3. adversely affecting the flow
of water in any overland flow
path.
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.