Original source · versioned page text
UPDATED DA - DA Form 2-Building work details
• such disclosure is in accordance with the provisions about public access to documents contained in the Planning
Act 2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and
Planning Regulation 2017; or
• required by other legislation (including the Right to Information Act 2009); or
• otherwise required by law.
This information may be stored in relevant databases. The information collected will be retained as required by the
Public Records Act 2002.
PART 7 – FOR COMPLETION BY THE ASSESSMENT MANAGER – FOR OFFICE
USE ONLY
Date received: Reference numbers:
For completion by the building certifier
Classification(s) of approved building work
Name QBCC Certification Licence QBCC Insurance receipt
number number
Notification of engagement of alternative assessment manager
Prescribed assessment manager
Name of chosen assessment manager
Date chosen assessment manager engaged
Contact number of chosen assessment manager
Relevant licence number(s) of chosen assessment
manager
Additional information required by the local government
Confirm proposed construction materials:
Double brick Steel Curtain glass
External walls Brick veneer Timber Aluminium
Stone/concrete Fibre cement Other
Timber Steel Aluminium
Frame
Other
Floor Concrete Timber Other
Slate/concrete Tiles Fibre cement
Roof covering
Aluminium Steel Other
QLeave notification and payment
Note: For completion by assessment manager if applicable
Description of the work
QLeave project number
Amount paid ($) Date paid (dd/mm/yy)
Date receipted form sighted by assessment manager
Name of officer who sighted the form
Page 6
DA Form 2 – Building work details
Version 1.2— 7 February 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original