                                                                                                                                                                                                                                                                                     WATER
                                                                                                                                                                                                                                                                                     SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                         7. CONSTRUCTION
                                                                                                                                                                                                                                                                                     CONSTRUCTION CODE - REQUIREMENTS OF THE SEWER
                                                                                                                                                                                                                                                                                     STANDARD DRAWINGS FOR SEWERAGE WORKS TO BE ADHERED               COVER ON MAINS FROM PERMANENT LEVEL TO BE AS SHOWN IN
                                                                                                                                                                                                                                                                                     TO AS PER NOTES SUPPLIED.                                        ACCORDANCE WITH STANDARD DRAWING No. SEQ-WAT-1200-2
                                                                                                                                                                                                                                                                                     THE DESIGN IS BASED ON SURVEY INFORMATION AND THE
                                                                                                                                                                                                                                                                                                                                                      CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE
                                                                                                                                                                                                                                                                                     CONTRACTOR IS TO VERIFY ACTUAL SURFACE LEVELS AND
                                                                                                                                                                                                                                                                                                                                                      STANDARD DRAWINGS.
                                                                                                                                                                                                                                                                                     REPORT ANY DISCREPANCIES TO THE SUPERINTENDENT PRIOR
                                                                                                                                                                                                                                                                                     TO COMMENCING WORK.
                                                                                                                                                                                                                                                                                                                                                      THE CONSTRUCTION OF THE WATER RETICULATION SHOWN
                                                                                                                                                                                                                                                                                                                                                      SHALL BE SUPERVISED BY AN RPEQ REGISTERED ENGINEER.
                                                                                                                                                                                                                                                                                     1. VEGETATION PROTECTION                                         WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL NOT BE
                                                                                                                                                                                                                                                                                                                                                      PERMITTED TO CONNECT TO THE RETICULATION SYSTEM
                                                                                                                                                                                                                                                                                     a. TREES LOCATED ALONG THE FOOTPATH SHALL BE
                                                                                                                                                                                                                                                                                        TRANSPLANTED PRIOR TO CONSTRUCTION, OR REPLACED IF            ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS
                                                                                                                                                                                                                                                                                        DESTROYED.
                                                                                                                                                                                                                                                                                     b. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR
                                                                                                                                                                                                                                                                                                                                                      8. ALIGNMENT AND GRADE
                                                                                                                                  ITE LOCATION                                                                                                                                          HARDWOOD GIRDLES SHALL BE CONSTRUCTED WITH 1.8m
                                                                                                                                                                                                                                                                                        BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY
                                                                                                                                                                                                                                                                                        FROM GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO               ALIGNMENTS OF WATER MAINS (EQUAL TO OR <DN375) IN ROAD
                                                                                                                                                                                                                                                                                        TREES PRIOR TO CONSTRUCTION AND REMAIN UNTIL                  RESERVES TO BE 1.5m BOUNDARY OFFSET.
                                                                                                                                                                                                                                                                                        COMPLETION.                                                   FOR WATERMAINS >DN375, BOUNDARY OFFSET TO BE ADVISED
                                                                                                                                                                                                                                                                                     c. TREE ROOTS SHALL BE TUNNELED UNDER, RATHER THAN               BY UNITYWATER.
                                                                                                                                                                                                                                                                                        SEVERED. IF ROOTS ARE SEVERED THE DAMAGED AREA
                                                                                                                                                                                                                                                                                        SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT           9. LIVE WORKS
                                                                                                                                                                                                                                                                                        RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.
                                                                                                                                                                                                                                                                                     d. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY             ALL WORK ASSOCIATED WITH LIVE WATER MAINS ARE TO BE
                                                                                                                                                                                                                                                                                        AN APPROVED ARBORIST.                                         CARRIED OUT IN ACCORDANCE WITH THE SEQ SERVICE
                                                                                                                                                                                                                                                                                                                                                      PROVIDERS DIRECTIONS AT THE DEVELOPER'S COST.
                                                                                                                                                                                                                                                                                     2. SOIL
                                                                                                                                                                                                                                                                                                                                                      10. PROPERTY CONNECTIONS
                                                                                                                                                                                                                                                                                     a. TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.
                                                                                                                                                                                                                                                                                     b. CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM                  A WATER METER SUPPLIED AT THE DEVELOPER'S COST, IS
                                                                                                                                                                                                                                                                                        ENTERING THE STORMWATER SYSTEM. THIS MAY INVOLVE              TO BE INSTALLED AT THE SERVICE POINT OF EACH LOT IN
                                                                                                                                                                                                                                                                                        PLACING APPROPRIATE SEDIMENT CONTROLS AROUND                  ACCORDANCE WITH THE STANDARD DRAWING FOR THE
                                                                                                                                                                                                                                                                                        STOCKPILES.                                                   SEQ-SERVICE PROVIDER (SEQ-SP).

                                                                                                                                                                                                                   NORTH POINT
                                                                                                                                                                                                                                                                                     3. CREEK CROSSINGS                                               11. EXISTING SERVICES

                                                                                                                                                                                                                                                                                     a. SILTATION CONTROL MEASURES SHALL BE PLACED                    THE CONTRACTOR SHALL VERIFY THE LOCATION AND
                                                                                                                                                                                                                                                                                        DOWNSTREAM OF ANY EXCAVATION WORK.                            DEPTH   OF   EXISTING SERVICES  WITH RELEVANT
                                                                                                                                                                                                                                                                                     b. APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO                AUTHORITIES BEFORE COMMENCING WORKS.
                                                                                                                                                                                                                                                                                        PREVENT SEDIMENT FROM ENTERING THE CREEK.
                                                                                                                                                                                                                                                                                     c. NO SOIL SHALL BE STOCKPILED WITHIN 5m OF THE CREEK.           12. DATUM

              LOCALITY PLAN                                                                                                                                                                                                                                                          4. REHABILITATION                                                BENCH MARKS AND LEVELS TO AHD.
                                                                                                                                                                                                                                                                                                                                                      ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT
                                                                                                                                                                                                                                                                                                                                                      LEVEL.
                                                                                                                                                                                                                                                                                     a. PREDISTURBANCE SOIL PROFILES AND COMPACTION LEVELS

      DRAWING                                   CHEDULE                                                                                                                                                                                                                                 SHALL BE REINSTATED.
                                                                                                                                                                                                                                                                                     b. PREDISTURBANCE VEGETATION PATTERNS SHALL BE                   13. TESTING
                                                                                                                                                                                                                                                                                        RESTORED.
                                                                                                                                                                                            NOTES:                                                                                                                                                    TEST/CHLORINATION POINTS TO BE INSTALLED IN
       number                                      TITLE                                                                                                                                    1.   VERTICAL CLEARANCES APPLY WHEN WATER MAINS CROSS ONE
                                                                                                                                                                                                                                                                                     5. SAFETY                                                        ACCORDANCE
                                                                                                                                                                                                                                                                                                                                                      SEQ-WAT-1410-1.
                                                                                                                                                                                                                                                                                                                                                                      WITH  STANDARD DRAWING  NO.

      WATER RETICULATION                                                                                                                                                                         ANOTHER AND OTHER UTILITY SERVICES, EXCEPT IN THE CASE OF                           THE DESIGN AND CONSTRUCTION OF THE WORKS SHALL
  146-007-600                WATER RETICULATION GENERAL NOTES                                                                                                                                    SEWERS WHEN A VERTICAL SEPARATION SHALL ALWAYS BE MAINTAINED,                       COMPLY WITH ALL QUEENSLAND LEGISLATION.                          WATER MAINS ARE TO BE FLUSHED, CHLORINATED AND
  146-007-601                WATER RETICULATION LAYOUT PLAN                                                                                                                                      EVEN WHEN THE MAIN AND SEWER ARE PARALLEL. THE MAIN SHOULD                                                                                           PRESSURE     TESTED      AFTER INSTALLATION. THE
                                                                                                                                                                                                 ALWAYS BE LOCATED ABOVE THE SEWER TO MINIMISE THE POSSIBILITY                                                                                        CONTRACTOR SHALL PROVIDE TEST RESULTS TO THE
  146-007-602                WATER RETICULATION DETAIL PLAN                                                                                                                                                                                                                          THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL
                                                                                                                                                                                                 OF BACKFLOW CONTAMINATION IN THE EVENT OF A MAIN BREAK.                                                                                              SUPERINTENDENT     PRIOR    TO 'ON   MAINTENANCE'
                                                                                                                                                                                                                                                                                     TRENCH EXCAVATION AND CONSTRUCTION IS IN ACCORDANCE              INSPECTIONS.
                                                                                                                                                                                            2.   CLEARANCES CAN BE FURTHER REDUCED TO 150mm FOR DISTANCES UP
                                                                                                                                                                                                                                                                                     WITH CURRENT CONSTRUCTION SAFETY ACT AND W.H & S.
                                                                                                                                                                                                 TO 2m WHEN PASSING INSTALLATIONS SUCH AS POLES, PITS AND SMALL                      LEGISLATION.
                                                                                                                                                                                                 STRUCTURES, PROVIDING THE STRUCTURE IS NOT DESTABILISED IN THE                                                                                       BACTERIOLOGICAL TESTING OF THE MAINS TO BE DONE
                                                                                                                                                                                                 PROCESS.                                                                                                                                             UPON ACCEPTANCE AND WHEN DIRECTED BY UNITYWATER.
                                                                                                                                                                                            3.   WATER MAINS SHOULD ALWAYS CROSS OVER SEWERS AND                                     6. MATERIALS
                                                                                                                                                                                                 STORMWATER DRAINS. FOR CASES WHERE THERE IS NO ALTERNATIVE
                   CLEARANCES BETWEEN WATER MAINS AND                                                                                                                                            AND THE MAIN MUST CROSS UNDER THE SEWER, CONSTRUCTION SHALL                         ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE
                                                                                                                                                                                                                                                                                     CURRENT    SOUTH   EAST   QUEENSLAND     WATER   CODE
                         UNDERGROUND SERVICES                                                                                                                                                    BE IN ACCORDANCE WITH SEQ WATER SUPPLY CODE - STD DWG
                                                                                                                                                                                                 SEQ-WAT1211-1.                                                                      SPECIFICATIONS AND STANDARDS AND WITH THE RELEVANT
                                                                                                                                                                                            4.   WHEN THE SEWER IS AT THE MINIMUM VERTICAL CLEARANCE BELOW THE                       AUSTRALIAN STANDARDS UNLESS SPECIFIED OTHERWISE
            UTILITY          MINIMUM HORIZONTAL CLEARANCE
                                          (mm)                                 MINIMUM VERTICAL                                                                                                  WATER MAIN (500mm), MAINTAIN A MINIMUM HORIZONTAL CLEARANCE OF
         (EXISTING OR                                                                                                                                                                            1000mm.   THIS  MINIMUM     HORIZONTAL   CLEARANCE    CAN   BE                      ALL PIPES AND MATERIALS SHALL COMPLY WITH THE
          PROPOSED
                                                                                  CLEARANCE
                                           NEW MAIN SIZE                                                                                                                                         PROGRESSIVELY REDUCED TO 600mm AS THE VERTICAL CLEARANCE IS                         REQUIREMENTS OF THE SEQ CODE "ACCEPTED PRODUCTS AND
           SERVICE)                                                                  (mm)
                                ≤ 200mm               > 200mm                                                                                     BEFORE YOU DIG                                 INCREASED TO 750mm.                                                                 MATERIALS" LIST OR OTHERWISE NOTED.       ALTERNATIVE
                                                                                                                                                                                            5.   CLEARANCE FROM KERBS SHALL BE MEASURED FROM THE NEAREST                             MATERIALS PROPOSED FOR USE ARE TO BE CLEARLY SHOWN,
        WATER MAINS
          ≤ 375mm
                                     5
                                1000 /600                   5
                                                      1000 /600                                5004                                                                                              POINT OF THE KERB. FOR WATER MAINS ≤DN 375 CLEARANCES FROM                          LISTED AND DEFINED AS PART OF THE ENGINEERING                                  SERVICE LOCATIONS
                                                                                                                                                                                                 KERBS CAN BE PROGRESSIVELY REDUCED UNTIL THE MINIMUM OF 150mm                       SUBMISSION AND APPROVED BY UNITYWATER PRIOR TO USE.
        WATER MAINS                                                                                                                                                                              IS REACHED FOR MAINS ≤DN 200                                                                                                                                      IT IS THE RESPONSIBILITY OF THE PRINCIPAL
                                10005/600             10005/600                                5004
            375mm                                                                                                                                                                           6.   ALL WORKS ON EXISTING WATERMAINS TO BE CARRIED OUT BY                               DETECTABLE MARKING TAPE TO BE LAID ON TOP OF THE PIPE                        CONTRACTOR TO CONTACT ALL RELEVANT
       GRAVITY SEWERS                                                                                                                                                                            UNITYWATER PRIVATE WORKS AT THE DEVELOPER'S EXPENSE                                 EMBEDMENT MATERIAL BEFORE TRENCH FILLING. THE TAPE                           SERVICE AUTHORITIES TO VERIFY THE
                                    300                    600                            1502/300                                                                                                                                                                                   SHALL CONTAIN A CONTINUOUS METAL STRIP AND BE
          ≤ 300mm                                                                                                                                                                                                                                                                                                                                                 LOCATION OF ALL EXISTING SERVICES PRIOR
       GRAVITY SEWERS                                                                                                                                                                                                                                                                COLOURED AND PROVIDED WITH A DESCRIPTION OF THE WATER                        TO THE START OF CONSTRUCTION
                                    600                    600                                 300                                                                                                                                                                                   PRODUCT WITHIN.
            300mm
       TELECOMMUNICATION
      CONDUITS AND CABLES
                                    3003                   600                                 300                                                ENERGY SERVICE PROVIDERS                                            TELECOMMUNICATIONS
      ELECTRICITY CONDUITS
                                                                                                                                                    AGL                                                                SERVICE PROVIDERS                                                               elstra                                   Manual of Uniform Traffic Control Devices
          AND CABLES
                                    500                    1000                                5004                                                                                                                                                                                                         AUSTRALIA
                                                                                                                                                                                   ERGON.
       STORMWATER DRAINS
                                                                                                                                                                                   ENERGY
                                                                                                                                                                                                 energex            ' yes'         Telstra             visionstream
            ≤ 300mm
                                    3003                   600                                 1504
                                                                                                                                                              origin                                                   OPTUS                                                         WARNING: OPTIC FIBRE                                             NOTE: ALL SIGNS & LINE MARKING TO BE IN
       STORMWATER DRAINS                                                                                                                        NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM                NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM                   EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
                                    3003                   600                                 3004
             300mm                                                                                                                                    PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED                   PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED                VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO                       ACCORDANCE WITH THE MANUAL OF
                                                                                                                                                      PRIOR TO START OF CONSTRUCTION. PHONE DBYD                       PRIOR TO START OF CONSTRUCTION. PHONE DBYD
              KERBS                 150                    600                 150 (WHERE POSSIBLE)                                                   SERVICE LOCATIONS ON 1100 FOR DETAILS.                           SERVICE LOCATIONS ON 1100 FOR DETAILS.
                                                                                                                                                                                                                                                                                     BE CONFIRMED PRIOR TO START OF CONSTRUCTION.                           UNIFORM TRAFFIC CONTROL DEVICES.
      * BASED ON WSA TABLE 4.3 OF WSA 02




                                                                                                                                                                                                                         BAX
                                                                           SCALE:                                                SURVEYED:                                                                                                                                CLIENT:                                                       NORTH POINT    TITLE:
                                                                                          0      25   50   75 100 125m
                                                                                                                                                                                                                                                                                    CAPITAL PRUDENTIAL PTY LTD                                         WATER RETICULATION
                                                                                          Scale 1:2500 - A1 (1:5000 - A3)
                                                                                                                                 DATUM:   AHD                                                                                                                                                                                                          GENERAL NOTES

A 07.08.23 ISSUE FOR APPROVAL                                   QT   MM
                                                                           PROJECT NO:

                                                                                    146-007
                                                                           LOCAL AUTHORITY APPROVAL NO:
                                                                                                           DATE

                                                                                                           CHECKED

                                                                                                           DRAWN
                                                                                                                      07.08.23
                                                                                                                        MM
                                                                                                                        QT
                                                                                                                                 APPROVED:

                                                                                                                                                             GLENN AINSWORTH
                                                                                                                                                                  CPESC No: 7678
                                                                                                                                                                  RPEQ No: 19204
                                                                                                                                                                                                                         Engineering
                                                                                                                                                                                                                 2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
                                                                                                                                                                                                                                                              PTY. LTD.
                                                                                                                                                                                                                                                                          PROJECT:

                                                                                                                                                                                                                                                                           79-83 EUMUNDI NOOSA RD & 26 HEADLAND DR
                                                                                                                                                                                                                                                                                     NOOSAVILLE QLD 4566
No.    DATE             REVISIONS                               BY   CKD                 ---               DESIGNED     QT       FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.                                          [email protected]                                                                                                     PLAN No      146-007-600          REVISION      A      A3
Log in to download the original file

water and sewer design.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.