Council archive · source document
Decision Notice - 010.2007.00000742.001 [As Published] · 132007.742
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 11
Erosion and Sediment Control
47. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Management Plans
48. The applicant shall submit reports for the relevant stage in accordance with the Environmental
Management Strategy as outlined in Section 6 of the NNSETP Code, unless previously approved by
Council for all stages. These reports shall be submitted for approval in conjunction with Operational
Works application for the relevant stage.
49. A Construction Management Plan addressing all construction phases of the relevant stage shall be
prepared by a suitably qualified person and submitted to Council for approval prior to obtaining a
Development Permit for Operational Works. The plan should aim to address every foreseeable problem
eg: movements of excavation and construction machinery, building material deliveries, stockpiling of
materials etc that is likely to occur during the construction process of the relevant stage and include
recommendations on how these can be overcome or minimised.
General
50. Digital detailed designs including drawings, calculations, etc shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The
design shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the plans.
51. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
52. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
53. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
54. Potable drinking water to all sinks, taps and showers is to meet the Australian Drinking Water Standards.
55. Water must be treated to a potable standard and analysed by an approved lab for bacterial quality as
directed by Noosa Council.
56. The developer must provide waste storage and disposal facilities at this development in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
Premises”, including an external imperviously paved area correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring properties. A wash down are is
required with a cold-water tap, hose and drain outlet connected to septic system or approved absorption
trench. The drain outlet is to be designed to prevent stormwater entry to the absorption trench.
57. Refuse containers must be provided for premises and the recreation/BBQ area in accordance with the
requirements of the Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
58. The development must allow refuse-loading areas to be located off street. All vehicles associated with the
collection of waste/recyclables, shall enter and leave the site in a forward direction.
59. A Waste Management Plan (Operational) in accordance with the Noosa North Shore Eco-Tourism Portal
Development, must be submitted for the day-to-day operations and approved by Council’s Environmental
Health Section prior to issue of development permit for operational works.
60. A Waste Management Plan (Demolition/Construction) in accordance with the Noosa North Shore Eco-
Tourism Portal Development Code, shall be submitted for the demolition and construction phases of the
development and approved by Council’s Environmental Health Section prior to the issue of the
development permit for operational works.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec12f422\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00000742.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 52 KB (small file)
- File type
No other editions are linked here.