               18.    Roof and surface water is to be collected on site and is to be discharged in accordance with
                      Council’s Engineering Design Standards. A Development Permit for Building Works shall
                      not be granted until a Development Permit for Operational Works has been issued in regard
                      to the drainage scheme.
               19.    The existing concrete footpath along Gibson Road adjacent to the new retail extensions shall
                      be extended along the frontage of the site to the proposed pedestrian crossing within the car
                      parking area. A Development Permit for Operational Works shall be obtained prior to the
                      commencement of any works. Footpath and property alignment levels may be obtained from
                      the Works Inspector-Development upon request.
               20.    The concrete footpath is to be designed and constructed to ensure pedestrian safety using
                      non-slip materials and to produce an evenly graded surface finish.
               21.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP 28
                      and PSP 30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates as at December 1999, under the current policies is as follows:-
                              Water Supply          $2,168
                              Sewerage        $2,913
                              ______________________
                              TOTAL:                $5,081
                      All headworks contributions must be paid prior to the issue of a Development Permit for
                      Operational Works.
                      Alternatively, a trading bank guarantee shall be submitted to Council plus 20%. Should the
                      headworks contributions not be paid at the due time, Council shall call upon the trading bank
                      guarantee in full.
                      In the event that the Development Permit for Material Change of Use of Premises lapses or
                      is cancelled, the contribution or trading bank guarantee will be returned.
               22.    Alteration of any public utility or other facilities necessitated by the development of the land
                      or associated construction works external to the site shall be at no cost to Council.
               23.    Minimum Floor Heights for the development shall be in accordance with the Planning
                      Scheme at the time of issue of the Building Permit.
               24.    Fill levels in accordance with Council’s Noosaville Master Drainage Plan will be provided on
                      application to Council's Works Department. If any filling works are required on the site, they
                      shall be carried out in accordance with Section 3.8 of Council's "Engineering Design
                      Standards" manual. No earthworks or filling works are to be undertaken until issue of a
                      Development Permit for Operational Works -Filling.
               25.    To protect the environment against siltation/sediment export or soil erosion as a result of this
                      development, an erosion and sediment control plan shall be submitted in conjunction with
                      any Development Permit for Operational Works. Site control measures such as silt fencing,
                      controlled gravel access to the site and controlled disposal of waste, may be necessary. Prior
                      to commencement of Operational Works and/or Building Works, all physical site control
                      measures shall be installed, and the plan adhered to.
                      Prior to commencement of Operational Works a $2,000 site control bond is required to be
                      lodged with the Council to ensure compliance with this condition.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      this condition or any additional inspections incurred for substandard work or works
                      undertaken not in accordance with this permit.




                                                                                                        Page 4 of 11
Document Set ID: 20550987
Version: 2, Version Date: 22/03/2018                                                                Print Date: 4 March 2022, 10:32 AM

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

6 Minor Change Approval 131999.982622.5.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.