Table 10 – Compliance with the Natural hazards overlay code
Specific Outcomes Probable Solutions Compliance Comment
Effects of Use and Works
New Uses S4.1 The use is sited on land that is not in a Medium or High Bushfire The proposed retail centre will be located on an area
O4 The proposed use does not Hazard Area; of the site considered to be low bushfire hazard area.
compromise the safety of people or OR The balance area of the site may be subject to future
property from bushfire. S4.2 The use is sited on land that is determined as low bushfire risk by a
site specific bushfire hazard assessment.
development, and whilst designated as a medium
bushfire hazard area in accordance with a site-
specific hazard analysis, specific mitigation measures
have been devised to protect people and property
in the event of a bushfire emergency.
Protection of Infrastructure and
Community Uses
O5 Community Uses and Infrastructure S5.1 Community Uses and Infrastructure Uses are not located in a High
Uses, including that identified below, are or Medium Bushfire Hazard Area identified on Overlay Maps OM1.4 to
able to function effectively during and OM9.4;
immediately after bushfire events— OR
a) Emergency service facilities; The proposed development is not considered a
S5.2 Building work will not involve more than an additional 20m2 of
n/a Community Use or Infrastructure Use for the purposes
b) Hospitals; gross floor area to an existing building;
of the Natural hazards overlay code.
c) Education Type 4 uses, including OR
stores for valuable records or items of S5.3 Where located in a High or Medium Bushfire Hazard Area
historic or cultural significance; and identified on Overlay Maps OM1.4 to OM9.4, uses are designed to
d) Service and utility uses, including function effectively during and immediately after bushfire events.
electricity substations, major electrical
depots and water treatment plants.
Hazardous materials
O6 Public safety and the environment
are not adversely affected by the
detrimental impacts of bushfire on
S6.1 Hazardous materials are not manufactured and stored on the
site. No hazardous materials are proposed to be
manufactured or stored on the site.
hazardous materials manufactured or
stored in bulk.
Bushfire Management Plan
February 2015 Page 27
215 David Low Way, Peregian Beach
Scanlon Property Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.