Original source · versioned page text
Information Response - Email 1 of 2 MCU16/0153 & REC16/0041
Very large file: it may take a few minutes
The original of this document is very large (22.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
STORMWATER MANAGEMENT PLAN Client: Thomco (No 2087) Pty Ltd Location: 215 David Low Way, Peregian Beach CONTENTS 1.0 INTRODUCTION 4 2.0 SITE DESCRIPTION 4 2.1 Site Location 4 2.2 Land-use, Topography and Drainage 5 2.3 Proposed Land-use 5 3.0 WATER QUALITY AND TREATMENT OBJECTIVES 5 3.1 Water Quality Objectives 5 3.2 Area of Treatment 6 4.0 WATER QUALITY MODELLING ASSESSMENT/APPROACH 6 4.1 Scenario Methodology 6 4.2 Proposed Stormwater Treatment Train 6 4.3 MUSIC Model Parameters 8 4.4 Land Use/Source Node Areas 8 4.5 Pollutant Reduction Results 9 5.0 STORMWATER QUANTITY 10 5.1 Receiving Environment 10 5.2 Pre/post Developed Flows 10 5.3 Incidental Detention 11 5.4 Stormwater Outlet Arrangement 11 5.5 Ecologist Feedback 11 5.6 Mitigation Recommendation 11 6.0 MAINTENANCE PERIOD 12 6.1 Maintenance During ‘Construction Period’ 12 6.2 Maintenance During ‘Maintenance Period’ 12 7.0 CONCLUSIONS AND RECOMMENDATIONS 12 8.0 REFERENCES 13 Covey Associates Pty Ltd 2 Project No: 162042 Consulting Engineers 100949Rpt Issue B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.