Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Information Response - Email 1 of 2 MCU16/0153 & REC16/0041

of 124

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (22.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

5.0       BUSHFIRE MANAGEMENT PLAN
5.1       Introduction
The following section describes bushfire risk reduction measures to be utilised at the subject
site to reduce the risk of bushfire impact to people and property. The scope of referenced
bushfire mitigation measures have been derived from:

         Appendix 8 of State Planning Policy 1/03 ‘Mitigating the Adverse Impacts of Flood,
          Bushfire and Landslide (2003);

         Construction of Buildings in Bushfire Prone Areas (AS3959-1999);

         Bushfire Hazard Planning in Queensland. QFRA, Brisbane (1993); and

         Planning Scheme Policy No. 13: Preparation of a Bushfire Management Plan,
          Maroochy Plan (2000).

5.2       Asset Protection Zones (APZs)
APZs provide a defensive tool to assist in the reduction of potential bushfire impact to
people and property situated in bushfire prone areas. For illustrative purposes Figure 8
depicts the concept of protection zones about dwellings in bushfire prone areas.


Figure 8 – Components of an Asset Protection Zone (APZ)




Asset protection zones are the most strategically valuable defence against radiant heat
and flame, and to a lesser extent, embers.

Table 8 describes the recommended Asset Protection Zones to be provided at the subject
site. Determination of the recommended Asset Protection Zone widths has been derived
from the results of flame length modelling presented previously in combination with
consideration of the practical bushfire risk acting on the site.

Whilst these APZ should prevent buildings from being subjected to direct contact from
flames, and reduced levels of radiant heat in the event of a bushfire, building construction



                                      Bushfire Management Plan
February 2015                                                                  Page 21
                                 215 David Low Way, Peregian Beach
                                       Scanlon Property Group
Log in to download the original file

Information Response - Email 1 of 2 MCU16_0153 & REC16_0041.pdf · 22.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.