Council archive · source document
Attachment 6 - UXO Report May 2010 · MCU13/0251
Post Activity Certification . UXO Search & Remediation Milsearch Peregian Caravan Park, 215 David Low Way, Peregian Beach. 5.0 QUALITY MANAGEMENT 5.1. QUALITY CONTROL Milsearch Quality Control procedures are documented in the Milsearch Quality Management document MilQM. This document mandates the Standard Operation Procedures (SOPs) that are to be followed by all Milsearch EOD technicians in the course of UXO search and remediation. As a minimum, QC ensured that all search equipment was inspected and tested at the beginning of the daily work activities to ensure; ¢ All equipment was tested and calibrated prior to the commericement of data gathering to ensure it operated within the Original Manufacturers Specifications (OEM); and e All equipment was tested during, and at the end of the day to ensure at all times, it performed within the manufacturers specifications. The following documentation, in support of Milsearch Pty Ltd QC procedures, is attached to this Report; e Search Equipment Daily Test Log is presented at appendix C. . 5.2 QUALITY ASSURANCE As part of the Milsearch Standard Operating procedures (SOPs), Quality was ensured by a formal and documented QC program. These procedures ensure that a planned and systematic pattern of all actions necessary to provide adequate confidence that management and technical planning and controls have been adhered to ensuring; e Site specific OH & § Plans, Quality Plans, Work Instructions and Safe Work Method Statements were raised iaw Qid OHS Regulations. e Ongoing supervision and QC checking revealed no faults in operator performance; and » Asaminimum, the Project Manager carried out a 10% (approximately) QC check of the area subject to a deep search. A random pattern was also searched around the remainder of the Park, using an F3 Minelab.. This check was carried out on the last day of operations. There were nil significant items found. e DGPS coordinates were captured of the site boundary and those areas subjected to a deep search. Once the planned works begin, these areas will be able to be identified at any stage. © Milsearch Pty Ltd Project Reference: MiiS QLD 14810
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - UXO Report May 2010Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.