Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 6 - UXO Report May 2010 · MCU13/0251

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Post Activity Certification .
UXO Search & Remediation Milsearch

Peregian Caravan Park, 215 David Low Way, Peregian Beach.

5.0 QUALITY MANAGEMENT

5.1. QUALITY CONTROL

Milsearch Quality Control procedures are documented in the Milsearch Quality Management
document MilQM. This document mandates the Standard Operation Procedures (SOPs) that are
to be followed by all Milsearch EOD technicians in the course of UXO search and remediation. As
a minimum, QC ensured that all search equipment was inspected and tested at the beginning of
the daily work activities to ensure;

¢ All equipment was tested and calibrated prior to the commericement of data gathering to
ensure it operated within the Original Manufacturers Specifications (OEM); and

e All equipment was tested during, and at the end of the day to ensure at all times, it
performed within the manufacturers specifications.

The following documentation, in support of Milsearch Pty Ltd QC procedures, is attached to this
Report;

e Search Equipment Daily Test Log is presented at appendix C. .

5.2 QUALITY ASSURANCE

As part of the Milsearch Standard Operating procedures (SOPs), Quality was ensured by a formal
and documented QC program. These procedures ensure that a planned and systematic pattern of
all actions necessary to provide adequate confidence that management and technical planning and
controls have been adhered to ensuring;

e Site specific OH & § Plans, Quality Plans, Work Instructions and Safe Work Method
Statements were raised iaw Qid OHS Regulations.

e Ongoing supervision and QC checking revealed no faults in operator performance; and

» Asaminimum, the Project Manager carried out a 10% (approximately) QC check of the
area subject to a deep search. A random pattern was also searched around the remainder
of the Park, using an F3 Minelab.. This check was carried out on the last day of operations.
There were nil significant items found.

e DGPS coordinates were captured of the site boundary and those areas subjected to a deep
search. Once the planned works begin, these areas will be able to be identified at any
stage.

 

© Milsearch Pty Ltd
Project Reference: MiiS QLD 14810

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - UXO Report May 2010.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.