Council archive · source document
Attachment 6 - UXO Report May 2010 · MCU13/0251
Post Activity Certification . UXO Search & Remediation Milsearch Peregian Caravan Park, 215 David Low Way, Peregian Beach. 4.2 SITE TEST PIT e Prior to carrying out the UXO Search a test pit was excavated on site. e A37mm projectile and a 6lb Artillery projectile were placed at depths of 30cm and 50cm (respectively). The Foerster 4032 magnetometer and Minelab F3 were tested over these items at the specified depths. e The tests were carried out at the start and end of the UXO Remediation with positive results. All items were easily detected at the specified depths. e Photographs 5 — 7 below depict the test pit. T: Test holes with test pieces © Milsearch Pty Lid Project Reference: MilS QLD 14810
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - UXO Report May 2010Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.