3.5     WATER

3.5.1   Existing Infrastructure

        The Unity Water As-Constructed Plans of the surrounding area indicate the following existing water reticulation information:

            −    An existing 180mm dia. water main is located below the eastern verge of the private access roadway along the full
                 length of the development site frontage; and

            −    An existing 150mm dia. property connection is below the private access roadway the western verge and the Site A
                 lot frontage.

        The Unity Water As-Constructed Plans of the existing water infrastructure can be found in Appendix C of this report.


3.5.2   Proposed Infrastructure

        The proposed water infrastructure for this development is as follows:

            −    A new property connection from the existing 180mm water main to service the Site B lot and development;

            −    Extending the existing 150mm property connection below the western verge of the access road to service the Site
                 A lot and proposed development; and

            −    As the surrounding roadways and services have been master-planned to service a fully developed catchment, it is
                 expected the existing water infrastructure has sufficient capacity to service the proposed development.

        Refer to Appendix B for preliminary drawings of the proposed water works.


3.6     ELECTRICITY

        The Energex Asset Plans from a Dial Before You Dig investigation of the surrounding area indicate the following:

            −    Underground electrical infrastructure exists along private access roadway and surrounding road network; and

            −    It is expected this infrastructure can service the proposed development.

        Energex Asset Plans of the existing electrical infrastructure can be found in Appendix C of this report.


        Electrical services required for the proposed development including assessment of the existing infrastructure capacity will
        be designed and determined by an electrical engineer and will be assessed by Energex during the detailed design phase of
        the development.


3.7     COMMUNICATIONS

        The Telstra Asset Plans from a Dial Before You Dig investigation of the surrounding area indicate the following:

            −    Underground communications infrastructure exists along private access roadway and surrounding roadways; and

            −    It is expected this infrastructure can service the proposed development.

        Telstra Asset Plans of the existing communications infrastructure can be found in Appendix C of this report. All works required
        to provide communication services to the proposed development will be undertaken with the relevant service providers
        approval and coordination.




                                                    www.bornhorstward.com.au                                                   Page 7

Used in these records

About this file

File size
15.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Serviceability Report.PDF · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.