Skip to the record
Beware of cheap imitations.

Council archive · source document

Appendix C- Serviceability Report · MCU23/0078

of 55

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 43, section 1. The text section number identifies this passage in the reader.

Performance outcomes                                               Acceptable Outcomes
                                                                         more than 2 weeks; and
                                                                   (d)   unless a development permit provides otherwise,
                                                                         disturbed areas are revegetated using species identified
                                                                         in Council's Planning Scheme Policy PSP2
                                                                         Landscaping.

                                                                   AO4.2
                                                                   Earthworks are undertaken only during the hours of 7:00am to
                                                                   6:00pm, Monday to Friday and 7:00am to 3:00pm on
                                                                   Saturday. No work is undertaken on Sunday or public
                                                                   holidays.
Vegetative waste
PO5                                                                AO5.1
Vegetation cleared from a development site is disposed of in       Cleared vegetation is transported off­site for disposal in an
an environmentally responsible manner.                             approved green waste disposal facility.

                                                                   AO5.2
                                                                   Cleared vegetation is mulched on­site and reused for
                                                                   landscaping of the finished development.

                                                                   AO5.3
                                                                   Cleared vegetation is disposed of for the purpose of firewood.

                                                                   AO5.4
                                                                   Disposal of vegetative waste by burning off is avoided.
Managing contamination risk
PO6                                                                AO6.1
Materials used as fill are suitable for development and future     Fill material is solid clean earth, free of putrescible or refuse
use of the land and filling or excavation works do not result in   material, vegetation, acid sulfate soils, building or construction
the contamination of land.                                         material or other material or contaminants.

                                                                   AO6.2
                                                                   The site is not on the contaminated land register.
Haulage activity and amenity
PO7
Haulage of material to and from a site ensures—                    No acceptable outcome provided
(a)   minimal disturbance to neighbouring properties and
      properties along the haulage route; and
(b)   Council’s road infrastructure including pavements is not
      adversely affected.

Extent of earthworks
PO8                                                                AO8
The layout of the development provides adequate, clearly           All earthworks, including cut and fill batters, retaining walls
defined and easily accessible—                                     and the like are contained within the subject site.
(a)   on­site vehicle parking and manoeuvring areas; and
(b)   loading and manoeuvring areas for delivery and service
      vehicles.




                                             NOOSA PLAN 2020 ­ AMENDED AT 25 SEPTEMBER 2020                                 Page 92 of 150

Used in these records

About this file

File size
15.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Serviceability Report.PDF · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.