Council archive · source document
Appendix C- Serviceability Report · MCU23/0078
Very large file (15.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 45, section 1. The text section number identifies this passage in the reader.
(a) Underground infrastructure is accessible for maintenance purposes.
(b) Existing services are identified and methods of protection and access are implemented in the design of the development.
Table 9.4.3.3 Criteria for assessment
Setbacks, easements and maintenance Table 9.4.3.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Assessable development
PO1 No acceptable outcome provided
Development near a stormwater drain, overland flow path or
associated structure does not—
(a) adversely affect the function of the service;
(b) place an additional load on the service; and
(c) unduly increase future maintenance costs.
PO2 AO2.1
Maintenance access is provided to all stormwater drains, overland For trunk infrastructure, a registered easement in favour of Council
flow paths and associated structures. is created over all underground infrastructure located in private
property.
AO2.2
The width of the easement required is in accordance with
Council’s Planning Scheme Policy PSP6 Engineering Design
Standards – Roads, drainage and earthworks.
AO2.3
The easement is centred over the centreline of the infrastructure.
NOOSA PLAN 2020 AMENDED AT 25 SEPTEMBER 2020 Page 94 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C- Serviceability Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 15.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.