Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                  ADG Consulting Pty Ltd          All Correspondence
                                                                  ACN: 630 555 225                PO Box 6405
                                                                  ABN: 98 630 555 225             Yatala DC QLD 4207


                                                                  P 07 3801 1564
                                                                  E [email protected]
                                                                  W adgconsulting.com.au




  Dewatering Management Plan
  Proposed ‘Palazzesi’ Residential Development:
  Lot 145 on N21859, 38 Mossman Court, Noosa Heads, Queensland




  December 2024




  Prepared for:
  Metricon Homes QLD Pty Ltd




Acid Sulfate Soil Assessment      On‐site Wastewater Management      Contaminated Land Assessment & Remediation
Dewatering Management          Environmental Management Plans     Surface & Groundwater Investigation & Monitoring
Log in to download the original file

ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24.pdf · 7.4 MB (large file)

The download may take up to a minute.

Full text of the other 39 pages

Page 2

                                                                                               ADG Consulting Pty Ltd


                                                     Report details



     Project ref:                    ADG1304.21
     ADG Project Contact:            Michael Campbell
     Report title:                   Dewatering Management Plan
                                     Proposed ‘Palazzesi’ Residential Development:
                                     Lot 145 on N21859, 38 Mossman Court, Noosa Heads, Queensland


     Version:                        Rev1.1
     Author(s):                      Michael Campbell
     Reviewer:                       Michael Campbell


     Client:                         Metricon Homes QLD Pty Ltd c/‐ SCG Consulting Engineers
     Client contact:                 Tom Harrington


     Distribution date:              17 December 2024
     Distributed to:                 SCG Consulting Engineers
     Copies:                         1 PDF



     ADG Consulting Pty Ltd




     Michael Campbell BEnvSc, BSc[Hons],
     DipProjMgt, DipOHS, DipBusMgt, DipBus(Quality Auditing)
     MEIANZ, MALGA, MASSI
     Director & Principal Environmental Scientist

     Date: 17 December 2024


     This document and all its content is copyright. Apart from fair dealing for the purposes of study, research, criticism
     and/or review as permitted under the Copyright Act 1968, no part of the content may be reproduced, reused or
     redistributed without the prior written permission of ADG Consulting Pty Ltd.




ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                               Page ii

Page 3

                                                                                  ADG Consulting Pty Ltd


                                                      Table of Contents
1        INTRODUCTION                                                                                1
1.1      PROPOSED DEVELOPMENT                                                                        1
1.2      RELEVANT GUIDELINES                                                                         1
1.3      GENERAL ENVIRONMENTAL DUTY                                                                  1
1.4      DMP OBJECTIVES                                                                              1
1.5      SCOPE OF WORK                                                                               2
2        SITE CHARACTERISTICS                                                                        3
2.1      PROPERTY DESCRIPTION                                                                        3
2.2      SURROUNDING ENVIRONMENT                                                                     3
2.3      TOPOGRAPHY                                                                                  3
2.4      GEOLOGY & SOILS                                                                             3
2.5      HYDROGEOLOGY                                                                                3
3        PREVIOUS INVESTIGATIONS                                                                     4
3.1      DOUGLAS PARTNERS PTY LTD 2021                                                               4
3.1.1    SOILS                                                                                       4
3.1.2    GROUNDWATER                                                                                 4
3.2      GROUNDWATER QUALITY                                                                         5
4        WATER QUALITY OBJECTIVES                                                                    6
4.1      RECEIVING ENVIRONMENT                                                                       6
4.2      DEVELOPMENT OF WATER QUALITY OBJECTIVES                                                     6
4.3      PROPOSED WATER QUALITY OBJECTIVES                                                           7
5        DEWATERING METHODOLOGY                                                                      9
5.1      BASEMENT EXCAVATION AND SHORING                                                             9
5.2      GROUNDWATER EXTRACTION                                                                      9
5.3      EXTRACTION/DISCHARGE RATES AND VOLUME                                                       9
5.3.1    DEWATERING EXTRACTION CALCULATION BASED ON SUBSURFACE SOIL PROFILE                          9
5.3.2    DEWATERING DISCHARGE RATE BASED ON STORMWATER SYSTEM SIZE (ESTIMATION)                      10
5.3.3    CONCLUSIONS ON EXPECTED EXTRACTION RATES                                                    10
5.4      DEWATERING DURATION                                                                         10
5.5      GROUNDWATER DRAWDOWN                                                                        10
5.6      GROUNDWATER TREATMENT                                                                       11
6        WATER QUALITY MANAGEMENT                                                                    12
6.1      RESPONSIBILITY                                                                              12
6.2      OPERATIONAL POLICY                                                                          12
6.3      PERFORMANCE CRITERIA                                                                        12
6.4      IMPLEMENTATION STRATEGY                                                                     12
6.4.1    GROUNDWATER TREATMENT SYSTEMS                                                               12
6.4.2    DEWATERING STRATEGY                                                                         13
6.4.3    INITIAL PUMP‐OUT                                                                            13
6.5      MONITORING                                                                                  13
6.5.1    VISUAL MONITORING                                                                           13
6.5.2    WATER QUALITY MONITORING                                                                    13
6.5.3    MONITORING RESPONSIBILITIES                                                                 14
6.6      MAINTENANCE                                                                                 14
6.7      REPORTING                                                                                   15
6.8      CONTINGENCIES                                                                               15
7        NOISE & ODOUR MANAGEMENT                                                                    17
7.1      RESPONSIBILITY                                                                              17
7.2      OPERATIONAL POLICY                                                                          17
7.3      PERFORMANCE CRITERIA                                                                        17
7.4      IMPLEMENTATION STRATEGY                                                                     17
7.4.1    NOISE                                                                                       17
7.4.2    ODOUR                                                                                       17


    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                         Page iii

Page 4

                                                            ADG Consulting Pty Ltd


7.5      MONITORING                                                            17
7.6      REPORTING                                                             17
7.7      CONTINGENCIES                                                         17
8        LIMITATIONS                                                           18
9        REFERENCES                                                            19
APPENDIX A:       FIGURES
APPENDIX B:       DRDMW LICENCED BORE SEARCH
APPENDIX C:      DESIGN PLANS
APPENDIX D:       DEWATERING CALCULATION OUTPUT




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                   Page iv

Page 5

                                                                                              ADG Consulting Pty Ltd


1        Introduction
         ADG Consulting Pty Ltd (ADG) was engaged by Metricon Homes QLD Pty Ltd to prepare a Dewatering
         Management Plan (DMP) for the proposed residential development within property described as Lot 145
         on N21859, situated at 38 Mossman Court, Noosa Heads, Queensland.
1.1      Proposed development
         The proposed development comprises the construction of a two‐storey residential dwelling over a single
         storey in‐ground basement carpark. The supplied information indicates that excavations to facilitate the
         construction of the basement level will extend to a maximum of approximately 2.7 m below natural
         ground levels (approx. 2.2 m AHD) to a maximum excavation elevation of approximately ‐0.5 m Australian
         Height Datum (AHD). Localised deeper excavations may be required for the construction of other
         structural elements (i.e. footings and pile caps), where required.

         Groundwater seepage was recorded at 1.6 m below ground level, during preliminary geotechnical works
         (drilling) on the site by Douglas Partners (2021). Given the sites proximity to the Noosa River (adjacent)
         and the presence of groundwater, dewatering will be necessary to allow the basement to be constructed
         in dry conditions.
1.2      Relevant guidelines
         The DMP was prepared with reference to the following documents:
              Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2018. Australian and
               New Zealand Governments and Australian state and territory governments (ANZG), Canberra ACT,
               Australia.
              Australian and New Zealand Guidelines for Fresh and Marine Water Quality. 2000. Australian and
               New Zealand Environment and Conservation Council and Agriculture and Resource Management
               Council of Australia and New Zealand (ANZECC/ARMCANZ).
              Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of Environment
               and Science (DES), Queensland Government.
              Noosa River environmental values and water quality objectives. 2022. Department of Environment
               and Science (DES), Queensland Government.
              Guidelines for Managing Risks in Recreational Water. 2018. Australian Government, National Health
               and Medical Research Council (NHMRC).
              Monitoring and Sampling Manual 2018, Version 2 June 2018. 2018. Department of Environment
               and Science (DES).
              Queensland Water Quality Guidelines 2009, Version 3. 2013. The Department of Environment and
               Heritage Protection (DEHP).
1.3      General environmental duty
         The Environmental Protection Act 1994 describes that all persons in Queensland have a “General
         Environmental Duty” and that “a person must not carry out an activity that causes, or is likely to cause
         environmental harm unless the person takes all reasonable and practicable measures to prevent or
         minimise the harm”.

         The Act requires that appropriate action be taken to report that environmental harm is occurring or has
         the potential to occur, unless the harm is authorised under an environmental protection policy, an
         environmental management program, a development approval, or an environmental protection order.
         This is known as the “Duty to Notify”. Failure to fulfil this duty is an offence and may result in prosecution.
1.4      DMP objectives
         The objectives of the DMP are to:




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                         Page 1

Page 6

                                                                                     ADG Consulting Pty Ltd


           Describe the dewatering methodology, groundwater treatment, monitoring and reporting
            procedures to be employed at the site during dewatering activities.
           Provide effective management procedures to prevent environmental harm resulting from the
            discharge of extracted groundwater from the site.
1.5   Scope of work
      To achieve the investigation objectives, the following scope of work was undertaken:
           A desktop study including:
            1. Review of the development proposal and proposed shoring/dewatering designs (where
               available).
            2. Review of geology and soil maps for the area.
            3. Search of groundwater bores licensed by the Department of Regional Development,
               Manufacturing and Water (DRDMW) within a 500 m radius of the site.
            4. Review of relevant existing reports and groundwater data from the local area.
            5. Review of current aerial photographs of the site and surrounds.




 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                Page 2

Page 7

                                                                                                ADG Consulting Pty Ltd


2        Site characteristics
2.1      Property description
         The site is described as Lot 145 on N21859, and is situated at 38 Mossman Court, Noosa Heads,
         Queensland. The site is understood to be currently occupied by a multistorey dwelling (Nearmap Imagery,
         10 September 2021) which is planned to be demolished. The site is irregular in shape and has an area of
         607 m2. The site locality is shown in Figure 1, Appendix A.
2.2      Surrounding environment
         The surrounding environment and land use is described briefly in Table 1.

         Table 1 Surrounding land use and environment

                  Direction                                              Environment

                    North             Mossman Court, then residential development, then Noosa River.

                     East             Residential development.

                    South             Noosa River, then reserve area, then residential development.

                    West              Residential development, then Noosa River.


2.3      Topography
         The site and surrounding land is considered to be generally level, with the site gently sloping towards the
         Noosa River from the north to the south, southeast. Surface elevations range from 2.20 m to between
         1.62 and 1.25 m AHD. Refer to Appendix C (Design Plans).
2.4      Geology & soils
         The surface geology at the site is mapped as being Anthropocene aged gravel, sand and silt; man‐made
         deposits generally associated with land‐fill or mining (tailings, dumps and rehabilitated areas). The
         dominant rock type is identified as volcanic and metamorphic as reference through the detailed surface
         geology (accessed via Queensland Globe online, 6 October 2021).

         The Acid Sulfate Soils (ASS) mapping layer 1:100,000 Redcliffe to Teewah categorises the site as ‘SDL’ or
         ‘Acid Sulfate on Disturbed Land’, indicating that the site is likely to contain acid sulfate soils (and potential
         exists that partial or full treatment may have been undertaken), however limited field investigation has
         been performed in this area (accessed via Queensland Globe online, 6 October 2021).
2.5      Hydrogeology
         A search of groundwater bores licensed by DRDMW was conducted by ADG on 6 October 2021. The
         search identified no licensed bores within a 500 m radius of the site. A map showing the bore search area
         is provided in Appendix B.

         Based on the local geology and topography, and the site’s proximity to the Noosa River, the inferred
         groundwater flow is to the south. Groundwater beneath the site is likely to be hydraulically connected to
         the river, therefore saline groundwater conditions are anticipated, and additional saltwater intrusion is
         likely to occur during dewatering.




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                           Page 3

Page 8

                                                                                              ADG Consulting Pty Ltd


3        Previous investigations
         This DMP is based on site specific information sourced from the following, provided to ADG by Metricon
         Homes QLD Pty Ltd:
              Preliminary Geotechnical Investigation, Proposed Residence, 38 Mossman Court, Noosa Heads.
               2021. Douglas Partners Pty Ltd. Ref: 206126.00.R.001.
              Design Plans, Pallazzesi Residence, Lot 145, 38 Mossman Crt, Noosa Heads. SCG Consulting
               Engineers. (December 2024).
         A brief discussion of relevant soil and groundwater conditions is provided below.
3.1      Douglas Partners Pty Ltd 2021
         A preliminary Geotechnical Investigation was undertaken at the site in July 2021 by Douglas Partners Pty
         Ltd (DP).
3.1.1 Soils
         A total of one (1) borehole (Bore 1) was drilled within the northern portion of the site (due to limited rig
         access) to 6.0 m below ground level (bgl). Two additional dynamic cone penetrometer (DCP) tests were
         carried out within the southern portion of the site.

         The subsurface profile encountered generally comprised medium dense silty sand fill overlying medium
         dense to dense silty sand fill to approximately 0.9 m in depth. Natural medium dense silty sand was
         encountered to 3.7 m depth overlying dense silty sand to 4.7 m depth. Very dense silty sands were
         encountered to the termination depth of 6.0 m (Bore 1 only). DP reports, that similar conditions were
         reported within the DCP holes, with relatively loose conditions encountered to 1.5 m depth.

         As part of the Preliminary Geotechnical Investigation (2021), Acid Sulfate Soil (ASS) samples were
         collected at 0.25 m intervals in Bore 1 to 4.0 m depth. A total of sixteen (16) samples were collected for
         ASS screening and four (4) samples were selected for further analysis by the Chromium Reducible Sulfur
         suite (CRS). Titratable actual acidity (TAA) concentrations were reported to be between 9 moles H+/tonne
         and 26 Moles H+/tonne, with one exceedance of the relevant QASSIT action criterion of 18 moles
         H+/tonne in Bore 1 at 1.0 m depth. Therefore, actual acid sulfate soils (AASS) should be expected to be
         present to at least 1.0 m depth bgl. Reported oxidisable sulfur concentrations reported as SCr ranged
         from 0.06 %S to 0.18 %S, all above the relevant action criterion of 0.03% S. The results indicate the
         presence of potential acid sulfate soils (PASS) to at least 3.25 m bgl.

         ADG notes that the testing was limited to one borehole with ASS testing to 4.0 m depth. DP summarised
         that within this depth profile both the existing sand fill and natural silty sands are considered to contain
         ASS and that neutralisation, using ag lime or similar will be required at a rate of 9.5 kg/m3 for the upper
         fill profile and at a rate of 12.5 kg/m3 for the natural silty sands on the site. In addition, to treatment of
         the excavated soil, a guard layer of ag lime (rate 4 kg/m3) should be applied to the basement excavation.

         It is expected that ASS impacted material will be excavated and removed from site for appropriate
         treatment and disposal at a licenced facility due to available area constraints on site – further information
         on the liming rate (if required) is available in Section 7.5.3 of the Preliminary Geotechnical Report
         prepared by DP. Given that ASS material has been identified within the sub‐soil profile, any leachate
         generated on the site must be suitably treated/neutralised before leaving the site and must not be
         directly discharged to stormwater.
3.1.2 Groundwater
         During drilling activities for the Preliminary Geotechnical Investigation, groundwater seepage/inflow was
         encountered at 1.60 m depth below the ground surface, which corresponds to an elevation of
         approximately 0.5 m AHD (Douglas Partners, 2021).




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                        Page 4

Page 9

                                                                                          ADG Consulting Pty Ltd


3.2   Groundwater quality
      In the absence of any localised monitoring well data, and based on numerous groundwater investigations
      and dewatering monitoring projects that have been undertaken by ADG throughout the Noosa Coast
      Region in recent years, our understanding of the groundwater quality in the region is provided below:
           Groundwater is generally mildly acidic to neutral, with pH levels ranging from approximately 5.5 to
            6.5 and electrical conductivity ranging from brackish to saline between 2,000 µS/cm to
            48,000 µS/cm. Groundwater pH has the potential to reduce (become more acidic) following
            oxidisation of PASS as dewatering progresses, particularly if re‐wetting of the soils occurs.
           Dissolved oxygen levels in static groundwater typically range from approximately 35 – 40 %
            saturation.
           The groundwater associated with indurated sand strata is moderately to highly turbid as a result of
            staining and organic content.
           Concentrations of dissolved metals are typically below the available marine water trigger values
            (MWTV’s) provided in ANZECC/ARMCANZ (2000) for the receiving waters, however elevated levels
            of aluminium and particularly iron are expected in the untreated groundwater and have the
            potential to increase following oxidisation of PASS as dewatering progresses or as a result of existing
            acidic groundwater conditions.
           Given the location and previous use of the site, groundwater impacts resulting from site
            contamination are not anticipated.
      A groundwater investigation will be undertaken at the commencement of dewatering as described in
      Section 6.5.2 of this report. This assessment will be representative of the groundwater being extracted
      and treated from the entire site, as opposed to localised monitoring well data which is often misleading.
      Based on previous experience with dewatering in the area, ADG expects the groundwater to require
      treatment to increase pH and dissolved oxygen levels, as well as reduce turbidity, suspended sediments
      and dissolved metal concentrations prior to being discharged to the Noosa River.




 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                       Page 5

Page 10

                                                                                           ADG Consulting Pty Ltd


4        Water quality objectives
4.1      Receiving environment
         It is proposed to discharge extracted groundwater directly into the Noosa River adjacent to site.

         Based on the stormwater mapping available via the Noosa Council Enterprise Mapping System
         (Intramaps) there is a stormwater gully pit located north of 40 Mossman Court. This stormwater pit
         terminates within the Noosa River (<60 m) directly north of the gully pit. The exact location of the
         receiving waters/environment will be confirmed on commencement of dewatering; however, it is
         considered most appropriate that the site will discharge directly to the Noosa River adjacent south.

         The receiving environment in this location identifies as a moderately disturbed, middle estuary
         environment. The following section establishes water quality objectives (WQOs) to ensure that the
         environmental values of the receiving waters are protected and maintained.
4.2      Development of water quality objectives
         WQOs have been developed to support and protect the designated environmental values (EVs) for the
         receiving environment. The WQOs are based on a moderately disturbed level of protection for enclosed
         coastal/lower estuaries. The WQOs have been developed with reference to the following guideline
         documents:
              Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2018. (ANZG 2018) The
               selected trigger values apply to moderately disturbed systems to provide a 95% level of species
               protection for marine waters.
              Environmental Protection (Water & Wetland Biodiversity) Policy 2019. 2019. Noosa River
               environmental values and water quality objectives. DES.
              Noosa River environmental values and water quality objectives. 2022. DES.
              Queensland Water Quality Guidelines, Version 3, September 2009. 2013. DEHP.
         The Australian and New Zealand Guidelines for Fresh and Marine Water Quality by the Australian and
         New Zealand Environment and Conservation Council and Agriculture and Resource Management Council
         of Australia and New Zealand (ANZECC/ARMCANZ, 2000), has undergone review, with the publication of
         the 2018 version. The revised Australian and New Zealand Guidelines for Fresh and Marine Water Quality
         2018 is a joint initiative between the Australian and New Zealand Governments and Australian state and
         territory governments (ANZG, 2018) and supersedes the ANZECC/ARMCANZ 2000 publication. Where
         ANZECC/ARMCANZ (2000) is referenced, the relevant sections are still relevant and consistent with the
         updated ANZG 2018 publication, as referenced in the ANZG 2018 publication.

         The Queensland Water Quality Guidelines 2009 (DEHP, 2013) was made pursuant to the provisions of the
         Environmental Protection (Water) Policy 1999 (the EPP(Water)), which is a subordinate legislation under
         the Environmental Protection Act 1994 and was developed as the State response to the
         ANZECC/ARMCANZ (2000) Guidelines. The EPP(Water) provides a framework for:
              Identifying environmental values for Queensland waters, and deciding the water quality objectives
               to protect or enhance those environmental values.
              Including the identified environmental values and water quality objectives under Schedule 1 of the
               EPP (Water).
         WQOs are long term goals for surface water quality management. They are indicators established for
         receiving waters to support and protect the designated Environmental Values (EVs) for those waters. DES
         (2022) describes that for slightly to moderately disturbed waters, the guideline values should be
         compared with the median of values at a test site, whilst ANZG (2018) stresses that the aquatic ecosystem
         guideline values are triggers to further action, are inherently conservative, and that the response to non‐
         compliance should match the magnitude and impacts (if any) of the exceedance.




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                     Page 6

Page 11

                                                                                                          ADG Consulting Pty Ltd


      Regardless of the WQOs adopted in this DMP, the General Environmental Duty set out in the EP Act is
      paramount, which requires that “a person must not carry out an activity that causes or is likely to cause
      environmental harm unless the person takes all reasonable and practicable measures to prevent or
      minimise the harm”.
4.3   Proposed water quality objectives
      The proposed water quality objectives that have been developed for the discharge of extracted
      groundwater from the site are provided in the Tables below. All water discharged from the site must
      comply with the discharge criteria provided in Table 2. In addition, the receiving water quality within a
      20 m radius of the discharge point entry to the receiving water shall comply with the receiving water
      criteria provided in Table 3. Receiving waters data will be assessed against background monitoring data
      if non‐compliant results are obtained at the receiving waters monitoring location.

      Table 2 Discharge criteria

                               Parameter                                                        Criteria

        Physico‐chemical
        pH (pH units)                                                                          6.5 – 8.51
        Dissolved oxygen (% saturation)                                                           ≥802
        Suspended solids (mg/L)                                                                  ≤501,2
        Turbidity (NTU)                                                                           ≤502
        Litter                                                                               None visible
      Table notes:
      1. QWQG 2009 (2013) Refer to Table 8.2.1. Summary of design objectives for management of stormwater quality and flow –
         construction phase of development in Queensland.
      2. Typical discharge criteria recognised throughout Queensland & NSW.

      Table 3 Receiving waters criteria

                               Parameter                                                        Criteria

        Physico‐chemical
        pH (pH units)                                                                          7.8 – 8.31
        Dissolved oxygen (% saturation)                                                        85 – 1051
        Suspended solids (mg/L)                                                                   ≤141
        Turbidity (NTU)                                                                            ≤61
        Dissolved metals (µg/L)
        Aluminium                                                                   No relevant ANZG criteria available

        Arsenic                                                                                   2.32*
        Cadmium                                                                                   5.52
        Chromium                                                                                  4.42
        Copper                                                                                    1.32
        Iron                                                                        No relevant ANZG criteria available

        Lead                                                                                      4.42
        Nickel                                                                                     702
        Zinc                                                                                        82
        Mercury                                                                                   0.42
        Totals metals (µg/L)
        Aluminium                                                                        No ANZG criteria / 2003

        Iron                                                                             No ANZG criteria / 3003




 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                                     Page 7

Page 12

                                                                                                          ADG Consulting Pty Ltd


     Table notes:
     1. DES (2022). Noosa River environmental values and water quality objectives (canal, harbour or marina).
     2. ANZG (2018). Supersedes ANZECC/ARMCANZ (2000) ‐ Marine water trigger values for 95% species protection.
     3. Criteria subject to expected condition in Development Application (DA) notice by Noosa Shire Council.
     * = Insufficient data to derive a reliable trigger value. Low reliability value adopted (refer ANZECC/ARMCANZ (2000) Section
     8.3.7.

     Although ADG has not been provided a copy of the DA notice and conditions for the proposed
     development, based on previous dewatering projects in the Sunshine/Noosa Coast Region it is expected
     that total iron and aluminium concentrations as listed in Table 3 (above) are likely to be conditioned by
     Noosa Shire Council for compliance. It should be noted, that these concentrations are considered to be
     onerous with respect to the risk‐based (worst‐case) bioavailable trigger value criteria contained in ANZG
     2018 & ANZECC/ARMCANZ (2000) for marine water (moderately disturbed) 95% species protection, and
     are likely to be difficult to achieve given the groundwater conditions encountered in the locality on
     previous dewatering projects on the Sunshine/Noosa Coast.

     Prior to discharge to the stormwater system or any waterway, discharges are to be tested to meet the
     requirements of the ANZG 2018 & ANZECC/ARMCANZ (2000) Guidelines for Fresh and Marine Water
     Quality. There is currently no chemical toxicant trigger value criteria available for total or dissolved (i.e.
     bioavailable) concentrations of aluminium or iron for marine or estuarine waters under the Australian
     and New Zealand Guidelines for Fresh and Marine Water Quality Guidelines (ANZG 2018 &
     ANZECC/ARMCANZ 2000 – i.e. ANZECC Guidelines) or the Guidelines for Managing Risks in Recreational
     Waters (NHMRC 2008), with regards to managing environmental impacts to the waterway.

     In addition, Section 5 (Guidelines for recreational water quality and aesthetics) of the ANZECC/ARMCANZ
     (2000) Guidelines (per section 5.2 thereof) was superseded by the Guidelines for Managing Risks in
     Recreational Water in 2008 (NHMRC, 2008). Therefore, a reference to the ANZECC/ARMCANZ (2000)
     Guidelines is by association and extension a reference to the current 2008 NHMRC Guidelines. The 2008
     NHMRC Guidelines contain no criteria for aluminium, and only includes an aesthetic criterion for iron –
     noting this is an aesthetic criterion derived from the Australian Drinking Water Guidelines on the basis of
     ingesting 2L of the recreational water solution per day. ANZECC/ARMCANZ (2000) Section 5.2.3.3, notes
     that as a general guideline, under Toxic Chemicals, ‘Higher concentrations of toxicants may be tolerated
     occasionally if it assumed that no person will ingest more than a maximum of 100 mL water during a
     normal swimming session (NHMRC 1990) compared with 2L/d for potable water’, and Section 3.1.1.3,
     under Risk based approach of the guidelines, ‘The guideline trigger values are based on bioavailable
     concentrations, and hence are relatively conservative when compared with total concentrations in the
     field, so the use of the decision frameworks will increase guideline concentrations in most cases’.
     Therefore, any chemical toxicant trigger values would require reassessment and likely increase upwards
     of any ANZG 2018 &/or ANZECC/ARMCANZ (2000) Guideline trigger values due to the slightly to
     moderately disturbed nature (and thereby reduced sensitivity) of the receiving waters.

     In conditioning more onerous criteria, rather than the available marine chemical toxicant trigger value
     criteria contained within the ANZG/ANZECC Guidelines, an unachievable constraint may be placed on the
     development. This DMP has allowed for contingency measures to be incorporated into the treatment
     and discharge system if required, including silt curtains to be installed within the receiving waterway
     surrounding the discharge location, or further onsite treatment measures such as filtration, to prevent
     and/or minimise as far as reasonably practicable the potential for release of suspended solid loads into
     the broader receiving waterway.




ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                                               Page 8

Page 13

                                                                                           ADG Consulting Pty Ltd


5        Dewatering methodology
5.1      Basement excavation and shoring
         It is understood that the excavation/basement perimeter will be stabilised along the perimeter of the
         basement excavation using interlocking steel sheet piles. Excavations to facilitate the construction of the
         basement level will extend to a maximum of approximately 2.70 m below ground level (approx.
         2.2 m AHD), which corresponds to a maximum elevation of ‐0.5 m AHD (basement floor level ‐
         0.15 m AHD; allow 350 mm for slab). Localised deeper excavations may be required for construction of
         other structural elements (i.e. footings & pile caps). Refer to Design Plans, Appendix C.

         It is expected that the development will include a ‘tanked’ basement to prevent the requirement for a
         permanent dewatering facility at the site.
5.2      Groundwater extraction
         Dewatering will be undertaken using a series of 40 mm diameter PVC spears installed to below maximum
         excavation depth at 1.5 m intervals around the internal and external perimeter of the basement
         excavation.

         The basement excavation must be dewatered to a minimum of 1.0 m below the deepest point of
         excavation to allow construction to be undertaken in dry conditions. The water table (approx. 0.5 m AHD)
         is therefore expected to be lowered by minimum of approximately 2.0 m to around ‐1.5 m AHD.
5.3      Extraction/discharge rates and volume
5.3.1 Dewatering extraction calculation based on subsurface soil profile
         The dewatering extraction rate, area of influence and cone of depression has been estimated using the
         Western Australian Department of Water and Environmental Regulation Cone of Depression Calculator.

         The calculation results are based on the following parameters (as provided by ADS) and known site‐
         specific conditions. The following is applicable to the basement excavations spanning across the lot:

               Approximate length of excavation = 23 m
               Approximate width of excavation = 20 m
               Reduction in depth of groundwater across the basement footprint/excavation = 2.1 m
               Approximate depth of saturated aquifer = 16 m (standardised conservative value applied)

         The soil profile comprised predominantly of fine to medium sands, has a hydraulic conductivity of
         8.2 m/day, or equivalent 0.0000949 L/sec (WA Calculator). The results of this calculation are shown in
         Table 4 below, and a copy of the output is provided in Appendix D.

         Table 4 Dewatering extraction rate results

                                   Output                                              Result

          Dewatering radius of influence (m)                                             61
          Discharge rate (L/sec)                                                         12
          Discharge rate (L/hr)                                                        43,200
          Establishment of cone of depression (hours)                                    35


         Based on the above inputs, a groundwater flow rate of approximately 12 L/sec or 720 L/min or
         43,200 L/hr has been predicted for the development.

         However, it should be noted that the WA Calculator provides a conservative assessment of inflows to an
         excavation footprint based on area and depth, but does not take account of the method of perimeter
         piling i.e. sheet pile/concrete secant wall, which will inhibit lateral inflows. Also note that the cone of


    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                     Page 9

Page 14

                                                                                        ADG Consulting Pty Ltd


      depression radius measure includes water table depressions of 1 mm depth or more, so any significant
      depression of the water table is limited to much closer to the spear point dewatering spears (generally
      within 3 to 10 m from the sheet pile wall in fine‐medium grained sands, depending on density of the
      strata).
5.3.2 Dewatering discharge rate based on stormwater system size (estimation)
      It is expected that the stormwater network on Mossman Court (designated stormwater discharge
      location) has a maximum flow capacity of approximately 81 L/sec (i.e. based on a 300 mm diameter
      stormwater network pipe and an unknown install grade, calculated using minimum grade of 0.5 % as per
      AS 3500.3, however likely to be greater).

      A conservative estimate of 12 L/sec or 43,200 L/hr has been calculated by ADG – refer to Section 5.3.1
      above.
5.3.3 Conclusions on expected extraction rates
      It is recommended that the conservative estimate of 43,200 L/hour be adopted based on the sand profile
      encountered during the sub‐surface investigations onsite. Based on previous dewatering projects
      undertaken by ADG and ADS within the area, it is anticipated that initial flow rates will reduce to between
      500 – 650 litres/minute following the initial drawdown of the water table.

      The estimated discharge rate as determined in the above section 5.3.1, is well below (14.8 %) the Council
      stormwater infrastructure capacity estimate (81 L/sec), therefore it is considered unlikely that discharge
      of extracted groundwater from the site to the stormwater network on Mossman Court will cause any
      disturbance/damage to council infrastructure or risk to the public. The likelihood of overtopping the
      stormwater network and/or adjacent gully pits is considered unlikely because any such occurrences
      would be limited to instances of extreme rainfall intensity, which are generally of short duration, and in
      such a circumstance stormwater runoff would be expected to first utilise the remaining stormwater
      network capacity (some approximately 69 L/sec), and any excess flow would then drain via the kerb and
      channel to adjacent gully pits.

      Any risks to the public associated with the placement of dewatering equipment to enable discharge to
      the designated stormwater gully pit, should be mitigated by fencing and signage, have appropriate
      lighting in place for after site hours and may need pipe over ramps to the pathway and/or driveways
      where header pipe is to be placed in roadside guttering.
5.4   Dewatering duration
      Dewatering will be necessary throughout the basement construction phase, which is expected to require
      dewatering for approximately 10 to 12 weeks. To minimise the potential impacts during construction of
      short‐term dewatering, periods of active dewatering will be minimised as much as possible. However,
      ADG notes that once active dewatering has commenced, dewatering will not be able to be ceased until
      both: a) the basement hydrostatic uplift forces have been compensated to the satisfaction of the
      consulting RPEQ engineer; and b) potential hydraulic loading on the external face of the sheet pile shoring
      system has been compensated to the satisfaction of the consulting RPEQ engineer and shoring
      contractor.
5.5   Groundwater drawdown
      Groundwater drawdown caused by dewatering has the potential to create settlement in unconsolidated
      sediments and loose sands. Groundwater drawdown may also oxidise potential acid sulfate soils within
      the cone of depression, subsequently producing acidic groundwater conditions and mobilising heavy
      metals. Monitoring of the extracted untreated groundwater will be undertaken to detect potential in‐situ
      oxidation, as required and at the frequencies stated in Section 6.5.2.




 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                    Page 10

Page 15

                                                                                      ADG Consulting Pty Ltd


5.6   Groundwater treatment
      All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
      stormwater network. The following treatment measures will be adopted, and will be installed and
      operational prior to the commencement of dewatering:

      1.    A groundwater pH buffering treatment system (primary treatment)
      2.    A sedimentation tank to provide additional residence time and sedimentation (secondary
            treatment).
      3.    Installation of fine media filtration to retain suspended sediments and/or heavy metals (tertiary
            treatment), if required.

      Details of the treatment systems and methodologies are provided in Section 0 of this report.

      Note: Consideration should be taken, regarding placement of treatment gear on site to enable easy
      cleaning and maintenance throughout the dewatering phase for the project. Consider the potential
      requirement for regular de‐sludging of sedimentation tank/s to suitable area onsite, if available (cost
      minimisation).




 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                 Page 11

Page 16

                                                                                            ADG Consulting Pty Ltd


6        Water quality management
6.1      Responsibility
         The Site Manager is ultimately responsible for implementing the water quality management procedures
         described in this DMP.
6.2      Operational policy
         To prevent impacts on the receiving waters by effectively treating all extracted groundwater prior to
         discharge from the site.
6.3      Performance criteria
         The performance criteria for the discharge of extracted groundwater are the water quality objectives
         provided in Table 2 and Table 3 in Section 4 of this report. Both the discharge and receiving waters (within
         a 20 m radius of the stormwater discharge point) will be assessed against the WQOs to ensure that the
         environmental values of the waterway are maintained. Receiving waters data will also be assessed
         against background monitoring data if non‐compliant results are obtained at the receiving waters
         monitoring location.
6.4      Implementation strategy
         All extracted groundwater will be treated on‐site using available technologies prior to discharge to the
         stormwater network. The treatment system described in Section 6.4.1 will be adopted, installed and
         operational prior to the commencement of dewatering.
6.4.1 Groundwater treatment systems
         Primary treatment
         A groundwater treatment system will be installed to provide primary treatment of the extracted
         groundwater. The system will provide the following capabilities:

         1.    A baffled treatment tank with 5 kL minimum capacity
         2.    Automated in‐line chemical dosing systems for the addition of buffering solutions and coagulants
         3.    A filtration system to reduce fine particulates (if required)
         4.    Emergency response alarms for non‐routine situations.

         Based on the estimated extraction rate, a 5 kL system will provide approximately seven minutes contact
         time during the initial chemical dosing, prior to secondary treatment using a sedimentation tank.
         Secondary treatment
         A sufficiently sized sedimentation tank will be utilised to provide the necessary residence time for
         secondary treatment of the groundwater prior to discharge to the stormwater system. Based on the
         estimated groundwater extraction rate of approximately 43,200 L/hr (equivalent 720 L/min) from section
         5.3.3 of this report, a 23 kL sedimentation tank will provide approximately thirty‐two minutes retention
         time following primary treatment of the extracted groundwater.
         Tertiary treatment – may be required following initial testing of extracted groundwater.
         A filtration treatment system with specialised fine filtration media and chlorine dosing will be utilised to
         provide the required heavy metal removal (specifically for total and dissolved iron) where not
         precipitated and retained within the sedimentation tank/s (secondary treatment). This treatment system
         will provide tertiary treatment of the groundwater prior to offsite discharge.

         Tertiary treatment will only be required if the required water quality is unable to be achieved following
         primary and secondary stages of treatment. Subject to the results of field and laboratory testing during
         the pre‐discharge monitoring event.




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                     Page 12

Page 17

                                                                                           ADG Consulting Pty Ltd


6.4.2 Dewatering strategy
      The Site Manager, Dewatering Contractor and ADG Consulting must formulate a dewatering strategy to
      ensure that the dewatering treatment system is sufficient to meet the requirements of the project and
      that the necessary equipment can be accommodated within the site prior to the commencement of
      dewatering.
6.4.3 Initial pump‐out
      Prior to discharge of any extracted groundwater to the canal system, the following pre‐dewatering
      procedure will be undertaken:

      1. The basement area will be excavated down to the standing groundwater level.
      2. The initial dewatering discharge will be directed (via the treatment systems) into the excavation and
         allowed to infiltrate/recharge the aquifer. This process will provide initial clarification of the extracted
         groundwater as disturbed sediment loads are typically reduced following the initial pump‐out.
      3. Samples of the treated groundwater will be recovered and analysed for the parameters detailed in
         Table 2 and Table 3.
      4. The extracted groundwater will be directed into the stormwater system following confirmation that
         the water quality complies with the discharge criteria.
6.5   Monitoring
6.5.1 Visual monitoring
      Visual inspections of the site and dewatering equipment shall be undertaken daily by the Site Manager
      to identify the following:
           Quantity of chemical product within the dosing system
           Effective operation of all dewatering treatment equipment
           Short circuiting of water around baffles and filter media in sediment tanks, where required to be
            installed.
           Visible hydrocarbon sheens and odours
           Green blue or extremely clear water indicating high levels of dissolved aluminium.
6.5.2 Water quality monitoring
      Water quality monitoring will be undertaken for the duration of dewatering activities at the site by a
      suitably qualified and independent person. The monitoring will include analysis of the extracted
      groundwater, treated discharge water and off‐site monitoring in the receiving waters (in the mixing zone
      within a 20 m radius of the discharge point). The exact location within the receiving waterway (Noosa
      River) is to be confirmed, however it is anticipated to be directly south/adjacent of the site. Background
      water quality monitoring of field parameters will also be conducted during each sampling event, if
      applicable. Background samples will be recovered from the river, either upstream or downstream from
      the receiving water location (tide dependant).

      The proposed monitoring locations are shown in Figure 1, Appendix A are a subject to confirmation
      following mobilisation of dewatering gear to site.

      Monitoring will be undertaken at the following frequencies:


           Daily monitoring of field parameters (pH, and turbidity) in the treated discharge water and pH of
            the untreated extracted groundwater (to determine potential acidification). Daily monitoring will
            be undertaken by a suitably trained site employee under the supervision of the Site Manager.
           Weekly monitoring of field parameters (pH, electrical conductivity, dissolved oxygen, temperature
            and turbidity) in the untreated extracted groundwater, treated discharge water, receiving waters
            and background waters by ADG Consulting.


 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                        Page 13

Page 18

                                                                                            ADG Consulting Pty Ltd


           Weekly laboratory analysis of treated discharge water and receiving waters for suspended solids
            and dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium, copper, iron, lead,
            nickel, zinc and mercury). Total aluminium and iron will also be analysed for, if required.
           Pre‐discharge/initial monitoring of field parameters (pH, electrical conductivity, dissolved oxygen
            and oxidation‐reduction potential) in the extracted groundwater (prior to treatment) to assess
            changes in groundwater chemistry associated with PASS oxidation.
           Pre‐discharge/initial laboratory analysis of extracted groundwater (prior to treatment) for
            suspended solids, dissolved 0.45µm filterable metals (aluminium, arsenic, cadmium, chromium,
            copper, iron, lead, nickel, zinc and mercury) and for soluble sulfate and chloride to assess changes
            in groundwater chemistry associated with PASS oxidation. Total aluminium and iron will also be
            analysed for, if required.
           Laboratory analysis of untreated groundwater would also be performed periodically (monthly) if
            changes in untreated groundwater pH levels are detected that may indicate local acidification, and
            to determine any changes in local groundwaters that may require further investigation of potential
            environmental impacts.
      All samples will be recovered by a suitably qualified Environmental Scientist and submitted to a National
      Association of Testing Authorities (NATA) accredited laboratory for analysis.
6.5.3 Monitoring responsibilities
      The persons responsible for undertaking the compliance monitoring described in Section 6.5.2 above are
      shown in Table 5.

      Table 5 Monitoring responsibilities

                            Activity                          Frequency          Responsibility        Person

        Monitoring of field parameters in discharge water
                                                                  Daily           Site Manager      Site Manager
        and untreated extracted groundwater

        Monitoring of field parameters in untreated
                                                                                                   Environmental
        extracted groundwater, discharge water,                 Weekly           ADG Consulting
                                                                                                     Consultant
        receiving waters and background waters

        Laboratory analysis of samples recovered from                                              Environmental
                                                                Weekly           ADG Consulting
        discharge water and receiving waters                                                         Consultant

        Monitoring of field parameters in extracted                                                Environmental
                                                                Weekly           ADG Consulting
        groundwater (pre‐treated)                                                                    Consultant

        Laboratory analysis of samples recovered from       Initially, then as                     Environmental
                                                                                 ADG Consulting
        extracted groundwater (pre‐treated)                     required                             Consultant

6.6   Maintenance
      The groundwater treatment systems must be regularly maintained. Maintenance must include:
           Regular cleaning and or replacement of the filters within the filtration unit, where required to be
            installed.
           Regular removal of sediment from the sedimentation tank. The sediment must be either returned
            to the excavation pit for dewatering and bulking out with excavated material, or removed from the
            site by a licensed liquid waste contractor.
           Regular check of the dosing system and top‐up of buffering solutions and flocculants.




 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                      Page 14

Page 19

                                                                                         ADG Consulting Pty Ltd


6.7   Reporting
      Dewatering management procedures and monitoring results will be reviewed by ADG Consulting weekly
      to ensure that the treatment procedures are effective, and that the receiving waters are not being
      impacted by the extracted groundwater being discharged.

      The following reporting procedures will be adopted:
           A summary report will be prepared upon completion of the initial pre‐discharge monitoring. The
            report will be submitted to the Site Manager, Dewatering Contractor, and NSC upon request.
           Weekly interim reports will be prepared upon receipt of laboratory data for each round of ongoing
            compliance monitoring. The interim reports will display all data obtained during the previous
            monitoring event, and provide comments and recommendations based on the results.
           A dewatering compliance report will be prepared on completion of the project (upon request).
      The above reports will be prepared by ADG Consulting and provided to the Site Manager and Dewatering
      Contractor as they become available. The reports will include all water quality results and comparison to
      the WQOs, corrective actions and recommendations made to the Site Manager and Dewatering
      Contractor during the monitoring period.

      The Site Manager must keep records of complaints, volumes of chemicals used and treatment methods
      employed. These records must be available on‐site at all times and submitted to NSC by the Site Manager
      upon request.
6.8   Contingencies
      If water quality monitoring indicates ongoing exceedances of the performance criteria, and the water
      quality objectives for the receiving waters cannot be met, then corrective actions will be adopted as
      necessary. Possible contingencies may include one or more of the following:
           Installation of additional sedimentation tanks to provide increased residence time and assist with
            the retention of precipitated iron hydroxides, other heavy metals and/or suspended sediments.
           Installation of additional flocculant and/or coagulant dosing systems to assist in precipitation of
            suspended sediments and/or heavy metals.
           Installation of activated carbon filtration or other fine media filtration to retain suspended
            sediments and/or heavy metals.
           Install a floating sediment curtain/s around the stormwater termination point in the receiving
            waterway to prevent unsightly plumes and contain sediment and/or heavy metals for periodic
            removal (subject to approval by Noose Shire Council).
           Preventive and corrective actions shall be taken in the event that groundwater monitoring
            observations indicate that unexpected groundwater contamination has been encountered during
            dewatering. The most appropriate action(s) shall be dependent on the stage of construction and
            risk of adverse impacts to groundwater users and the receiving environment.
           Any modification to the dewatering system and pumping rates shall be in consultation with a
            suitably qualified scientist/geotechnical/engineer.
           Following heavy rainfall all ponded surfaces waters are to meet discharge criteria (Table 3) prior to
            offsite discharge. Where discharge criteria not met, Site Manager to obtain approval from
            Dewatering Contractor regarding treating surface waters with treatment gear before offsite
            discharge.
           Pumping systems and shoring works to be maintained in fit for purpose state by Dewatering
            Contractor and/or shoring contractor. In the event that dewatering equipment has failed and is
            likely to cause a significant impact on the environment, or surrounding properties (i.e. flooding) the
            Dewatering Contractor is to be contacted immediately. The Principal Contractor, in consultation
            with the Dewatering Contractor shall be responsible in rectifying the failure in a practicable time


 ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                     Page 15

Page 20

                                                                                     ADG Consulting Pty Ltd


           frame to minimise potential impacts. Equipment, spare parts, materials and tools necessary to
           manage aspects of the system/s which present a high risk of significant impacts in the event of
           failure (if any) shall be readily available.
          Construction vibrations could potentially cause settlement in the loose upper level sands, thereby
           damaging nearby structures founded in these strata. Prior to commencement of construction on
           site (including staged works), it is recommended that a detailed dilapidation survey be undertaken
           to establish the condition of all existing adjacent structures, roads and services.




ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                 Page 16

Page 21

                                                                                          ADG Consulting Pty Ltd


7        Noise & odour management
7.1      Responsibility
         The Project Manager is responsible for ensuring the appropriate management of noise and odour during
         dewatering operations.
7.2      Operational policy
         To minimise noise and odour emissions generated from the site during dewatering.
7.3      Performance criteria
         The appropriate criteria to measure the performance of dewatering management at the site are provided
         below.
         1.    No noise or odour related complaints received from neighbouring residents or the community.
         2.    No degradation of air quality due to fumes or odours emanating from the dewatering process.
7.4      Implementation strategy
         Noise and odour emissions will be managed as described in the following sections.
7.4.1 Noise
         All dewatering equipment must be operated appropriately and maintained in good working order. All
         dewatering systems and plant must be fitted with the appropriate noise reduction equipment to comply
         with the performance criteria. Non‐complying dewatering plant will be replaced or repaired as necessary.
7.4.2 Odour
         All dewatering plant must be fitted with the appropriate emission reduction devices. Where practicable,
         all dewatering plant will be sealed to prevent the release of odours to the atmosphere. Fine mist odour
         control sprays will be applied to reduce offensive odours if complaints are received from neighbouring
         residents.
7.5      Monitoring
         An inspection of the site and dewatering equipment shall be undertaken daily by the Site Manager to
         identify the following:
              Excessive noise being generated by the dewatering systems and plant; and
              Strong or offensive odours being generated by the dewatering equipment and/or extracted
               groundwater.
7.6      Reporting
         Reporting will be undertaken as described in Section 6.7 of this report.
7.7      Contingencies
         If noise levels consistently exceed the performance criteria, temporary acoustic barriers will be
         constructed around the offending dewatering systems and plant. Odour control sprays will be applied as
         necessary to mask odour emissions if complaints are received from neighbouring residents. This may
         include the direct injection of deodorisers to the groundwater treatment system.




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                 Page 17

Page 22

                                                                                          ADG Consulting Pty Ltd


8        Limitations
         ADG Consulting Pty Ltd has prepared this report for Metricon Homes QLD Pty Ltd in accordance with the
         agreed scope of work. The services performed by ADG have been conducted in a manner consistent with
         the normal level of care and expertise exercised by members of the environmental consulting profession.
         No other warranty or guarantee, expressed or implied, is made as to the professional advice included in
         this report.

         This report is solely for the use of Metricon Homes QLD Pty Ltd and ADG accepts no responsibility for the
         use of any part of this report for any other purpose or by third parties, as it may not contain sufficient
         information for the purposes of other parties or users. This report must only be presented in full, and
         may not be used for any other objective, except where prior written approval is obtained from ADG. This
         report does not comment on legal obligations, as legal advice can only be given by qualified legal
         practitioners.

         The information contained in this report is provided to minimise potential impacts on the receiving
         environment, however implementation of the described management procedures does not guarantee
         that the objectives will be achieved.

         The information contained in this report is considered to be accurate at the date of issue. Subsurface
         conditions, including contaminant concentrations can change in space and time, either through natural
         processes or by the accidental or intentional addition of contaminants to a site. Where conditions
         encountered subsequently at the site are significantly different from those reported herein, ADG must
         be notified and be provided the opportunity to review the conclusions and recommendations of this
         report.




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                                   Page 18

Page 23

                                                                                       ADG Consulting Pty Ltd


9        References
         ANZG 2018. Australian and New Zealand Guidelines for Fresh and Marine Water Quality. Australian and
         New Zealand Governments and Australian state and territory governments, Canberra ACT, Australia.

         ANZECC/ARMCANZ. 2000. Australian and New Zealand Guidelines for Fresh and Marine Water Quality.
         Australian and New Zealand Environment and Conservation Council and Agriculture and Resource
         Management Council of Australia and New Zealand.

         DES. 2019. Environmental Protection (Water & Wetland Biodiversity) Policy 2019. Department of
         Environment and Science, Queensland Government. Brisbane, Queensland, Australia.

         DEHP. 2013. Queensland Water Quality Guidelines 2009, Version 3. Department of Environment and
         Heritage Protection. Brisbane, Queensland, Australia.

         DES. 2018. Monitoring and Sampling Manual 2018, Version 2 June 2018. Department of Environment and
         Science. Brisbane, Queensland, Australia.

         Douglas Partners. 2021. Preliminary Geotechnical Investigation, Proposed Residence, 38 Mossman Court,
         Noosa Heads. Ref: 206126.00.R.001.

         Government of Western Australia. Cone of Depression. Department of Water and Environmental
         Regulation. Accessed 25/01/24, https://www.der.wa.gov.au/your‐environment/acid‐sulfate‐soils/66‐
         cone‐of‐depression.

         NHMRC. 2018. Guidelines for Managing Risks in Recreational Water. Australian Government, National
         Health and Medical Research Council.

         Noosa Shire Council. Noosa Council Interactive Mapping, Stormwater Infrastructure. Accessed 6 October
         2021
         https://enterprise.mapimage.net/intramaps97/?project=Public&module=Noosa%20Plan%202020&conf
         igId=64251f07‐9411‐4a61‐930e‐2bd9b45d8fff&startToken=8117c0c9‐fb07‐4d6a‐a629‐b82dc6c64537




    ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24                                              Page 19

Page 24

                                                                      ADG Consulting Pty Ltd




     Appendix A:            Figures
                    Figure 1 Site and proposed monitoring locations




ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24

Page 25

Figure 1. Site and proposed
monitoring locations

 

Page 26

                                                         ADG Consulting Pty Ltd




     Appendix B:            DRDMW licenced bore search




ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24

Page 27

Licenced bore locations - 500 m radius                                                                   A product of

38 Mossman Court, Noosa Heads, Queensland
26°23'15"S 153°4'35"E                       26°23'15"S 153°5'24"E




                                                                         Legend located on next page




                                                                                                     0                     100 metres
                                                                                                           Scale: 1:4513

                                                                                                         Printed at: A3
                                                                                                     Print date: 6/10/2021
                                                                                          Datum: Geocentric Datum of Australia 1994
                                                                                            Projection: Web Mercator EPSG 102100
                                                                     For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
                                                                                                              us.html
                                                                    Includes material © State of Queensland 2021. You are responsible for ensuring that
                                                                    the map is suitable for your purposes. The State of Queensland makes no
                                                                    representation or warranties in relation to the map contents and disclaims all liability.
                                                                    If imagery is displayed, imagery includes material © CNES reproduced under license
                                                                    from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, 2019




26°23'49"S 153°4'35"E                       26°23'49"S 153°5'24"E                                 Department of Resources

Page 28

Licenced bore locations - 500 m radius
38 Mossman Court, Noosa Heads, Queensland
   Legend                                                         Attribution



                                                              Maxar
    Registered water bores [RDMW           Road
                                                              Includes material © State of Queensland (Department of Resources); ©
    and private]
                                              Highway         Commonwealth of Australia (Geoscience Australia); © 21AT, © Earth-i, all rights
                                                              reserved, 2021.
       Artesian bore                          Main
       Artesian bore (abandoned but                           © State of Queensland (Department of Resources) 2021
                                              Local
    useable)                                                  © State of Queensland (Regional Development, Manufacturing and Water) 2021
                                              Private
       Artesian bore (abandoned and
    destroyed)                             Cities and Towns

       Artesian bore, ceased to ow

       Artesian bore, ceased to ow
    (abandoned but useable

       Artesian bore, ceased to ow
    (abandoned and destroyed)
       Sub-artesian facility
       Sub-artesian facility (abandoned
    but useable)
       Sub-artesian facility (abandoned
    and destroyed)
       Surface water facility
       Surface water facility (abandoned
    but useable)
       Surface water facility (abandoned
    and destroyed)

    Road Crossing

       Bridge
       Tunnel

    Railway

Page 29

                                                        ADG Consulting Pty Ltd




     Appendix C:            Design Plans




ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24

Page 30

THE SITE


                             Issue:




                             SCG HOLDINGS PTY LTD T/A
                                                                  Unit 1/11 Project Ave,
                                                                  Noosa Heads
                                                                  Ph (07) 5455 5604
                                                                  email:[email protected]
                                                                  web:www.scg-engineers.com
                                                                  ABN 68 669 675 790




                                        Title:




                                     Project




                                     Date:              Drawn                Design

                                       Checked:         Drg No.                        Rev.




           Rev. - 10.06.16

Page 31

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                               Unit 1/11 Project Ave,
                                                               Noosa Heads
                                                               Ph (07) 5455 5604
                                                               email:[email protected]
                                                               web:www.scg-engineers.com
                                                               ABN 68 669 675 790




                             Title:
                                             CONSTRUCTION NOTES


                          Project




                          Date:                      Drawn                Design

                            Checked:                 Drg No.                        Rev.




Rev. - 10.06.16
                                                                       CN

Page 32

                                                                                                                                                   CANAL                                      TIMBER
                                                                                                                                                                                              JETTY




                                                                                                                                                                               CONCRETE
                                                                                                                                                                               BOLLARDS



                                                                                                                                                                             0.50
                                                                        0.50                                                                                 0.75
                                                                           0.75                                                                             1.00
                                                                              1.00                                                                         1.25
                                                                               1.25                                                                                                                                                                                                      0.500.49
                                                                TOP                                                                                     1.50 OF                                                                                                        CONCRETE




                                                                                                                                                                                                                                                                                                        L
                                                                                                                                                                                                                                                                                                       AL
                                                                                                                                                                                                                                                 BANK                  RAMP
                                                                                                                                                                                                                              1.5




                                                                                                                                                                                                                                                                                                    W
                                                                                              0                                                                                                      EXISTING
                                                                                                                                                                                                                                       0 236°19'                                    0.75




                                                                                                                                                                                                                                                                                                  CK
                                                                                           1.5




                                                                                                                                                                                                                                                                                                RO
                                                                                                                                                                                                     CONCRETE
                         1.38 2.22                                                                                             230°48'                                                               RETAINER                             6.212                              1.0




                                                                                                                                                                                                                                                                                               NG
                                                                                                                               26.234                                               1.60
                                                                                                                                                                                                                                                              STEPS                 0




                                                                                                                                                                                                                                                                                             TI
                                                                                                                                                                                                            1.96                                                                1.04




                                                                                                                                                                                                                                                                                         IS
                                                                                                                                                                                                                                                                     1.2




                               WALL
                                                                                                                                                                                                                                              1.74




                                                                                                                                                                                                                                                                                        EX
                                                                                                                                                                              1.19
                                                                                                                                                                           1.17       2.20 2.20                                                                             5
                                                                                           TIMBER                                                                                2.22           PAVERS                                                 2.19
                                                                                                                                                                                                                                                              2.72
                                                                                                                                                                                                                           EXISTING                                  2.95




                                                                                                                                                                                                                                                                                L
                                                                                                                                                                                         25
                                                                                           DECK




                                                                                                                                                                                                                                                                             AL
                                                                                                                                                                                    2.
                                                                                                                                                                                                                           CONCRETE




                                                                                                                                                                                                                                                                            W
                                                                                                                                       PATIO                                                                                                         2.22
                                                                                                                                                                                                                           RETAINER
                                                                                                                                                                                GATE                                                                        2.81
                                           2.23
                                                                                                                                                                                                                                          2.25
                                                                                                                                                                                                                                                     2.80

                                                                                                                                                                                                                                              2.80 2.94




                                                                                                                                                                                                                                     28
                                                                                                                                                                                                                                   2.
                                                                                                                                                                                                                                       2.80
                                                                                                                                                                                                       POOL




                                                                                                                                                                                                                                    EN
                                                                                           TWO STOREY




                                                                                                                                                                                                                                  RD
                                                            PAVERS




                                                                                                                                                                                                                                       03 '
                                                                                                                                                                                                                                     .6 03
                                                                                           RENDERED HOUSE




                                                                                                                                                                                                                              GA


                                                                                                                                                                                                                                   30 5°
                                                                                                                                                                                                                            2.80
                              137°23'
                      CONCRETE 29.05                                                       IRON ROOFING




                                                                                                                                                                                                                                    35
                                                                                           FL = 2.23                                                                                                                       2.94




                                                                                                                                                                                                                                  TE
                                                                                                                                                                                                                   27




                                                                                                                                                                                                                             RE
                                                                                                                                                                                                                 2. 2.84




                                                                                                                                                                                                                           NC
                                                                                                                                                                                                      2.29




                                                                                                                                                                                                                       CO
                                           2.17                                                                                                                                                              2.83
                                                                                                                                 PAVERS
                                                                                                                                                  .25                                                 2.82
                                                                                                                        2.25                    2                                             2.28




                                                                                                                                                                                                            13
                                                                                                                                                                                                        3.
                                                                                                                                                                                                     2.28
TWO STOREY
BRICK HOUSE
                                            PEBBLE GARDEN




                                                                                                                                 GATE
TILE ROOFING
                                                                                                                                                               GARAGE




                                                                                                                  2.23 2.53
                                                                                                                  2.22 2.22
                                                                                                                                     2.24
                                                                                                                                 2.22
                                                                                                                                                                                              TWO STOREY
                                                                                                                                                                                              RENDERED HOUSE
                                                                                                                  2.60         2.23                                                           IRON ROOFING
                                                                                                               2.28
                                                                                                       2.27




                                                                                                                                                               2.28
                                                                     2.2
                                                                                                               2.72
                                                                                                               2.86




                                                                         5


                                                                                                                                                     2.25
                                                                                                                               2.21




                                                                                                                                                                      65
                                                                                                    2.27
                                           2.20




                                                                                                                                                                NG 2.
                                                                           PAVERS                   2.22
                                                                                                               2.80




                                                                                                                              2.61
                                                                                                              2.70




                                                                                                                                                              TI
                                                                                                                                                                                                                                                                                                                              THIS DRAWING AND ASSOCIATED DETAILS

                                                                                                                                                            57
                                                                                                                                                           IS
                                                                                             2.26   GARDEN 2.61
                                                                                                                                                         2.
                                                                                                                                                2.24

                                                                                                                                                        EX
                                                                       2.25                                                                                                                                                                                                                                                   MUST BE READ IN CONJUNCTION WITH
                                                                                   2.82 2.91
                                                                                                                                                2. 23

                                                                                               2.20                                                                                                                                                                                                                           THE NOTES CONTAINED ON 0405-N.
                                                                                                                                                  24
                                                                2.23        2.83 2.88
                                                                                                                                                 2.
                                                                                                        2.5.63




                                                        2.22
                                EXISTING




                                                                                                        2.1 8




                                                                                                                                            2.23
                                                                                                .50
                                                                      2.81
                                                                                                            9




                                                   2.20
                                                                                                          2




                                                                  2.86
                                                         2  . 7 9             2.74            2                                               2.30
                                                  2.19 2
                                                          .7  1
                                                                                      8° 1 5' 2.25                    76°52'
                                             GATE       2.75                         2 .598                           3.053
                         2.28                                           GARDEN       11   PAVED
                                           2.17     2.20 2.19                             DRIVEWAY
                                                                                                                                                                                                                                                                                                                              Issue:
                                                                                                                        2.22
                                                                             2.25




                                                                                                                                            2.23
                                                                                                                      2.10                  2.09
                                                                                         2.18    2.07                          REF NAIL IN
                                                                                       2.18   R/WATER                          EDGE/BITUMEN
                        R/WATER                                            2.15              OUTLET                            RL 2.10 AHD




                                                                                                                                                                                                                                                                                                                              SCG HOLDINGS PTY LTD T/A
                        OUTLET x2                                                            IL=2.05                                                                                                                                                                                                                                                               Unit 1/11 Project Ave,
                                                                                    2.02                                                                                                                                                                                                                                                                           Noosa Heads
                        IL=1.98 2.13                                                                                                                                                                                                                                                                                                                               Ph (07) 5455 5604
               2.11                                                                                                                                                                                                                                                                                                                                                email:[email protected]
                                                                 1.99                                                                                                                                                                                                                                                                                              web:www.scg-engineers.com
               1.97                                                                                                                                                                                                                                                                                                                                                ABN 68 669 675 790

                                 REF NAIL IN
                                 EDGE/BITUMEN                                                                                                                                                                                                                                                                                            Title:
                                 RL 1.97 AHD


                                                                                                                                                                                                                                                                                                                                      Project




                                                                                                                                                                                                                                                                                                                                      Date:              Drawn                Design

                                                                                                                                                                                                                                                                                                                                        Checked:         Drg No.                        Rev.




                                                                                                                                                                                                                                                                                                            Rev. - 10.06.16

Page 33

                                                                  236°19'
                                                     230°48'       6.212
                                                     26.234




                                                                   03 '
                                                                 .6 03
                                                               30 5°
137°23'
 29.05




                                                                35
                                                   2.61                                       THIS DRAWING AND ASSOCIATED DETAILS
                                    2.82 2.91                                                 MUST BE READ IN CONJUNCTION WITH
                                   2.88            2.20                                       THE NOTES CONTAINED ON 0405-N.
                              2.83
                                          2.5.63
                                          2.1 8




                       2.81
                                              9
                                            2




             . 7 9 2.86        2.74
           2
          2.71
                8° 1 5'                         76°52'
          2.75 2 .598                           3.053
               11
                                                                                              Issue:




                                                                                              SCG HOLDINGS PTY LTD T/A
                                                                                                                                   Unit 1/11 Project Ave,
                                                                                                                                   Noosa Heads
                                                                                                                                   Ph (07) 5455 5604
                                                                                                                                   email:[email protected]
                                                                                                                                   web:www.scg-engineers.com
                                                                                                                                   ABN 68 669 675 790




                                                                                                         Title:




                                                                                                      Project




                                                                                                      Date:              Drawn                Design

                                                                                                        Checked:         Drg No.                        Rev.




                                                                            Rev. - 10.06.16

Page 34

Cut/Fill Summary
Name     Cut Factor Fill Factor2d Area                         Cut                 Fill                   Net
VOLUME 1.000                1.000               449.97sq.m 865.64 Cu. M. 11.45 Cu. M. 854.19 Cu. M.<Cut>
Totals                                          449.97sq.m 865.64 Cu. M. 11.45 Cu. M. 854.19 Cu. M.<Cut>
                                                                                                                           1.5                       0.75
                                                    .50                                                                         0 236°19'
                                                1              230°48'                                                             6.212       1.0
                                                               26.234                                                                                0
                                                                                                                                            1.2
                                                                                                                                               5

                                                                                                2   5
                                                                                             2.




                                                                  RESIDENTIAL
                                                                 DEVELOPMENT




                                                                                                                                    03 '
                                                                                                                                  .6 03
                                                                                                                                30 5°
              137°23'
               29.05




                                                                                                                                 35
                                                                           .25
                                                              2.25       2




                             2.2
                                 5




                                                                            2.25
                                                     2 .50
                                             8° 1 5' 2.25    76°52'
                                            2 .598           3.053
                                            11
                                     2.25




                                                                                                                                                                                      Issue:




                                                                                                                                                                                      SCG HOLDINGS PTY LTD T/A
                                                                                                                                                                                                                           Unit 1/11 Project Ave,
                                                                                                                                                                                                                           Noosa Heads
                                                                                    SITE PREPARATION, EARTHWORKS & COMPACTION
                                                                                                                                                                                                                           Ph (07) 5455 5604
                                                                                                                                                                                                                           email:[email protected]
                                                                                                                                                                                                                           web:www.scg-engineers.com
                                                                                                                                                                                                                           ABN 68 669 675 790
                                                                                                                                                            1.73
                                                                                                                                                               1.
                                                                                                                                                                                                 Title:




          DILAPIDATION REPORT:                                                                                                                                                                Project




                                                                                                                                                                                              Date:              Drawn                Design

                                                                                                                                                                                                Checked:         Drg No.                        Rev.




                                                                                                                                                                    Rev. - 10.06.16

Page 35

                                     236°19'
                       230°48'        6.212
                       26.234




                                      03 '
                                    .6 03
                                 3055°
137°23'
 29.05




                                  3
            ° 1 5'   76°52'
          28 .598    3.053
          11




                                                                 Issue:




                                                                 SCG HOLDINGS PTY LTD T/A
                                                                                                      Unit 1/11 Project Ave,
                                                                                                      Noosa Heads
                                                                                                      Ph (07) 5455 5604
                                                                                                      email:[email protected]
                                                                                                      web:www.scg-engineers.com
                                                                                                      ABN 68 669 675 790




                                                                            Title:




                                                                         Project




                                                                         Date:              Drawn                Design

                                                                           Checked:         Drg No.                        Rev.




                                               Rev. - 10.06.16

Page 36

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                             Title:




                          Project




                          Date:              Drawn                Design

                            Checked:         Drg No.                        Rev.




Rev. - 10.06.16

Page 37

                                                    236°19'
                                      230°48'        6.212
                                      26.234




                                                     03 '
                                                   .6 03
                                                3055°
               137°23'
                29.05




                                                 3
                          8 °1 5'   76°52'
                         2 .598     3.053
                         11




                                                                                Issue:




                                                                                SCG HOLDINGS PTY LTD T/A
                                                                                                                     Unit 1/11 Project Ave,
                                                                                                                     Noosa Heads
                                                                                                                     Ph (07) 5455 5604
                                                                                                                     email:[email protected]
                                                                                                                     web:www.scg-engineers.com
                                                                                                                     ABN 68 669 675 790




                                                                                           Title:




                                                                                        Project

PLUMBING ARTICULATION:


                                                                                        Date:              Drawn                Design

                                                                                          Checked:         Drg No.                        Rev.




                                                              Rev. - 10.06.16

Page 38

                  Issue:




                  SCG HOLDINGS PTY LTD T/A
                                                       Unit 1/11 Project Ave,
                                                       Noosa Heads
                                                       Ph (07) 5455 5604
                                                       email:[email protected]
                                                       web:www.scg-engineers.com
                                                       ABN 68 669 675 790




                             Title:




                          Project




                          Date:              Drawn                Design

                            Checked:         Drg No.                        Rev.




Rev. - 10.06.16

Page 39

                                                            ADG Consulting Pty Ltd




     Appendix D:            Dewatering calculation output




ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24

Page 40

Cone of Depression calculator

This tool can be used to calculate the groundwater cone of depression in potential acid sulfate soil areas.

Last updated: 2 May 2023

Preliminary assessment of the radial extent of the cone of depression and pumping rates and times for all Related page
dewatering operations is critical for assessing the risk of disturbing acid sulfate soils in potential acid sulfate

soil areas

Acid sulfate soils

 

Broad-scale acid sulfate soil risk maps for several coastal regions of WA are accessible via Data WAG Provided by
Empirical methods to calculate the radial extent of the groundwater cone of depression and pumping rates Department of Water and Environment
and times for dewatering operations are outlined in National Acid Sulfate Soils Guidance: Guidance for the Requistion
dewatering of acid sulfate soils in shallow groundwater environments
Share

Calculator f Xin &

Input

Length of excavation 23 metres

Width of excavation 20 metres

Drawdown required 2.1 metres

Aquifer thickness") 16 metres

Hydraulic conductivity: 0.0000949 metres/second

Results

Effective pumping radius, Re 12 metres

Cone of depression radius, R,, 61 metres

Total pumping rate 12. litres/second

Pumping time required 35 hours

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.