Original source · versioned page text
ADG1304.21 Dewatering Management Plan_Rev1.1_17.12.24
Plans and drawings: the text below has words only, no drawings.
Cone of Depression calculator This tool can be used to calculate the groundwater cone of depression in potential acid sulfate soil areas. Last updated: 2 May 2023 Preliminary assessment of the radial extent of the cone of depression and pumping rates and times for all Related page dewatering operations is critical for assessing the risk of disturbing acid sulfate soils in potential acid sulfate soil areas Acid sulfate soils Broad-scale acid sulfate soil risk maps for several coastal regions of WA are accessible via Data WAG Provided by Empirical methods to calculate the radial extent of the groundwater cone of depression and pumping rates Department of Water and Environment and times for dewatering operations are outlined in National Acid Sulfate Soils Guidance: Guidance for the Requistion dewatering of acid sulfate soils in shallow groundwater environments Share Calculator f Xin & Input Length of excavation 23 metres Width of excavation 20 metres Drawdown required 2.1 metres Aquifer thickness") 16 metres Hydraulic conductivity: 0.0000949 metres/second Results Effective pumping radius, Re 12 metres Cone of depression radius, R,, 61 metres Total pumping rate 12. litres/second Pumping time required 35 hours
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.