Delegated Report - Code - Planning OPW18 0093 · OPW18/0093

of 1

Text shows just the words. Original shows the document exactly as it was published.

Author	Coordinator Engineering, Mark Lewis
Development Assessment

APPLICATION DETAILS
Application No.	OPW18/0093
Applicant	Ryan Designer Homes Pty Ltd
Proposal	Operational Works - Vehicle Crossovers
Properly Made Date	26 April 2018
Information Request Date	Not required
Information Response Date	Not applicable
Decision Due Date	21 June 2018
Report Completed Date	24 May 2018
Number of Submissions	Not Applicable

PROPERTY DETAILS
Property Address	6 Mermaid Qy Noosaville Qld 4566
RP Description	Lot 120 RP 842150
Land Area	1099.0000 m²
Existing Use of Land	Residential (under construction)

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Locality	Noosaville
Zone	Detached Housing
Overlays	Natural Hazards (flooding and acid sulfate soils)
Assessment Type	Code
PROPOSAL
The application seeks approval for Operational Works - Vehicle Crossovers.
site details
Background
The site located at the corner of Mermaid Quay and Seamount Quay. The residence is currently under construction and includes 2 driveway crossovers, 1 in each frontage. The crossovers are proposed at 3.5m wide at the property boundary.
The 2 crossovers are set back sufficient distance from the tangent points in the kerb line to provide a safe traffic environment.
It is noted that some street trees will be affected by the works. The trees are not significant and suitable conditions from the Environment section have been included to replace any lost trees.
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017
The Noosa Plan.
The following codes from the Noosa Plan are applicable to this development:
Detached House Driveways Code
cONSULTATION
Referral Agencies
Not applicable
Other Referrals
The application was forwarded to the following internal Council officers:
Environment
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW18/0093 for Operational Works - Vehicle Crossover situated at 6 Mermaid Qy Noosaville Qld 4566 and described as Lot 120 RP 842150, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	OPW18/0093
Street address:	6 Mermaid Qy Noosaville Qld 4566
Real property description:	Lot 120 RP 842150
Planning Scheme:	The Noosa Plan (27 November 2017)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works - Vehicle Crossovers
CURRENCY PERIOD of approval
The currency period for this development approval is 2 years starting the day that this development approval takes effect.
assessment manager conditions
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
4386 Sheet 2 of 27	D	Proposed Site Plan prepared by Reitsma	16 March 2018
SITE SPECIFIC CONDITIONS
Driveway crossovers must be constructed generally in accordance with Council’s Standard Drawings RS-049 and RS-050. The driveways must not exceed a maximum width of 3.5m at the property boundary.
Engineering
A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting.
The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works;
Landscaping works;
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
traffic Management during the construction phase.
appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD)
provision for safe pedestrian access across the frontage of the site both.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works
The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development.
All works must be constructed and work procedure undertaken in accordance with:
the approved plans/documents and conditions detailed in this Decision Notice
all relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines
the latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
Works within Road Reserves
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Driveways
Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established.
The following must be complied with during the construction of the required crossover/driveway:
the driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete.
the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients.
the driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties
underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway
where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path
have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council.
any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor
any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway
Pavement design for privately owned works must be undertaken in accordance with the relevant standards.  Structural integrity of the driveways will remain the responsibility of the property owner/developer.
Stormwater Drainage
The constructed driveway must not cause additional ponding on the road formation or the road reserve.
Any proposed surface drainage grate must be located wholly within private property.
Environment (Erosion and Sediment Control)
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes).
Landscape
Removal of Existing Trees and Vegetation
Removal of 3 existing street trees and vegetation must occur as the crossover will impact on root zones and must include:
Stump grinding to below finished surface level.
Rectification to the finished surface levels and materials.
Legal disposal of all removed vegetation and debris.
Replanting at a ratio of 1 replacement tree for each removed street tree.
Rehabilitation after Vegetation Clearing
Rehabilitation of cleared areas must:
Be undertaken immediately following completion of the works that required the clearing.
Result in the area being stable and landscaped and street trees installed
Street trees must:
Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC)
Be either Cupaniopsis anacardioides, Elaeocarpus reticulatus or Harpullia pendula species in a minimum pot size of 45L.
Be located in accordance with engineering requirements for safe vehicle and pedestrian sight lines.
Be located between the back of kerb and footpath in proximity to removed trees location.
Installed in accordance with https://www.noosa.qld.gov.au/documents/40217326/bbb2508a-584f-4cf3-965c-f28c6fd7e56f
FOLLOWING CONSTRUCTION
A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required.  Please contact Council on 5329 6245 to arrange for the inspection.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
As the driveways are private structures, the owner bears full responsibly for the standard of their construction, maintenance and any liabilities associated with their construction. It is recommended that professional advice be sought for the construction of the driveways to ensure that the driveway is constructed in accordance with standard drawing RS-049 and RS-050.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart Inspections Request
Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include:
the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council;
Best Practice Erosion and Sediment Control, International Erosion Control Association (2008)
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
property notes
Not applicable.
VARIATION approval
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 7 of 7

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

Used in these records

About this file

File size
36 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW18 0093.docx · 36 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.