Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

RFI - Traffic Engineering Report

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (19.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

      j.   Sunshine Beach Road the Grant Street/Noosa Drive/Sunshine Beach Road
           roundabout.
25.   Provide additional detail demonstrating how the manoeuvrability of the coach will affect
      and be affected by the existing on-street parking arrangements along Serenity Close.
      The additional detail must consider all possible turning paths of the coach and be
      prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of
      Queensland).
26.   Provide additional detail and comments demonstrating how the VOLVO B12 BLE will
      enter the site in a forward gear and manoeuvre using the cul-de-sac without any
      component of the coach (including 0.3m clearance) mounting the kerb, crossing the
      coach bay line-marking or entering any private driveways. The detail and comments
      must be prepared by a suitably qualified person (RPEQ – Registered Professional
      Engineer of Queensland).
27.   Provide comment detailing the viability of alternate methods of transporting guests of
      the Resort (i.e. utilising the existing Noosa Junction Bus Interchange to transport guests
      to the Resort using a small vehicle that will have a lesser impact on the road network
      compared to a coach).


Issue – Internal Carparks
Engineering is concerned that a number of the proposed internal carparks are not functional.
Information Required
28.   Provide additional detail demonstrating the highlighted carparks (extracted by Richards
      & Spence’ SD-A-01-02-G_LEVEL 02-RevS) are functional. The detail must be prepared
      by a suitably qualified person (RPEQ – Registered Professional Engineer of
      Queensland) and include, but not be limited to:
      a. Turning Path Plans indicating a B99 vehicle can enter and exit the highlighted
         carparks without any component of the vehicle (excluding 0.3m clearance) colliding
         with another vehicle or parking infrastructure. The plans must demonstrate that the
         adjacent (or opposite, where applicable) carpark is occupied.




                                                                                       Page 8 of 11
Log in to download the original file

RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.