Skip to the record
Search everything, all in one place.

Original source · versioned page text

RFI - Traffic Engineering Report

of 132

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (19.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

•     LGIP mapping identifies the proposed development and the surrounding area within the Priority
     Infrastructure Area and Service Catchment.

•    LGIP Transport identifies a future bus stop (BSF04) between Coral Tree Ave / Noosa Drive roundabout
     and Grant Street / Noosa Drive / Sunshine Beach Road roundabout to be located south of the proposed
     development.

•    LGIP Pathways identifies future pathway (PW25) to be provided east of the development.




Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex                                       14
Reference: 22BRT022 RP01_1
Log in to download the original file

RFI - Traffic Engineering Report.pdf · 19.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.