Original source · versioned page text
RFI - Traffic Engineering Report
Very large file (19.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
• LGIP mapping identifies the proposed development and the surrounding area within the Priority
Infrastructure Area and Service Catchment.
• LGIP Transport identifies a future bus stop (BSF04) between Coral Tree Ave / Noosa Drive roundabout
and Grant Street / Noosa Drive / Sunshine Beach Road roundabout to be located south of the proposed
development.
• LGIP Pathways identifies future pathway (PW25) to be provided east of the development.
Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 14
Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.