Original source · versioned page text
RFI - Traffic Engineering Report
Very large file: it may take a few minutes
The original of this document is very large (19.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
N – North, S – South, E – East, W – West 9.1.2 Analysis Conclusions The analysis indicates that the roundabout is expected to operate at suitable levels at the 2034 design year, with development traffic included, with a worst-case DOS 51.0% (less than 85.0%, operational capacity of roundabout) and overall LOS A. The addition of the development traffic has no notable impact to key operational metrics, with minor change to average intersection delay and at most an increase in queuing of 5m (equivalent to 1 vehicle). Based on this assessment, the proposed development is considered to have no adverse impact on the operations of this roundabout. 9.2 Analysis of Grant Street / Noosa Drive / Sunshine Beach Road Figure 9-2 shows the configuration of the Grant Street / Noosa Drive / Sunshine Beach Road adopted in the SIDRA analysis. All default SIDRA inputs were used for the analysis. Site: 3-7 Serenity Close, Noosa Heads – Proposed Resort Complex 30 Reference: 22BRT022 RP01_1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.