MOVEMENT SUMMARY
Site: 101 [5_Grant St_Noosa Dr_Sunshine Rd - Base+dev
2034 AM Peak (Weekday) (Site Folder: Site 2)]
New Site
Site Category: (None)
Roundabout
Vehicle Movement Performance
Mov Turn INPUT DEMAND Deg. Aver. Level of 95% BACK OF Prop. Effective Aver. Aver.
ID VOLUMES FLOWS Satn Delay Service QUEUE Que Stop No. Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate Cycles
veh/h % veh/h % v/c sec veh m km/h
South: Sunshine Beach Road (S)
1 L2 205 6.2 216 6.2 0.276 7.2 LOS A 1.8 13.4 0.69 0.71 0.69 49.9
2 T1 22 0.0 23 0.0 0.276 7.0 LOS A 1.8 13.4 0.69 0.71 0.69 54.6
3 R2 348 4.6 366 4.6 0.374 11.6 LOS B 2.9 20.8 0.71 0.75 0.71 50.9
3u U 55 2.1 58 2.1 0.374 13.7 LOS B 2.9 20.8 0.71 0.75 0.71 52.0
Approach 630 4.8 663 4.8 0.374 10.2 LOS B 2.9 20.8 0.70 0.73 0.70 50.9
East: Noosa Drive (E)
4 L2 248 5.1 261 5.1 0.293 7.3 LOS A 2.1 15.2 0.72 0.71 0.72 53.0
5 T1 240 2.9 253 2.9 0.258 6.4 LOS A 1.9 13.7 0.68 0.65 0.68 51.0
6 R2 20 0.0 21 0.0 0.258 11.4 LOS B 1.9 13.7 0.68 0.65 0.68 53.7
6u U 14 0.0 15 0.0 0.258 13.6 LOS B 1.9 13.7 0.68 0.65 0.68 54.9
Approach 522 3.8 549 3.8 0.293 7.2 LOS A 2.1 15.2 0.70 0.68 0.70 52.3
North: Grant Street (N)
7 L2 19 0.0 20 0.0 0.252 13.7 LOS B 1.9 13.0 0.93 0.91 0.93 47.2
8 T1 44 0.0 46 0.0 0.252 13.9 LOS B 1.9 13.0 0.93 0.91 0.93 48.3
9 R2 60 0.0 63 0.0 0.252 19.0 LOS B 1.9 13.0 0.93 0.91 0.93 44.6
9u U 1 0.0 1 0.0 0.252 21.2 LOS C 1.9 13.0 0.93 0.91 0.93 49.3
Approach 124 0.0 131 0.0 0.252 16.4 LOS B 1.9 13.0 0.93 0.91 0.93 46.6
West: Noosa Drive (W)
10 L2 55 0.0 58 0.0 0.301 6.4 LOS A 2.3 16.2 0.71 0.64 0.71 49.9
11 T1 261 3.5 275 3.5 0.301 6.4 LOS A 2.3 16.2 0.71 0.64 0.71 51.7
12 R2 170 2.7 179 2.7 0.317 12.3 LOS B 2.2 15.9 0.72 0.79 0.72 47.5
12u U 98 2.4 103 2.4 0.317 14.4 LOS B 2.2 15.9 0.72 0.79 0.72 42.6
Approach 584 2.8 615 2.8 0.317 9.5 LOS A 2.3 16.2 0.71 0.71 0.71 49.0
All 1860 3.5 1958 3.5 0.374 9.5 LOS A 2.9 20.8 0.72 0.72 0.72 50.5
Vehicles
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Geometric Delay is included).
Queue Model: SIDRA Standard.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
SIDRA INTERSECTION 9.0 | Copyright © 2000-2020 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise | Processed: 21 June, 2023 1:44:27 PM
Project: L:\Synergy\Projects\2022\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel resort\6 - Analysis\1_SIDRA\22BRT0122-
Serenity Close-Rev C.sip9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.