Council archive · source document
Delegated Report - Code - Planning MCU21 0037 · MCU21/0037
Author Coordinator Engineering, Mark Lewis Development Assessment APPLICATION DETAILS Application No. MCU21/0037 and OPW21/0062 Applicant Julian Anthony Drake Chelsey Ann Drake Proposal Material Change of Use - Landing – Residential and Operational Works – Prescribed Tidal Works - Jetty Properly Made Date 2 March 2021 Information Request Date 23 March 2021 Information Response Date 19 July 2021 Decision Due Date 6 October 2021 Report Completed Date 27 September 2021 Report Reviewed By Laurie Schreck PROPERTY DETAILS Property Address 15 Noosa River Dr Noosa North Shore Qld 4565 RP Description Lot 8 RP 47488 Land Area 1138 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Regional Landscape and Rural Production Area Zone Low Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Acid Sulfate Soils, Bushfire, Flood Assessment Type Code PROPOSAL The application seeks approval for a Material Change of Use - Landing – Residential and Operational Works – Prescribed Tidal Works - Jetty. The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Site Plan site details Background The proposed jetty replaces an existing structure. The new structure extends approximately 2m further into the river. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Low Density Residential Code; Waterways Works Code The application has been found to generally comply with all applicable statutory instruments. cONSULTATION Referral Agencies The applicant was referred to the following Referral Agency: Department of Infrastructure, Local Government and Planning (SARA) The Department provided additional comment on the 27/9/2021 regarding the later revision of drawing S03 (revision C3) “complies with conditions 1 & 6 of 2107-23677 SRA” Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Planning Assessment conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No MCU21/0037 & OPW21/0062 for a Material Change of Use - Landing - Residential and Operational Works – Prescribed Tidal Works - Jetty situated at 15 Noosa River Dr Noosa North Shore Qld 4565 and described as Lot 8 RP 47488, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: MCU21/0037 & OPW21/0062 Street address: 15 Noosa River Dr Noosa North Shore Qld 4565 Real property description: Lot 8 RP 47488 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Material Change of Use - Landing – Residential & Operational Works – Prescribed Tidal Works - Jetty CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 20.001-004 S01 C2 Drawing Schedule & Transmittal prepared by Long View Consulting Engineers 20 October 2020 20.001-004 S02 C2 Structural Notes Sheet prepared by Long View Consulting Engineers 20 October 2020 20.001-004 S03 C3 Site Plan, Framing Plan, Elevations prepared by Long View Consulting Engineers 19 April 2021 20.001-004 S04 C2 Jetty Framing Details prepared by Long View Consulting Engineers 20 October 2020 Currency Period The Currency Period for this development approval lapses if all conditions have not been complied with, and the plan of survey lodged with Council for endorsement by 27 September 2023, unless an application to extend the currency period is approved by Council. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $1500 must be submitted to Council, to secure performance of all conditions of this approval, prior to the commencement of the works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. General Conditions The maximum number of vessels that may be berthed, moored, attached or stored on the structure(s) must not exceed 2. The use of the jetty must not cause any adverse effects on the amenity of the surrounding area including changes to light, views, air quality and noise. Vessels berthed/moored at the jetty must be located a minimum of 1.0m from the prolongation of the southern property boundary of 17 Noosa River Dr (Lot 8 on RP47488) and the northern property boundary of 13 Noosa River Dr (Lot 7 on RP47488). Vessels must be connected directly to the jetty, and not located side by side or in tandem with another vessel. All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall All structures must have no detrimental effects on stormwater drains and/or easements. A rigid handrail must be fitted on one side of the walkway. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a vessel above the water without Council approval. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the property boundary wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. The jetty is to be used for private purposes only with no commercial operations to be undertaken. Boat repair activities are not permitted on site. Wastewater and sullage must only be disposed of at approved pumpout facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the jetty is constructed in accordance with best practice methods and is structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection. This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District The agency provided its response on 23 August 2021 (Reference No. 2107-23677 SRA). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 7 of 7 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.jpeg (image text)] Tewantin Park GOAT ISLAND [Attachment: image2.jpeg (image text)] JETTY FRAMING PLAN FRAMING SCHEDULE JETTY RIVER ELEVATION FRAMING PLAN, ELEVATIONS Long View
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU21 0037Related documentApplication case desk ↗
About this file
- File size
- 234 KB (small file)
- File type
- DOCX
No other editions are linked here.