Delegated Report - Code - Planning OPW25 0042 · OPW25/0042
2. APPLICATION BACKGROUND
The application is to address the conditions of the higher order approval (132008.176.05).
3. SITE DETAILS
3.1. Site History
The subject site is the final undeveloped site within Serenity Close.
3.2. Site Description
The subject site is approximately 2.4 hectares. The site generally grades from the northwest to the
southeast with the levels ranging from 22m AHD to 8m AHD. The site consists of loose to dense,
poorly graded dune sand with high permeability.
An existing stormwater drainage easement and stormwater line traverses the middle of the site,
discharging to an existing reserve to the southeast.
3.3. Surrounding Land Uses
The subject site is surrounded by low-to-high residential uses, community facilities and the major
centre (Noosa Junction).
4. ASSESSMENT
4.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
• State Planning Policy;
• South East Queensland Regional Plan;
• Planning Regulation 2017; and
• Noosa Plan 2020 (25 September 2020).
4.2. Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
• Works Codes – Earthworks, Water Quality and Drainage Code, Transport Code
• Overlay Code – Acid Sulfate Soils
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:
Existing Services (Sewer & Stormwater)
As part of the development of the site, the existing sewer and stormwater infrastructure is to be
removed and their associated easements extinguished. The infrastructure is to be reconstructed
on an alternate alignment. To address concerns regarding overland flow and excess gap flow, an
ephemeral stream (overland flow path) is proposed to control and capture flow.
The proposed stormwater infrastructure realignment (including the ephemeral stream) was largely
assessed as part of the higher order approval by Council’s external stormwater consultant. The
proposed works satisfies the conditions of the higher order approval and remain consistent with
what was previously assessed.
To achieve the minimum freeboard within the ephemeral channel, the channel should remain either
grassed or rock-lined and not be planted. Any future Operational Works – Landscaping must
remain consistent with the design assumptions contained within the Approved Plans and
Reference Documents.
Haulage Operations
The excavation of the subject site is scheduled to last 12-14 weeks and include the removal of up
to 100,000m3 of material. Council staff indicated concerns regarding the impact haulage activities
Page 4 of 19
Document Set ID: 23831232
Version: 12, Version Date: 12/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW25 0042.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.