10/0627 - Lot Reconfiguration (1 lot into 3) [As Published] · 152010.627

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

lo[G24

 

 

 

 

 

— : 5 0 JONES FLINT & PIKE PTY. LTD. ABN 79050414045
| >) Imaroochypore o> a SA, JONES FLINT & PIKE
toe 7 \, development consultants,
“7 ED planners, surveyors, landscape architects
‘ 21 April, 2010 s © 3
date nl,
referen M2358 02-02 R 2910 RISBANE
ce men 23 AP IDF&P House
4 | y Ernest and Merivale Streets, South Brisbane,
eo JRG iL Jppone (07)3844 7161 fax (07)3846 1959
gore coor segmecrns ome
° Wi d :
a7 The Chief Executive Officer wp “ SUNSHINE COAST
° Sunshine Coast Regional CounciINZ "57 Te eT (OT) ads DEO tae (On) oe ae
Northern District - Tewantin Office POBox 6, Maroochydore, Queonstand 4558
: 4 e-mail mar [email protected]
fo |e PO Box 141, TEWANTIN,
i of "QLD 4565 GLADSTONE

59 Goondoon Street,
phone (07}4972 2100 fax (07)4972 5444
PO.Box 172, Gladstone, Queensland 4680
¥ attention Development Assessment e-mail [email protected]
re ;Development Application for a Development
‘Permit for a Reconfiguration of a Lot (one (1)
jot into three (3) lots) over fand located at 215- Develo men
i219 David Low Way, Peregian Beach and p t Counter
‘Yescribed as Lots 8-10 on P9315 and Lot 76

‘on MCH2969 (arr algan ated Lot 7 on 2 2 Pe 20 1)

=
is

 

Seba,

Dear Sir/Madam,

 

 

We hereby present the enclosed Development Application which has been prepared on behalf of
our clients and Applicants, Scanlon Property Group, to the Council for assessment.

a The Development Application seeks the Council’s approval for a Development Permit for a
Reconfiguration of a Lot (one (1) lot into three (3) lots). As detailed within the enclosed Planning
Assessment Report, the proposal complies with the SEQRP State Planning Regulatory
Provisions.

In accordance with Section 260(1)(b) of the Sustainable Planning Act 2009, the proposed
Development Application has been prepared in the approved form. The Development Application
includes the following items:-

o Five (5) hard copies of the Planning Assessment Report, prepared by Jones Flint &
Pike Pty Ltd;

o One (1) Electronic copy of the Planning Assessment Report, prepared by Jones Flint
& Pike Pty Ltd;

o IDAS Form 1, Form 7 and the Individual Owner's Consent Form; and

o Applicant's cheques for the sum of $2843.00, being the applicable application fee for
the assessment of the proposed Reconfiguration of a Lot (3 lot subdivision).

If you require any further information or discussion please contact our Maroochydore Office on
5443 2500.

Yours faithfully,
JONES FLINT & PIKE PTY LTD

ROBERT STONADGE Burp mpPIA
Town Planner

J.C. Franklin, GDURP MRAPI MDOIA

| \A-Thomson, BApp Sc(Sur) ADip(Surv) MSSI “
LW] ® MAT. Fitzgerald, BSurv MSSI LO, ;
B.W. Butler, BApp Se{Surv} MSSI . ae
MEMBER OF AUSTRALIAN SPATIAL INFORMATION BUSINESS ASSOCIATION - QUALITY ASSURED SUPPLIER - MEMBER OF URBAN. DEVELOPMENT INSTITUTE OF AUSTRALIA

 

 

 

 
Full text of the other 25 pages

Page 2

ce othe

 

| ANTiHaNY palace More how

_ posed name ay bili}

Director ofthe below mentioned companyand ss sti—i‘z‘i‘(a‘é ét~™S
!, Va. ee eee een nn ce ne en nnn ne ee eg pee ee name ink

    

ht finsert position in full i.e another director or 2c
Wb» apphcable. ie for a proprietary canipany that has
needs ta commete the owner's consent)

 

 

 

 

 

smile director who is aiso the sole company secretary, ortly that director

   

 

of Thomco_(NO.2087).Pty.Ltd.as Trustee...

Hi name of company]

 

eee enn nce nnn ec mae ED

as owner of premises identified as follows:

Lot 8 on P9315, Lot 9 on P9315, Lot 10 on P9315 and Lot 76 on MCH2969

finsart street address, fot on plan description or cocrdinates of the premises the subject of the application}

 

consent to the making of a development application under the Sustainable Planning Act 2009 by

Scanlon Property Group

were ee PNSANT AMO Cf Aophcaet]
on the premises described above for the purposes of

Reconfiguration of a Lot - four (4) lots into two (2) lots.

 

fstonature of Direct]

  

 

 

 

signed on the ¢ _. day of _7777 4u 20 49
a MS en ne pee epg ee enn renner [GHAtUFE OF Dit
signed OM the on eee aeseteneeeennneieccnees GAY OF ee cee reenter, LO) veces wines cine ate

Company seal /if use}

Pi eme Reel ee fa EELS] POPC R eens osm) Department of Infrastructure and Planning, Queensland Govern

fA) Version? 7 10.12 GS

 

Page 3

fe Reconfiguring a Lot — SPA Requirements

 

      

 

 

 

 

 

 

 

 

 

f - ——
: f “Information Required”. 3.42 S8 79 | Provided! |: Provided’By* #7" *Wheretto cst ee,
{ , The location and site area of the land APPENIOIX A
L to which the application relates JS SEP AVENO IK C
- | (relevant land).
The north point. v TE+e AMEND IK C
The boundaries of the relevant land. v SEY AMEND de
Any road frontages of the relevant
land, including the name of the road. v Te? AMENO\K C
The contours and natural ground _
levels of the relevant land. vO TE+P AVEWMO\K C
. The location of any existing buildings / "Cc
é ‘Lor structures on the relevant land. SP+? APPENVO\ Ko
The allotment layout showing existing
— lots, any proposed lots (including the

dimensions of those lots), existing or SY SEH? APPEWNO \Xx C

proposed road reserves, building
envelopes and existing or proposed
open space (note: numbering is
required for all lots).

Any drainage features over the
relevant land, including any
watercourse, creek, dam, waterhole
or spring and any land subject to a
Q100 flood event.

Any existing or proposed easements
on the relevant land and their
function.

All existing and proposed roads and
access points on the relevant land.

 

GA? MEN <

 

JF+P APPRENOLE C
J Fae AMEN O v< C

 

 

 

 

All existing and proposed roads and = =

access points on the relevant land. Tr? A HENO Le
retaining walls on the relevant land -

and their height. N/A

The location of any stormwater

detention on the relevant land. M/A

 

The location and dimension of any
land dedicated for community

- N/A

 

v
JS
/
vo
The location of any proposed J
Y
J
J

 

 

 

purposes.

The final intended use of any new 2

lots. aoe rs i MRE OAK c
Sere a SUE SES ae ae

A statement about how the proposed “(LAW n/t Cer on Ore

development addresses the local SY St C+ P mM 53
d i 23

government's planning schemes and
any other planning documents
relevant to the application.

 

 

 

 

 

 

Page 4

u

ny

 

 

 

 

 

 

 

_ Integrated Development’'Assessment System, Checklist

 

 

 

 

 

Development assessment checklist - IDAS
checklist 1

(Sustainable Planning Act 2009, version 1.0 18 December 2009)

This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

* whether you need to make a development application for the proposed development
* ifadevelopment application is required, the relevant IDAS forms you need to complete as part of-your application
+ whether you need to give a copy of your application to any referral agencies.

If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works -IDAS checklist 4, as applicable.

If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.qid.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Part 1.- General questions. © 6 os boom

 

 

1.1 Have you received a referral agency response in relation to this, Proposed development Prior ‘to making

 

 

 

an application? ae oe
KkINo
Ores | To assist you in preparing your application, completing Referral agency responses - IDAS checklist

6 is recommended

 

 

 

1.2Do\ you :wish: the Propésed. development to be assessed | against ‘a superseded, plarining : scheme?

Fee Feat

 

 

fk) No

 

Q You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
O Yes form 2 and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details - IDAS form 1

 

 

 

1.3 Does the proposal involve removing quarry material. from a, watercourse or lake. for. which an allocation:
notice is required under the Water Act 20007. | "

[x] No

(Yes | It is recommended that you complete part 2 of this checklist

 

3, . ae . ee ee

 

 

 

 

 

 

 
   

tiie’ ‘Queée

[x] No

[Yes } It is recommended that you complete part 3 of this checklist

 

 

 

 

 

 

 

Department of Infrastructure and Planning Gin

 

ee erasiaalsiis

 

 

 

Page 5

LOU

 

 

 

 

1.5 Does the proposal involve development ona local heritage place Pass se eo. ay Lente tt
No
(Yes | It is recommended that you complete part 4 of this checklist

 

 

 

1.6 Does the proposal involve an Srivironimentally, relevant activity; other than an agricultural ERA; a‘ mining .

   
 

 

 

 

 

activity or achapter 5A activity 2... a by So. Sa ee a Co ae aa
No
OYes | It is recommended that you complete part 5 of this checklist

 

 

 

 

 

 

 

 

   

re . r ~

a OE. : Jyh . “ were wat

 

 

 

 

 

 

 

 

 

No

OYes } It is recommended that you complete part 7 of this checklist

1.9 Is any part ofthe premises designated for community infrastructure? ="
(No

x] Yes |}. It is recommended that you complete part 8 of this checklist

 

 

 

 

 

 

It is recommended that you complete part 9 of this checklist

 

 
 
  

 

 

    

 

Te eR > eae ew Be “3s

velop ient’o ‘on land ‘that adjoins a déclared. fi sh. habitat area: uiider ths, Fisheri

Beaneepe te tebeeeemie, vee et eo ee dee come ea

 

 

 

QO
~<
@
a

It is recommended that you complete part 10 of this checklist

 

 

 

 

 

 

8.1 15 the community infrastructure intended to be sij

No
LJ Yes

Section reference:
Sustainable Planning Regulation, schedule 7, table 3, item 6

 

 

 

End of part 8 of this checklist

 

 

 

 

 

 

Development application assessment checklist - IDAS checklist 1
Version 1.0 18 December 2009

Page 6

ate

7 Fe, a
ae t
ane

oe

OOO

Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disctaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will

not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

 

Development application assessment checklist - IDAS checklist 1
Version 1.0 18 December 2009

 

Page 7

  

 

 

 

 

 

 

 

 

TP yp Integrated: Development'Assessment System’checklist

 

 

 

 

Reconfiguring a lot - IDAS checklist 3

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This checklist only applies when the development application seeks approval to reconfigure a lot.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

. whether you need to make a development application for the proposed development

. if a development application is required, the relevant IDAS forms you need to complete as part of your
application, and

° whether you need to give a copy of your application to any referral agencies.
You should complete all questions unless the checklist indicates otherwise.

{f you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website, www.dip.qld.gov.au

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

The checklist and relevant parts do not need to be completed for applications relating only to building work requiring
assessment against the Building Act 1975.

 

 

 

 

  

‘IS any. part.of the land locate:

. 'State:controlled.road?,

eb ek

 

 

° It is recommended that you complete part 2, question 2.1 of this checklist.

 

 

° It is recommended that you complete part 2, question 2.2 of this checklist.

 

 

 

 

 

 

 

Ces . This application requires assessment by the Department of Environment and Resource Management
as a concurrence agency

 

 

Section reference:
° Sustainable Planning Regulation 2009, schedule 7, table 2, item 14(a)

 

113) “1 any lot before the proposed reconfiguration two Rested orlarger?

 

 

 

LJ No

 

 

Yes |e It is recommended that you complete part 3 of this checklist.

 

 

  

174

any Part of the lot subject

 

 

 

J No

 

 

Yes |e It is recommended that you complete part 4 of this checklist.

 

 

 

Department of Infrastructure and Planning : Gain .

 

 

 

 

Page 8

1.5° - ts any part of the lot Situated Within 100 métres of-a‘Substation.site under. the Electricity Act,1994? . «

[k] No

CyYes ° This application requires assessment by the entity responsible for the substation as an advice
agency

 

 

 

 

 

 

 

 

Section reference:
° Sustainable Planning Regulation 2009, schedule 7, table 2, item 21{b)

  
 
 

 

1.6 mental management register or contaminated land . *

Shtal Protection Act 999427 2 Veg

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

{x} No

LlYes |e It is recommended that you complete part 7 of this checklist.

 

 

 

 

 

1; of es ls all.or,part ‘of the premises in’ an aréa ‘for, which % an area management advice has been,given for,
a natural: mineralisation: ‘or, "industrial activity (other-than for a ‘mining activity; or petroleum. activity)?

    

 

 

[x] No

LJ Yes |e It is recommended that you complete part 8 of this checklist.

 

 

 

 

 
 

1:403.; ‘Is all or: part. of the premi
4, “unexploded ordnance?

 

 

 

 

L] No
° You must complete Contaminated land - IDAS form 24
Yes |e This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency

 

Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 2, item 22(b)

 

 

 

 

 

 

 

 

 

[x] No

(J Yes |» It is recommended that you complete part 10 of this checklist.

 

 

 

 

 

 

Reconfiguring a lot - IDAS checklist 3
Version 1.0 December 2009

Page 9

1.13 "Is any part of the premises:in-an interim koala habitat protection area identifi ied w under the South East
Queensland Koala state planning | regulatory provisions. (SEQ Koala SPRP)?=° a“ * : seen oe

 

 

 

 

(No ° It is recommended that you complete part 11 (starting from question 11.3) of this checklist.

 

Yes ° It is recommended that you complete part 11 (starting from question 11.1) of this checklist.

 

 

1.14: I& the proposed reconfiguration in:connection with the coristruction of.a canal?,,

[x] No

  
 

 

 

° You must complete Tidal work and coastal management district - IDAS form 23
This application needs to be assessed by the Department of Environment and Resource
management as a concurrence agency

0 Yes

 

 

 

 

Section references:
. Sustainable Planning Regulation 2009, schedule 7, table 2, item 14(b)
. South East Queensland Koala State planning regulatory provisions

 

 

 

 

 

 

 

 

ified threshold for the | purpose « r

Sei ine i anna the
Oe ow

 

 

 

 

OYes . This application needs to be assessed by the Department of Transport and Main Roads as
concurrence agency

 

 

 

 

Section references:
° Sustainable Planning Regulation 2009, schedule 7, table 2, item 33
. Sustainable Planning Regulation 2009, schedule 9

 

 

 

 

[X] No

Yes . This application needs to be assessed by the Department of Transport and Main Roads as
concurrence agency

 

 

 

 

 

Section references:
. Sustainable Planning Regulation 2009, schedule 7, table 2, item 34
. Sustainable Planning Regulation 2009, schedule 10

 

 

 

  

 

It is recommended that you complete part 13 of this checklist.

 

 

 

 

 

Reconfiguring a tot - IDAS checklist 3
Version 1.0 December 2009

Page 10

1:19 » Does the proposed. ‘réconifi iguration( involve-a lot: ‘sharing a,common. boundary 5 with a. lot. that” ape
; comprises or contains a Queensland.Heritagé | place’ under the Queensland. Heritage | Act 49922" my toe

 

 

 

 

[K] No

ov e This application needs to be assessed by the Department of Environment and Resource
es Management as an advice agency

 

 

 

 

 

Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 2, item 46

 

 

1.20.” ‘Can ‘the. proposed reconfi guration, of.a. lot, be performed. without, the re
: of marine plants Under the Fisheries. Act 19942"

 
   

 

 

(No ° It is recommended that you complete part 14 of this checklist.

Yes

 

 

 

1.21°, “Is: ‘any part: of the premises: within: the Wide |

 

y,Burnett (WBB) designated region

 

 

 

(K]No

LJYes . It is recommended that you complete part 15 of this checklist.

 

 

 

 

2M

Part 2- State-controlled roads’, 7: ™:.

   
 

 

 

 

 

 

 

 

 

 

a? by 4 %
an increase in the total number of lots Yes (J No
an increase in the total number of lots abutting the state-controlled road CJ Yes No

 

. \f yes to either of the above, this application requires assessment by the Department of Transport and Main
Roads as concurrence agency.

Section reference:
° Sustainable Planning Regulation 2009, schedule 7, table 2, item 2

 

 

 
      

 

 

wre, dere frinn,

3 of an ot pr roposed to, be created 25 ‘hectares’ OF, lar a

toe! ee

 

 

No |e End of part 3 of this checklist.

 

 

 

 

 

LJ Yes

Section reference:

. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 1
° Sustainable Planning Regulation 2009, schedule 26

 

 

 

 

 

 

 

 

 

 

{Yes |e This application requires assessment by the distribution or transmission entity as an advice agency

 

 

Reconfiguring a lot - IDAS checklist 3
Version 1.0 December 2009

Page 11

FAS

Ye

 

 

 

 

[x] No

 

 

ClYes |« This application requires assessment by the license holder as an advice agency

 

Section reference:

° Sustainable Planning Regulation 2009, schedule 7, table 2, items 21{a) and 35

 

 

 

 

 

 

the application only seeks approval for reconfiguring a lot other than a subdivision

[x]Yes

 

the application is only for development inside a rural precinct and the development is
consistent with the rural precinct

OYes

[X]No

 

the application is only for development identified as exempt development under the
Sustainable Planning Regulation 2009, schedule 4

(Yes

—x]No

 

the application is only for development carried out under a development approval

{which has not lapsed) for the premises:

. that was properly made before the South East Queensland Regional Plan
2009-2031 regulatory provisions (SEQ 2009-2031 regulatory provisions)
commenced or

° to which division 2 of the SEQ 2009-2031 regulatory provisions apply

LyYes

[{X]No

 

the application is only for development that is consistent with a preliminary approval

which has not lapsed, for the part of a development application mentioned in SPA

section 242 that states the way in which the effect of a local planning instrument is

varied, where the development application for the preliminary approval was:

° properly made before the SEQ 2009-2031 regulatory provisions came into
effect or

° assessed against division 2 of the SEQ 2009-2031 regulatory provisions

LJYes

 

the application is only for development that is generally in accordance with a

rezoning approval where the development entitlements from the rezoning approval

are conferred by the following:

. the resulting zone in a transitional planning scheme

. a development permit for a development application (superseded planning
scheme) for the resulting zone in a transitional planning scheme which is a
superseded planning scheme or

. a notice is issued under section 97 of the Sustainable Planning Act 2009
agreeing to apply the superseded planning scheme

. a planning scheme (other than a transitional planning scheme)

LYes

 

the application is only for development that is declared to be a significant project
under section 26(1)(1) of the State Development and Public Works Organisation Act
1971

LlYes

 

the development is in a state development area under the State Development and
Public Works Organisation Act 1971

 

LlYes

 

 

 

. If yes to any of the above, end of part 9 of this checklist.

Section references:

° South East Queensland Regional Plan 2009-2031

. South East Queensland 2009-2031 regulatory provisions, division 3
. Sustainable Planning Regulation 2009, schedule 7, table 2, item 39

 

Reconfiguring a lot - IDAS checklist 3
Version 1.0 December 2009

Page 12

age

aoe

ooo

 

 

 

 

 

 

 

 

 

 

 

(K]No
LYes ° End of part 11 of this checklist.
11:22,” Will thé reconfigura

 

 

 

 

 

 

LINo . End of part 11 of this checklist.
° This application must be assessed by the Department of Infrastructure and Planning as a
[x]Yes concurrence agency

End of part 11 of this checklist.

 

 

Section reference:

Sustainable Planning Regulation 2009, schedule 7, table 2, item 36

South East Queensland Regional Plan 2009-2031 state planning regulatory provisions
South East Queensland Koala State planning regulatory provisions

Nature Conservation (Koala) Conservation Plan 2006

 

   

ational. work’? ist_.3 4s

 

 

 

 

 

End of part 14 of this checklist.

 

 

 

al for the proposed operational work:béen Sought in

 

 

This application needs assessment by the Department of Environment and Resource
Management (DERM) as a concurrence agency.

 

 

 

 

 

No ° To assist you in preparing your application, completing Operational works - IDAS checklist 4 is
recommended.

(Yes

Privacy --please refer to your assessment manager for further details on the use of information recorded in

this form.

Disclaimer:

While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.

 

 

Reconfiguring a lot - IDAS checklist 3
Version 1.0 December 2009

 

Page 13

 

 

 

 

 

 

 

 

Integrated Development’Assessment System form

 

 

 

 

 

Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
, complete this form (Application details - IDAS form 1)
« complete any other forms relevant to your application

* provide any mandatory supporting information identified on the forms as being required to accompany your
. application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

 

  

Applicant 'd ‘details (ni (note: the: ie applicanti is'the person. responsible for: emaking, the application. and need not be the.
owner of the land: The applicant is responsible: for ensuring the information provided on a on all 'IDAS"app Application forms is *

correct. Any development permit or preliminary approval that may be. issued asa consequence of this application will,
be issued to the applicant. y a

 

 

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.

 

Name/s (individual or company name in full) |Scanlon Property Group

 

 

 

 

 

 

For companies, contact name C-/ Jones Flint & Pike Pty Ltd
Postal address PO BOX 6 Maroochydore QLD 4558
Contact phone number (07) 5443 2500

 

 

Mobile number (non-mandatory)

 

 

Fax number (non-mandatory) (07) 5443 4759

 

 

 

e-mail address (non-mandatory) [email protected]

 

 

 

1. What is the nature of development proposed? (lick all applicable boxes)

 

material change of use of premises
building work

operational work

WOOO

reconfiguring a lot

 

Department of Infrastructure and Planning Gln

 

 

 

 

 

Page 14

OL

 

of arava Beng BGUGHNT|.

 
 

 

 

 

 

development permit

(preliminary approval
[1 both - provide details below

 

 

 

" EIS the application for 8 mobile ah

 

 

{k] No

_ [] Yes - complete table A and then go to question 5

 

 

 

 

Table B - street address/ot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

 

Street Address ‘ Lot on pl jan

description

Local government area
Unit | Street Street name and official Post Plan type (e.g. Logan,Cairns)
i Lot No.
No. | No. suburb/locality name code and plan no.
1 21g |David Low Way, Peregian =| ye7g |g P9315 SCRC
Beach

 

 

 

 

 

 

 

 

 

Street address / lot on plan

oO Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

2 217 David Low Way, Peregian
Beach

Street address / lot on plan

gO Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

David Low Way, Peregian
Beach

Street address / lot on plan

oO Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

David Low Way, Peregian
Beach

Street address / lot on plan

oO Street address / lot on plan for the jand adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

 

4573 |9 P9315 SCRC

 

 

 

 

 

 

 

 

 

 

3 219 4573 410 P9315 SCRC

 

 

 

 

 

 

 

 

 

 

4 215 4573 |76 MCH2969_ | SCRC

 

 

 

 

 

 

 

 

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 15

LOL

 

Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

 

Coordinates (note: place each set of

 

 

coordinates in a separate row) Zone Datum Local government
Easting Northing | Latitude | Longitude reference area (If applicable)
CL Gba94
L] wGse4
(J other

 

 

 

 

 

 

 

 

 

 

 

 
    

  
  
 

   
  

 

te):

 

Si looa; pose, Spanien bola, cane at

6. Currant usel

oe opdere ts

 

 

sig se gn iin

 

 

1 [Caravan Park

 

 

 

 

 

 

Three (3) lot subdivision.

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 16

 

 

 

 

Yes - complete either table D, table E or table F as applicable

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

Name of owner/s of the land

 

a, We, the above-mentioned owner/s of the land, consent to the making of this application.

 

_-# | Signature of owner/s of the land

 

 

Date

 

 

Table E

 

 

 

Name of owner/s of the land /Thomco Pty Ltd

 

The owner's written consent is attached or will be provided separately to the assessment manager

 

Table F

 

 

Name of owner/s of the land

 

 

Oo By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.

 

 

 

 

 

 

 

Ae ee |

 

adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
on strategic port land under the Transport Infrastructure Act 1994 - complete table |
in a tidal water area - complete table J

 

 

 

 

 

(LJNo_ [kX] Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

Application Details - IDAS form 4
Version 1.0 18 December 2009

 

Page 17

LID

‘(122 Does the proposal includes new building, “work or Operational work on the premises? (including. any. .
services) . 7. Pd ay ee ee : : .

 

 

 

 

 

 

No []Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. Is: the payment of a portable long service leave levy, applicable to. this application?, (refer to the notes at the:
“end of this form for more information). -o ack ?

2 ES : Lode ne se a ee

 

 

 

 

 

No - Go to question 15 OD Yes

 

15: Has the local government agreed to apply a- jeupersoded planning : scheme to thig is application under: iy
: -Seétion 96 of the Sustainable Planning Act 20097: w. .

      

 

 

   

 

{k] No

“ (1 Yes - provide details below

 

 

 

 

[Method of lodgement to

Description of attachment or title of attachment
assessment manager

 

1 _|Planning Assessment Report M2358 over the counter

 

2  |Owners Consent Form over the counter

 

 

 

 

 

    

my rs oo

nt's declaration?.* °. i. = °°

    

 

 

Xx By making this application, | declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 18

LILI

* Notes for completing this form

Question 8:
* Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required =~ ~~~
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
e Owner's consent is not required for a mobile and temporary ERA.

Question 9:

« Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

*- Question 13: :

¢ The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.

«The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

e The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qieave.qid.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

To: Council. | have been engaged as the private certifier for the
. building work referred to in this application.

 

 

 

 

Date of Name BSA Certification Building
engagement license number classification/s

 

 

 

 

 

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 19

ane

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Date receipted

eg QLeave Project {Amount _, form sighted by|Name of officer who
Description of the work Number paid ($) Date paid assessment __|sighted the form
manager

 

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
* agencies.

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 20

>

| | | | Integrated Development Assessment System form

 

Reconfiguring a lot - IDAS form 7

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for reconfiguring a lot.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
e complete Applicant details - IDAS form 1

. complete any other forms relevant to your application

e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.

 

1, What is'the total number of existing lots: making up the premise

 

; "14 (to be amalgamated)

 

 

 

 

 

2. What ig the nature.of the lot Feconfiguration? (tick abplicable boxes).

   

 

 

[K] subdivision - complete questions 3-6 and 11
[1 boundary realignment - complete questions 8, 9 and 11
LL] creating an easement giving access to a lot from a constructed road - complete questions 10 and 11

LC dividing tand into parts by agreement --please provide details below and complete questions | 7 and ae

 

   
     
 

 

 

3.°. ‘Within t the : é subdivi 3n.W created and-their:
Intended final use of new lots Other (Specify)
Number of additional of lots 1 4 4 Park Lot

created

 

 

 

 

 

 

 

 

 

 

O preliminary approval
[x] development permit

LJ both

 

  

aterial change’ of use)

 

 

it approvals aSsociated with this subdivision application? (e.g

 

 

 

 

[] No Yes - provide details below
List of approval reference/s Date approved Date approval lapses
1 2007/1259 12 Feburary 2010 12 Februaru 2014

 

 

 

 

 

 

A Cted ices ore Eure og - (Ce

 

mer UL

 

Page 21

 

 

 

 

No - complete Table A (Yes - complete Table B

 

 

 

 

Table A
What is the total length of any new road to be constructed? N/A
What is the total area of land to be contributed for community purposes? 0.53ha

 

Does the proposal involve the construction of a canal or other artificial waterway?
No CL Yes
Does the proposal involve operational work for the building of a retaining wall?

No (Yes

 

 

 

hat the following mandatory infornia

 

 

 

 

 

 

Mandatory supporting information . edgement of lodgement
site plans drawn to scale (1:100, 1:200 or 1:500 are the recommended scales)
which show the following:
° the location and site area of the land to which the application relates
(relevant land)
° the north point
. the boundaries of the relevant land
. any road frontages of the relevant land, including the name of the road
. the contours and natural ground levels of the relevant land
° the location of any existing buildings or structures on the relevant land
. the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves,
building envelopes and existing or proposed open space (note: over the counter
numbering is required for ail lots) :
. any drainage features over the relevant land, including any confirmed 7
watercourse, creek, dam, waterhole or spring and any land subject to
a Q100 flood event
. any existing or proposed easements on the relevant land and their
function
° all existing and proposed roads and access points on the relevant land
. any existing or proposed car parking areas on the relevant land
. the location of any proposed retaining walls on the relevant land and
their height
the location of any stormwater detention on the relevant land
the location and dimension of any land dedicated for community
purposes
. the final intended use of any new lots
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant confirmed over the counter
to the application

 

 

 

 

Notes for completing this form:
* — This form can also be used for reconfiguring a lot against the land use plan for Cairns airport land or Mackay
airport land. Whenever a planning scheme is mentioned, take it to mean !and use plan for the airport land

Privacy - please refer to your local council for further details on the use of information recorded in this form.

 

Reconfiguring a lot - IDAS form 7
Version 1.0 18 December 2009

Page 22

LO

 

OFFICE USE ONLY

 

Date Received

 

 

 

Reference Numbers

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

Reconfiguring a lot - IDAS form 7 ,
Version 1.0 18 December 2009

Page 23

 

Contaminated land - IDAS form 24

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for:

* —amaterial change of use that is assessable development under the Sustainable Planning Regulation 2009,
schedule 3, part 1, table 2, items 6 to 9

. reconfiguring a lot that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 2,
item 22.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

' For all development applications you must:
¢ complete Application details - IDAS form 1
¢ complete any other forms relevant to your application
e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

 

1. What is the nature of the application? (tick applicablé-box/es) ** - !

 

 

(J material change of use reconfiguring a lot

 

 

2. What is the.nature. of the

 

 

 

all or part of the premises is on the environmental management register
all or part of the premises is on the contaminated land register
all or part of the premises is currently used for, or was last used for, a notifiable activity

alt or part of the premises is currently used for, or was last used for, an industrial activity and the proposed use
is for child care, educational, recreational or residential purposes (including a caretakers’ accommodation on
industrial land)

O OOO

in an area where an area management advice has been given for natural mineralisation or industry activity and
the proposed use is for child care, educational, recreational or residential purposes (including caretakers’
accommodation on industrial land)

x]

is in an area for which an area management advice has been given for unexploded ordnance

Department of Infrastructure and Planning ETI - Nau
7 a - ; 7 ay Crain

 

Page 24

 

 
 

 

 

1andatory. supporting ink his application. 7

 

 

 

 

Plans Confirmation of
lodgement Method of lodgement
plans showing where any notifiable activities, hazardous contaminant or BJconfirmed over the counter

potentially contaminated activity has occurred on the premises

 

Written documentation

 

if the application involves a material change of use from an industrial use |["}confirmed
to a more sensitive use (e.g. child care, educational, recreational or
residential purposes), then a detailed site history outlining previous
potentially contaminated uses on the premises [X]not applicable

 

 

 

 

 

Privacy - please refer to your assessment manager for further details on the use of information recorded in
‘this form.

OFFICE USE ONLY

 

 

Date Received Reference Numbers

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

|
!

 

Contaminated fand - IDAS form 24
Version 1.0 18 December 2009

Page 25

 

Sunshine Coast ‘ano use section FEES

Regional Council

 

CIVIGA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111

APPLICATION FEES

Material Change.gf Use -@6deHnpact += MCU

Cc, . 521 :
Inconsistent , ‘ . 521 *
Assessment under Superseded Planning Scheme : 521 .
Modification to a Development Permit MOD DP : 521
Extension of a Currency Period _ 7 521
Lot Reconfiguration RECONFIG ~ 3 4 7 & 521 sme
\.a=- . Bldg Work assessable against the Planning Scheme a $21

PRE LODGEMENT. REVIEW . / : : .
, Half Hour . mo . . 522

One Hour ° ‘ 522
ADVERTISING .
+ Purchase Advertised Applications 523
JETTIES .
’ Jetty Application Fee 524
Jetty Bond ; . ‘ toe : 54s
. . . (Category 4) .
BONDS . ‘ . , a , 4 '
Performance Bond " . $1. .
: Soe 4 we woo ae _  ({Category9) ;
SEARCHFEE co !
Search of Land Use Section file . _. 112 a

Liquor Licensing Request . . 113

 

TOTAL $ S27 fe

| NAME: : fore A=.” Leach Corn te Beate __
| ADDRESS: ef Jone, FUce « Orme _
. * iE
‘ fo Bex le MA Re0e4/4 p22
FILE NO: Jje( 629° DATE: a0[4f to

\ ! —_— 4 :

{ RECEIPT NO: baw au % Signature of TP Officer: PS Bn
* . 1

« AUTHORITYNO: . —_ : :

 

L pere[ ort (/

 

Page 26

 

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

>

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0627 - Lot Reconfiguration (1 lot into 3) [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.