Council archive · source document
10/0627 - Lot Reconfiguration (1 lot into 3) [As Published] · 152010.627
LOU
1.5 Does the proposal involve development ona local heritage place Pass se eo. ay Lente tt
No
(Yes | It is recommended that you complete part 4 of this checklist
1.6 Does the proposal involve an Srivironimentally, relevant activity; other than an agricultural ERA; a‘ mining .
activity or achapter 5A activity 2... a by So. Sa ee a Co ae aa
No
OYes | It is recommended that you complete part 5 of this checklist
re . r ~
a OE. : Jyh . “ were wat
No
OYes } It is recommended that you complete part 7 of this checklist
1.9 Is any part ofthe premises designated for community infrastructure? ="
(No
x] Yes |}. It is recommended that you complete part 8 of this checklist
It is recommended that you complete part 9 of this checklist
Te eR > eae ew Be “3s
velop ient’o ‘on land ‘that adjoins a déclared. fi sh. habitat area: uiider ths, Fisheri
Beaneepe te tebeeeemie, vee et eo ee dee come ea
QO
~<
@
a
It is recommended that you complete part 10 of this checklist
8.1 15 the community infrastructure intended to be sij
No
LJ Yes
Section reference:
Sustainable Planning Regulation, schedule 7, table 3, item 6
End of part 8 of this checklist
Development application assessment checklist - IDAS checklist 1
Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 - Lot Reconfiguration (1 lot into 3) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.