Council archive · source document
TT Noosaville-Latest full set of drawing 'For Construction' (16-06-2017) · MCU14/0102.06
Attached to the e-mail MCU - 14 0102 06 - Architectural Plans139 EUMUNDI RD NOOSAVILLE .msg.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
SHOP 1 & 2, 139 EUMUNDI ROAD
NOOSAVILLE, QLD 4566
SHEET LIST
WD00 Cover Sheet
WD01 Proposed Tenancy Layout Plan
WD02 Proposed Category Layout Plan
WD02a Proposed Planogram Category List
WD03 Existing Condition Plan
WD03a Demolition Plan
WD04 Proposed Building Works
WD04a Proposed Building Works
WD04b Proposed Building Works
WD04c Proposed Building Works
WD04d Proposed Building Works
WD04e Proposed Building Works
WD05 Proposed Electrical Layout Plan
WD06 Proposed Reflected Ceiling Plan
WD10 Proposed External Elevation & Finishes
WD11 Proposed Internal Elevation
WD12 Service Counter
WD13 Express Counter
WD14 Counter Details
WD15 Counter Isometric View
WD16 Proposed Egress Plan
WD17 Site Plan
GENERAL NOTES WD18 M9 Double Sided Rack w/ Mid Panel
Architectural documents to be read in conjunction with relevant
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil WD19 Detail
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification. WD20 M9B Double Sided Rack w/ Half Mid Detail
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all WD21 M9 Promo End Detail
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
WD22 Dense End Promotional Unit Detail
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
WD23 M8 - V2
be the responsibility of the contractor expense. WD24 M8 - V2 Detail
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris. DATE ISSUED : 16-06-2017
Written authority is required for any reproduction.
WD25 OH&S - Safe Working Loads
Notify SARRIS ARCHITECTURE of any changes. No changes to AS 4048-2012
occur without SARRIS approval.
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 22 (of 34)
Section 2
5
.55
11
NEW
COL 91.035
GENERAL NOTES: G
DB
C
A
B
C NEW
COL
D
E
F
G
PROPOSED MEZZANINE FLOOR PLAN COL COL COL COL
150
150
H
J
AREA SUMMARY
K A
FHR
FIXTURE LEGEND F D
COL COL COL COL
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION J
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
B
E E D
D A
FHR
DP DP DP DP DP RWH
RWHDP
BOL
FALL
BFC
F NEW NEW NEW NEW NEW NEW
FALL
BFC
PROPOSED TENANCY FLOOR PLAN ( Black Fixtures ) BOL BOL BOL
BOL BOL (R) BOL (R) BOL (R) BOL (R) BOL (R) BOL (R)
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
BICYCLE PARK X 11
GENERAL NOTES
Architectural documents to be read in conjunction with relevant
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification. BOL
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense. TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
Written authority is required for any reproduction.
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
ASSOCIATED PROJECTS
FOR CONSTRUCTION
5
.82
20
No. AMENDMENT DATE
REVISIONS
Section 3
NEW
COL
UMBRELLA CATEGORY
91.035
DB
NEW
COL
PROPOSED MEZZANINE FLOOR PLAN COL COL COL COL
150
150
FHR
COL COL COL COL
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
FHR
DP DP DP DP DP RWH
RWHDP
BOL
FALL
NEW NEW NEW NEW NEW NEW FALL
BFC BFC
BOL BOL BOL (R) BOL (R) BOL (R) BOL (R) BOL (R) BOL (R)
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
BICYCLE PARK X 11
PROPOSED CATEGORY LAYOUT PLAN
GENERAL NOTES
Architectural documents to be read in conjunction with relevant BOL
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification.
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense.
TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
5
.82
Written authority is required for any reproduction. ASSOCIATED PROJECTS
FOR CONSTRUCTION
20
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
No. AMENDMENT DATE
REVISIONS
Section 4
PLANOGRAM CATEGORY LIST
CATEGORY SUB CATEGORY CODE BAY TYPE NO. BAYS
AIR TOOLS Auto Tools& Accessories AIR M9 5 POWER TOOLS ACCESSORIES Grinding GRND - -
AIR TOOLS Auto Tools& Accessories AIR / WELD - - POWER TOOLS ACCESSORIES Hole Saws HOLE M9 1
AUTOMOTIVE Auto Hydraulic HYDR HDWL/S 2 POWER TOOLS ACCESSORIES Jig Saw Blades JIG/RECP M9 1
AUTOMOTIVE Automotive AUTO M9 2 POWER TOOLS ACCESSORIES Multi Tool Accessories MULTI/BATT M8 1
AUTOMOTIVE Engineering ENG M8 1 POWER TOOLS ACCESSORIES Diamond Blades DIAM M8 1
AUTOMOTIVE Impact Sockets IMP M9 1 POWER TOOLS ACCESSORIES Router Bits ROUT/BATT - -
AUTOMOTIVE Ratchet Spanners RATC/SHFT M9 1 POWER TOOLS ACCESSORIES Saw Blades SAWB M9 2
AUTOMOTIVE Sockets SOCK M9 2 POWER TOOLS ACCESSORIES SDS SDS M9 1
AUTOMOTIVE Shifting Spanners SHFT - - POWER TOOLS ACCESSORIES Miscellaneous MISC - -
AUTOMOTIVE Spanners SPAN M8 2 POWER TOOLS Bosch BSH M8 1
AUTOMOTIVE Spanners SPAN/SHFT - -
POWER TOOLS Demo Saws DEMO SM8 1
AUTOMOTIVE Tool Kits KLTS - - POWER TOOLS Dewalt DEW M8 1
AUTOMOTIVE Socket Sets SOCST - - POWER TOOLS Electric Saws ESAW HDWL/S 4
AUTOMOTIVE Socket Extension EXT - -
POWER TOOLS Festool FEST M8 & SM8 1&1
HANDTOOLS Punch PNCH/FILE M9 1 POWER TOOLS Hitachi HIT M8 1
HANDTOOLS Bolt Cutters BOLT M9 1 POWER TOOLS Makita MAK M8 2
HANDTOOLS Bolt Cutters KNVS/HACK - - POWER TOOLS Milwaukee M12 M12 SM8 1
HANDTOOLS Chisels CHIS M9 1 POWER TOOLS Milwaukee M18 M18 M8 2
HANDTOOLS Clamps CLMP M9 1 POWER TOOLS Power Zone PTC - -
HANDTOOLS Vices VICE M9 1 POWER TOOLS Skins SKIN - -
HANDTOOLS Files FILES - -
POWER TOOLS Vaccums VAC M8 1
HANDTOOLS Hack Saws HACK/KNVS M9 1
POWER TOOLS Vaccums VAC/CAST M8 1
HANDTOOLS Hand Saws HSAW M9 1 SAFETY Boots BOOT M9 & SM9 1&1
HANDTOOLS Hex HEX M9 1 SAFETY Manual Handling MANH - -
HANDTOOLS Knives, Blades & Scissors KNVS - - SAFETY Rigging RIG - -
HANDTOOLS Pliers PLRS M9 1
SAFETY Safety SAFE M9 & SM9 1&1
HANDTOOLS Screwdrivers SCRW M9 1
SAFETY Work Wear WW M9 1
HANDTOOLS Snips SNIPS M9 1
STORAGE Aluminium Boxes BOX M8 3
HANDTOOLS Tool Bags BAGS SM9 1
STORAGE Hard Storage HARD M8 2
HANDTOOLS Tool Belts BELT M9 1 STORAGE Tool Chests CHST HDWL/S 2
HANDTOOLS Tool Belts PODG/BAG M9 1 STORAGE Soft Storage SOFT SM9 3
HANDTOOLS Vices VICE/GRND - - STORAGE Tool Trolleys TROL - -
HANDTOOLS Wrecking WRCK M9 1 TRADES Electrical ELECT M9 3
HANDTOOLS Hammers HAMM M9 1 TRADES Paint PAINT M9 1
LADDERS Ladders LADD M8 & SM8 3&1 TRADES Plumbing PLUM M9 3
MACHINERY Compressors COMP M8 1 TRADES Wet Trade WET - -
MACHINERY Generators GEN M8 2 WELDING Welders WELD M9 5
MACHINERY Generators GEN/JERRY M8 1 Welding Accessories WELA - -
WELDING Gas Cylinders GAS - -
MACHINERY Machinery MACH - -
WELDING WOOD - -
MACHINERY Bench Grinders BG - -
BROOMS - -
MEASURING Laser LASR M9 2
FAST M9 1
MEASURING Levels LEVL M9 1
CAST - -
MEASURING Marking MARK M9 1 PROPS SM9 1
MEASURING Rulers RULE/SQR M9 1 LIFT M9 2
MEASURING Squares SQR/MULT/RECP - - LUBE - -
MEASURING Tapes JERRY - -
TAPE M9 1 GENERAL NOTES BULK HDWL/S 4
MISCELLANEOUS Cleaning CLN M9 1 Architectural documents to be read in conjunction with relevant
MISCELLANEOUS Consumables CONS M9 1 Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
OUTDOOR TOOLS Garden GARD M9 & SM9 1&1 conjunction with- appropriate sections of technical specification.
OUTDOOR TOOLS OPE OPE M9 2 Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
OUTDOOR TOOLS Pressure Washers PW M8 2 inconsistencies and resolve all discrepancies on plans and site
OUTDOOR TOOLS Pressure Washers PW/GEN - - conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
POWER TOOLS ACCESSORIES Commencement of works on site by the contractor is deemed to
Abrasives ABR - -
be acceptance of all conditions and plans and any variations will
POWER TOOLS ACCESSORIES Batteries & Chargers BATT - - be the responsibility of the contractor expense.
TOTAL TOOLS (FRANCHISEE)
POWER TOOLS ACCESSORIES Figured dimensions shall take precedence to scaled dimensions.
Cutting Discs DISC - -
Copyright of designs shown herein is retained by Allister Sarris.
POWER TOOLS ACCESSORIES Diamond Blades PTC M9 3 Written authority is required for any reproduction.
POWER TOOLS ACCESSORIES Drilling DRLL M9 3
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
ASSOCIATED PROJECTS
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 5
91.035
DB DB
COL COL COL COL
150
150
FHR
COL COL COL COL
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
EXISTING CONDITIONS PLAN FHR
DP DP DP DP DP RWH
RWHDP
BOL
FALL
FALL
BFC BFC
BOL BOL
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
BICYCLE PARK X 11
GENERAL NOTES
Architectural documents to be read in conjunction with relevant
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification. BOL
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense. TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
Written authority is required for any reproduction.
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
ASSOCIATED PROJECTS
FOR CONSTRUCTION
5
.82
20
No. AMENDMENT DATE
REVISIONS
Section 6
91.035
DB DB
COL COL COL COL
150
150
FHR
COL COL COL COL
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
DEMOLITION PLAN FHR
DP DP DP DP DP RWH
RWHDP
BOL
FALL
FALL
BFC BFC
BOL BOL
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
BICYCLE PARK X 11
GENERAL NOTES
Architectural documents to be read in conjunction with relevant
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification. BOL
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense. TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
Written authority is required for any reproduction.
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
ASSOCIATED PROJECTS
FOR CONSTRUCTION
5
.82
20
No. AMENDMENT DATE
REVISIONS
Section 7
NEW
COL 91.035
DB
NEW P2
COL
PROPOSED BUILDING WORKS
MEZZANINE FLOOR PLAN COL COL
P2
COL COL
150
150
FHR
COL COL COL COL
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
PROPOSED BUILDING WORKS PLAN
FHR
FINISHES SCHEDULE: DP
FALL
BFC
DP DP
NEW NEW NEW NEW NEW NEW
DP
BOL
RWHDP DP RWH
FALL
BFC
BOL BOL BOL (R) BOL (R) BOL (R) BOL (R) BOL (R) BOL (R)
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
P2
BICYCLE PARK X 11
GENERAL NOTES P3
Architectural documents to be read in conjunction with relevant BOL
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in P4
conjunction with- appropriate sections of technical specification.
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
NOTE: TOTAL TOOLS - CONTROL TABLE
conditions prior to commencement of any works on site. TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense. TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
5
.82
Written authority is required for any reproduction.
FOR CONSTRUCTION
ASSOCIATED PROJECTS
20
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
No. AMENDMENT DATE
REVISIONS
Section 8
1
DB
STORE ROOM
STAFF
A 1
MEZZANINE FLOOR PLAN AMENITIES FLOOR PLAN
DB
STORE ROOM
STAFF
MEZZANINE ELECTRICAL PLAN AMENITIES ELECTRICAL PLAN
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 9
DB
MEZZANINE REFLECTED CEILING PLAN AMENITIES REFLECTED CEILING PLAN
ELECTRICAL LEGEND FINISHES SCHEDULE: LIGHTING LEGEND
P2
P3
P4
NOTE:
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 10
P2
P2
ELEVATION A
P3
P2 STORE ROOM
P3
P2 STAFF BOL BOL
SECTION 1-1
No. AMENDMENT DATE
REVISIONS
[OCR of page images]
6400
2400 0.
600,
2400
PROVIDE SELECTED WALL MOUNTED INLINE
FAN AS SHOWN. FAN TO PROVIDE 130 m3/H.
TYP.
UMINIUM FRAMED WINDOWS AT 900 A-F.L.
SHOWN (TINTED GLAZING TO WINDOWS
FACING INTO RETAIL AREA).
FIN.FLR
600
| FIN.CLG
ILD UP NEW STUD WALLS TO GROUND /
EZZANINE FLOOR AS SHOWN. CLAD
AIL SIDE OF WALLS IN VILLABOARD.
PAINT AS PER ‘TOTAL TOOLS SPEC’s.
FIN.FLR
NEW STAIR TO MEZZANINE FLOOR.
TO STRUC ENGINEER’S DET
SPECI
REFER
D
ONS.
ELEVATION A
SCALE 1:100 in mm 0 1 2 3 4 5
FLUSH SUSPENDED P/BOARD
CEILING SYSTEM OVER MEZZ. FLOOR
AT 2400 AFLL.
FIN.CLG
STORE ROOM
ALUMINIUM FRAMED WINDOWS AT 900
AF.L. AS SHOWN (TINTED GLAZING TO
WINDOWS FACING INTO RETAIL AREA).
FIN.FLR
4850
~ FIN.CLG
BOL
TOP OF WALL FIXTURES
FIN.FLR
SELECTED 25mm STRUCTAFLOR SHEET FLOORING ON TIMBER / STEEL
BEAMES / FLOOR JOISTS AS PER STRUCTURAL ENG'RS DRAWINGS AND
DETAILS. TYP. NOTE: WORKS BY BULDER / DEVELOPER (NOT PART OF
SECTION 1-1 SHOP FITTERS WORKS)
SCALE 1:100 in mm 0 1 2 3 4 5
et ——
REVISIONS
No. J AMENDMENT DATE I SS DESIGN AS. PROJECT f REF. No. -
F_JREVISED DRAWING 16-06-17 | RoNITECTURE INTERIOR ESIGN DRAWN | WV. TOTAL TOOLS i PALTRY Vraanone REV
ASTRAL SNoAPORE CHECKED {AS. SHOP 1 & 2, 139 EUMUNDI ROAD
* ViSboure We S000" austora N60 Nerandea Rocd Sngpore 119063 APPROVED | T-7. NOOSAVILLE, QLD 4566 DRAWING WD04c F
PROPOSED BUILDING WORKS PLAN
T 461 433 263 928 T 461 433 263 928 DATE JAN’ 2017
E arris.com E olister@alistersarris com
W. wwwdinkedin.com/profile/view W_wewdinkedin.com/profile/view SCALE 1:200
SHEET — OF
Section 11
P3 P3
P2 P2
UNISEX/
4 DISABLED
3 1
2
1 ELEVATION 2 ELEVATION
AMB. 4
WC 3 1
2
P3
DISABLED TOILET PLAN P3
P2
P2
3 ELEVATION 4 ELEVATION
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 12
P3 P3 P3 P3
P2 P2 P2
1 ELEVATION 2 ELEVATION 3 ELEVATION 4 ELEVATION
1
P3
P2
1
- ELEVATION A - SECTION 1-1
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 13
NEW
COL 91.035
DB
NEW
COL
PROPOSED ELECTRICAL PLAN
MEZZANINE FLOOR PLAN COL COL COL COL
150
150
ELECTRICAL LEGEND
FHR
COL COL COL COL
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
FHR
DP DP DP DP DP RWH
RWHDP
BOL
FALL
FALL
PROPOSED ELECTRICAL PLAN BOL BOL
BFC
BOL
BOL
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
BFC
BOL BOL
BICYCLE PARK X 11
GENERAL NOTES
Architectural documents to be read in conjunction with relevant BOL
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification.
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense.
TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
5
.82
Written authority is required for any reproduction. ASSOCIATED PROJECTS
FOR CONSTRUCTION
20
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
No. AMENDMENT DATE
REVISIONS
Section 14
LIGHTING LEGEND : 1
NEW
COL 91.035
DB
NEW
COL
PROPOSED REFLECTED CEILING PLAN
MEZZANINE FLOOR PLAN COL COL COL COL
150
150
NOTE :
FHR
COL COL COL COL
NOTE :
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
FHR
DP DP DP DP DP RWH
RWHDP
BOL
FALL
FALL
PROPOSED REFLECTED CEILING PLAN BOL BOL
BFC
BOL
BOL
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL
BFC
BOL
BICYCLE PARK X 11
1
GENERAL NOTES
Architectural documents to be read in conjunction with relevant
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification. STORE ROOM
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will STAFF
be the responsibility of the contractor expense.
TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
Written authority is required for any reproduction.
Notify SARRIS ARCHITECTURE of any changes. No changes to
ASSOCIATED PROJECTS
SECTION 1-1 FOR CONSTRUCTION
occur without SARRIS approval.
No. AMENDMENT DATE
REVISIONS
Section 15
P4 P4
P4
P4
BUILDING 2 - WEST ELEVATION
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
TOTAL TOOLS (FRANCHISEE)
ASSOCIATED PROJECTS
GENERAL NOTES
Architectural documents to be read in conjunction with relevant
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification.
Contractor to verify all dimensions / condition on site prior to FINISHES SCHEDULE:
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site P2
conditions prior to commencement of any works on site.
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
P3
be the responsibility of the contractor expense.
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris. P4
Written authority is required for any reproduction.
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 16
ELEVATION 01
ELEVATION 02
NEW
COL 91.035
DB
NEW
COL
COL COL COL COL
150
150
GENERAL NOTES
02
Architectural documents to be read in conjunction with relevant
FHR
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil 01
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification.
COL COL COL COL
Contractor to verify all dimensions / condition on site prior to 5.0m SHARED ILLUMINATED
BIO-RETENTION AND
commencement of works. Contractor to seek clarification of all PYLON SIGN
TOTAL TOOLS - CONTROL TABLE
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site. TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will FHR
TOTAL TOOLS (FRANCHISEE) DP DP DP DP
RWH DP DP RWH
be the responsibility of the contractor expense. FALL
BOL BOL
BFC
BOL
BOL
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
BOL
BOL BOL BOL BOL BOL BOL
FALL
BOL BOL BOL BOL
BFC
BOL BOL BOL
Figured dimensions shall take precedence to scaled dimensions.
BICYCLE PARK X 11
Copyright of designs shown herein is retained by Allister Sarris.
Written authority is required for any reproduction.
Notify SARRIS ARCHITECTURE of any changes. No changes to
ASSOCIATED PROJECTS
TENANCY PLAN BOL
FOR CONSTRUCTION
occur without SARRIS approval.
No. AMENDMENT DATE
REVISIONS
Section 17
01
FINISHES SCHEDULE:
A
F
R
R F F R F
C
P
R
C
02
03
ELEVATION 3
R F R
04
SERVICE CENTER F
COUNTER PLAN
C
ELEVATION 4
F
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
TOTAL TOOLS (FRANCHISEE)
C C ASSOCIATED PROJECTS
ELEVATION 1 ELEVATION 2 FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 18
TOTAL TOOLS - CONTROL TABLE FINISHES SCHEDULE: KEY :
TOTAL TOOLS
A
TOTAL TOOLS (FRANCHISEE)
F
ASSOCIATED PROJECTS
C
P
R
05 P
F
R F
C C C
ELEVATION 5 ELEVATION 6
06
09 10
07
R
F
08
C C C
EXPRESS COUNTER PLAN ELEVATION 7 ELEVATION 8
FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 19
F F
C C C C
ELEVATION 9 ELEVATION 10
FINISHES SCHEDULE:
A
F
C
C
2 STOREMANS DESK PLAN P
R
A
FOR CONSTRUCTION
KEY :
B
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
TOTAL TOOLS (FRANCHISEE)
1 COUNTER ELECTRICAL PLAN ELEVATION A ELEVATION B ASSOCIATED PROJECTS
No. AMENDMENT DATE
REVISIONS
Section 20
FINISHES SCHEDULE:
A
F
R
C
P
R
R
F F
R
P R
F R
C
F F F F
F
R C R
P
C
C
F
F
C
C
GENERAL NOTES
Architectural documents to be read in conjunction with relevant
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification.
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
SERVICE COUNTER
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense.
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
Written authority is required for any reproduction.
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval. FOR CONSTRUCTION
No. AMENDMENT DATE
REVISIONS
Section 21
NEW
COL 91.035
DB
NEW
COL
PROPOSED EGRESS PLAN
MEZZANINE FLOOR PLAN COL COL COL COL
150
150
FHR
LEGEND :
COL COL COL COL
..\Bunbury WA\exit direction.jpg
5.0m SHARED ILLUMINATED
BIO-RETENTION AND
PYLON SIGN
STORMWATER DETENTION
BASIN 1
REFER CIVIL ENGINEERING
DESIGN FOR DETAILS
C:\ALISTER SARRIS\TOTAL TOOLS\Kilsyth\extinguisher.jpg
FHR
DP DP DP DP DP RWH
RWHDP
PROPOSED EGRESS PLAN FALL
BOL BOL
BFC
BOL
BOL
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
NEW
BOL (R)
BOL
BOL BOL BOL BOL BOL BOL
FALL
BOL BOL BOL BOL
BFC
BOL BOL
BICYCLE PARK X 11
GENERAL NOTES
Architectural documents to be read in conjunction with relevant BOL
Structural, Fire Service, Mechanical, Hydraulic, Electrical, Civil
and Landscaping documents. Technical drawings to be read in
conjunction with- appropriate sections of technical specification.
Contractor to verify all dimensions / condition on site prior to
commencement of works. Contractor to seek clarification of all
inconsistencies and resolve all discrepancies on plans and site
conditions prior to commencement of any works on site.
TOTAL TOOLS - CONTROL TABLE
TOTAL TOOLS
Commencement of works on site by the contractor is deemed to
be acceptance of all conditions and plans and any variations will
be the responsibility of the contractor expense.
TOTAL TOOLS (FRANCHISEE)
Figured dimensions shall take precedence to scaled dimensions.
Copyright of designs shown herein is retained by Allister Sarris.
5
.82
Written authority is required for any reproduction. ASSOCIATED PROJECTS
FOR CONSTRUCTION
20
Notify SARRIS ARCHITECTURE of any changes. No changes to
occur without SARRIS approval.
No. AMENDMENT DATE
REVISIONS
Section 22
C
L
L
C
FH
8.725
825
20.
BIO-RETENTIO
N AND STORM
DETEN WATER
REFER CIVIL TION BASIN
ENGINEERIN 1
FOR DETAIL G DESIGN
S
4
E
8.349
0
DP
10.09
BICYCLE
PARK X
11
37
D
FALL
11
.5
55
5
BOL
BOL
W
21
BOL
BFC
E
BOL
D
20
BOL
DP
DP
17
D
22
.1
05
8.736
TOTAL TOOLS SITE:
COL
D
23
BOL
BOL
DPRWH
BOL
DP
D
24
PP
BOL
ILLUMINATED 5.0m
KFC
BOL
PYLON
SIGN
W
24
BOL
BOL
91.035
BIO-RETENTIO
N
BASIN 2
DPRWH
BOL
FALL
BOL
W
25
SITE:
BOL
BIO-RETENTIO
D
25
BASIN 3 N
BOL
BFC
BOL
FRL 90/90
BOL
L
C
/90
C
L
BOL
150
The text continues on section 23.
Used in these records
TT Noosaville-Latest full set of drawing 'For Construction' (16-06-2017).pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.